Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-Finance | ₹3.7 L | L1 | Accepted-Finance Responsive |
| 2 | L2₹3.7 L+₹1,873.13 (0.50%)Rejected-Finance | ₹3.7 L+₹1,873.13 (0.50%) | L2 | Rejected-Finance Non-Responsive |
| Sl No | Description | Qty | Unit | Rakesh Chandra Bhardwaj L1 | Bhanu Prakash Singh L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation in all type of soil and rocks including lead, lift and disposal of surplus earth material as per direction of engineer - in -charge also including supply of all material labour T&p etc. required for proper complection of work for R/W, B/W | 17.44 | Cum. | 470.24 ₹1,476.29 Lowest | 472.6 ₹1,483.71 |
| 2.00 | Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 4.17 | Cum. | 1,125.54 ₹844.35 Lowest | 1,131.2 ₹848.59 |
| 3.00 | Random Rubble Stone Masonry laid dry in breast walls, retaining walls, parapets, scuppers, etc.including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 17.3 | Cum. | 2,475.36 ₹7,706.29 Lowest | 2,487.8 ₹7,745.01 |
| 4.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 51.5 | Cum. | 5,052.31 ₹46,833.76 Lowest | 5,077.7 ₹47,069.11 |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
5 Jun 2026, 3:00 pmClosed
Zonal Manager
NPCC Ltd, C-11, Turner road, Clement Town, Dehradun Uttarakhand
Restoration work at Tharali to Kimani MR
2026_CCUK_148005_1
UT-03-03 Aapda
National Competitive Bid
Civil Works - Roads
Item Rate
Tharali
As per technical bid
3 documents required · 3 mandatory
₹3,540
ZONAL MANAGER ,NPCC Ltd
₹8,000
18 Jun 2026
27 May 2026
5 Jun 2026
27 May 2026
5 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in all type of soil and rocks including lead, lift and disposal of surplus earth material as per direction of engineer - in -charge also including supply of all material labour T&p etc. required for proper complection of work for R/W, B/W | 0.96 | Cum. | 472.6 | ₹453.7 |
| 2 | Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 0.4 | Cum. | 1,131.2 | ₹451.35 |
| 3 | Random Rubble Stone Masonry laid dry in breast walls, retaining walls, parapets, scuppers, etc.including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 0.36 | Cum. | 2,487.8 | ₹893.12 |
| 4 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 0.48 | Cum. | 5,077.7 | ₹2,432.22 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
SBD.pdf
Tender Documents • 1.84 MB
BOQ_230936.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .