Loading…
Loading…
7,717 results • Latest
CMOS Camera for microscope setup and stabilized halogen
Extensometer for existing KAPPA 100 SS-CF machine
Digital Temperature Indicator (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Mobile Storage Compactors (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7088028 Dated : 16-01-2026 Bid Document 1/14, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PURCHASE OFFICER, CRPU ACTING FOR & ON BEHALF OF THE PRESIDENT OF INDIA. Directorate Of Purchase And Stores, Department of Atomic Energy, Sector-1, Block-AF, Bidhan Nagar, Salt Lake, Kolkata - 700 064, OUR CASE FILE NO. DPS/CRPU/VECC/31487A. (.)
High Vacuum Pumping system as per specifications
Sleeve Cutting Machine
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 1 Suppying, fabricating, installing, placing and securing in position steel grills for windows comprising of square bars MS flats as per detailed .., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 2 Providing and applying painting Two coats of synthetic enamel on concrete surface including removing/scrapping the peeled off damaged paint, app.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 3 1 Writing letters numbers arrows of following size Greater than 5cm and upto 10 cm; As per tender document, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 3 2 Writing letters numbers arrows of following size Greater than 10cm and upto 15 cm; As per tender document, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 3 3 Writing letters numbers arrows of following size Greater than 15cm and upto 20 cm; As per tender document, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 3 4 Writing letters numbers arrows of following size Greater than 25cm and upto 30 cm; As per tender document
Supply, installation and training of latest version of network perpetual license of MIKE Software
Multifunction Printer (Print, Scan, Copy) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
E-cart for Goods (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Polyethylene Pipes for Water Supply conforming to IS 4984 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Custom Bid for Services - Installation, calibration, testing & commissioning of various instruments & control elements with associated fabrication & installation of mounting- structures, cutting & welding on SS pipe lines, installation of SS tubings &.. Similar Category Piping Erection Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Supply of spares for ash handling system of boiler UNDER
iPA II-SL10 INTELLIGENT PREAMP compatible with BEGe Detector
Electronic Level along with essential accessories
Hand Held Explosive Detector (HHED) as per MHA QR (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Facility Management Services - LumpSum Based - Industrial; Hiring of one tractor for supply of drinking water; Consumables to be provided by service provider (inclusive in contract cost)
Professional Painting Service - As per Technical Specifications; NA; As per Technical Specifications
Digital pH Meter (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Three Level Terminal Block with LED Indication and Accessories
Industrial Switch (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Laboratory furniture modules encompassing seating, storage facilities, and workstations
SECURITY STRUCTURE FOR MAIN OUTFALL
Digital Multimeter (Q3) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Pallet Truck (V3) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Electrical Rescue Rod (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Solvent( Mono-2-ethylhexyl(2- Ethyl hexyl) Phosphonate
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit 3 and 4; Overhauling inspection and servicing of BHEL supplied HP and LP Turbine Generator of Unit 3 as per BOQ item no 1; As per Scope of.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit 3 and 4; Overhauling inspection and servicing of BHEL supplied HP and LP Turbine Generator of Unit 3 Governing System jobs as per BOQ item.., and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit 3 and 4; Overhauling inspection and servicing of BHEL supplied HP and LP Turbine Generator of Unit 3 Miscellaneous Jobs as per BOQ item no.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit 3 and 4; Overhauling inspection and servicing of BHEL supplied HP and LP Turbine Generator of Unit 4 as per BOQ item no 4; As per Scope of.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit 3 and 4; Overhauling inspection and servicing of BHEL supplied HP and LP Turbine Generator of Unit 4 Governing System jobs as per BOQ item.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit 3 and 4; Overhauling inspection and servicing of BHEL supplied HP and LP Turbine Generator of Unit 4 Miscellaneous Jobs as per BOQ item no.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit 3 and 4; Overhauling inspection and servicing of BHEL supplied HP and LP Turbine Generator of any Unit 3 and 4 as per BOQ item no 7 Note A..
Cylinder Stand (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
80 NB ELECTRO MAGNET FLOW METER FOR TEST SETUP AS PER SPECIFICATIONS
Goods Transport Service – Per Trip based Service - Empty Drums and others machinery; Full body top open; 7 MT capacity x 18 feet length
Astronomical Timer for Street Light Control (Timer Controls) as per IS 9000 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
CORRUGATED BOXES FOR EPC AS PER SPECIFICATION
Spare for Carbon Sulphur Analyser Model CS 600 Make LECO Assy Card Sm Lf Ethernet Can Bridge Cs600 Part No 666 573G120, Spare for Carbon Sulphur Analyser Make LECO USA Model CS600 Assy Card Pgm Lf Ethernet Part No 666 310F210, Spare for LECO Make Gas Analyzer Model CS600 TN600 RHEN600 TC600 Assy card Sm Lf Ecl li Man Intrf Part No 666 321H, Spare for Carbon Sulphur Analyzer Make LECO Model CS 600 Assy Card Sm Lf Ecl 12 PI Distribution Part No 666 512E, Spare for LECO Make Gas Analyzer Model CS600 TN600 RHEN600 TC600 Assy card SM LF ECL Li DYN FLOW Part No 666 315H, Spare For LECO Analysers Model TN 600 TC 600 and RHEN 600 Part No 604 215 Pump 230 V Centrifugal Mad Drive, Spare for LECO Make Gas Analyzer Model TN600 TC600 RHEN600 Assy Card Sm Lf Eclipse Elec Furnace Part No 666 293J, Spare for Nitrogen Analyser Model TN 600 Make LECO Assy Card Sm Lf Ecl Dual Htr V2 Part No 666 514F120
Diesel Exhaust Fluid ISI marked to IS 17042 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Automotive Cleaner (V2) (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
SUPPLY & INSTALLATION OF VIVADO ML ENTERPRISE EDITION SOFTWARE WITH FLOATING LICENSE-SEE ANNEXURE-I
Supply of Oil Pump assembly for Chiller model: - PEH 100 of M/s Kirloskar Chillers Pvt Ltd
High Efficiency Particulate Air (HEPA) filter modules as per attached specification sheet
GM Counter (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
annual civil maintenaces work at turamdih township