Loading…
Loading…
2,376 results • Latest
Complete machining of Bracket with BHEL Material
BRACKET
SPL REPAIR TO BLDG NO T195 OTM ACCN AND TO THE EXISTING DRAINAGE LINE FROM CSD CANTEEN TO KOTE KOTE TO MT AREA AND PROVN OF TOILET BLOCK NEAR MT GARAGE AT MIL STN HALDWANI UNDER GE RANIKHET
Surface excavation not exceeding 0.30m deep and averaging 15 cm deep getting out hard/dense soil all as spd & directed by Engr-in charge .
NORMAL SALINE (500 ML/POLYPACK)
NORMAL SALINE (500 ml/POLYPACK)
UT084411, L094- Maithanaghat to Khitothiya MR Stage -1 and II, Length- 3.910km.
Earth work in hill road (hill side cutting):- Excavation in hilly area for construction of road in all types of soils, rocks & E&B etc. As met at site true to lines as per plan, L section cross slope, super elevation as required also including uprooting & cutting of bushes dressing of road surface to the required level and slopes with all lift & lead, required for safe disposal of surplus excavated material at suitable dumping places indicated in the drawing by mechanical means/ manual means and including construction of required coolie walling of minimum height of 0.60 mt with the stone available from the required hill side cutting for retaining of the muck , without damaging forest , forest land , utility and private properties ,including slip clearance and its safe disposal (same as per mentioned above for safe disposal of surplus excavated material ), till the completion of the work as per part II special conditions of contract , MORD Specification Clause 1601, 1602 & 1603 and as directed by Engineer-in-charge
Improvement of external lighting by replacing old ,existing damaged fittings and replacement of old damaged ACSR overhead line with AB cable
Supply of PVC sheathed L.T. AB Cable of 1.1 KV Grade Al Conductor cable as reqd as per IS-14255:1995,IS 8130:2013 and of size 3X35 + 1X25 + 1X16 sqmm.
UT084412 Rasiyamahadev to Nagni MR Stage-I and II
Earth work in hill road (hill side cutting):- Excavation in hilly area for construction of road in all types of soils, rocks & E&B etc. As met at site true to lines as per plan, L section cross slope, super elevation as required also including uprooting & cutting of bushes dressing of road surface to the required level and slopes with all lift & lead, required for safe disposal of surplus excavated material at suitable dumping places indicated in the drawing by mechanical means/ manual means and including construction of required coolie walling of minimum height of 0.60 mt with the stone available from the required hill side cutting for retaining of the muck , without damaging forest , forest land , utility and private properties ,including slip clearance and its safe disposal (same as per mentioned above for safe disposal of surplus excavated material ), till the completion of the work as per part II special conditions of contract , MORD Specification Clause 1601, 1602 & 1603 and as directed by Engineer-in-charge.