Loading…
Loading…
7,717 results • Latest
INJECTION HCG 5000 IU
EYE DROP LOTEPREDNOL 0.2%, BOTTLE 5% DNS 500 mL, BOTTLE 5% DEXTROSE 500 mL
Centre Drill -as per IS 6708, IS 6709 (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Customized AMC/CMC for Pre-owned Products - AMC OF HP make wide format plotter printer with scanner model HP Design Jet T2530 multifunction plotter printer AMC will be on quarterly basis for Two year as per ATC; HP make wide format plotter printer wi..
Seat Ring, Part no. 4, of Drawing No. OKM-M-1260&1261, Disc, Part no. 2, Shaft, Part no. 3
Pre filtration cartridges, Activated carbon Cartridge, RO Module, Ultra polishing cartridge, UV lamp with SS housing, Ultrafiltration cartridge, End point Filter, Level sensor, Solenoid Valve, Conductivity Cell, PVC tube and PVC connector, Installation of above eleven spare indented items
Customized AMC/CMC for Pre-owned Products - Annual maintenance contract of existing LSA counting system at ESL NAPS for the period of two years with four (4) number of visits in two years; M/s Revvity Health care Pvt Ltd (Formerly Perkin Elmer); Annu..
TUNGSTEN FILAMENT, TUNGSTEN SOLID CATHODE, SOLID CATHODE CONNECTING
Customized AMC/CMC for Pre-owned Products - Comprehensive Annual maintenance of automated Key-Fob dispenser (Keymanagement system) with 32 keys slot capacity for two years with spares parts; M/s Impex Engineering Corporation; Comprehensive Maintenanc..
AUX CONTACTOR - 3TH30, 2 NO plus 2NC, 220V DC, AUX CONTACTOR - 3TH30, 4 NO, 220V DC, AUX CONTACTOR - 3TH30, 3 NO plus 1NC, 220V DC, CONTACTOR - 3RH24, 220V DC, 3 NO plus 1NC, CONTACTOR - 3RH24, 220V DC, 2NO plus 2NC, AUX CONTACTOR - 3TH30 ADD ON - 1NO, 3RH24 AUX CONTACTS - 2 NO plus 2NC
Acrylic Sandwich Display Board 9” X 13”, Acrylic Sandwich Display Board 13" x 19", Acrylic Sandwich Display Board 19" x 26"
Dynamic temperature control system along with its accessories
Scissor Lift (V3) (Q2), Pallet Truck (V3) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
MOLECULAR SIEVES TYPE-13X AS PER ATTACHED SPECIFICATION.
Ms Flowserve Sanmar Ltd make spares of mechnical seal
Supply of shuttle tube assembly as per attached drawings, Roll pin Dia 6.35mm X 70mm Long, material-Inconel X 700
Active process water system pump mechanical seal spares
Ultra high precision 0.001%, high stability 50ppm as per attached Technical Specification
Item No.1, Item No.2, Item No.3, Item No.4, Item No.5, Item No.6, Item No.7, Item No.8, Item No.9, Item No.10, Item No.11, Item No.12, Item No.13, Item No.14, Item No.15, Item No.16, Item No.17, Item No.18, Item No.19, Item No.20, Item No.21, Item No.22, Item No.23, Item No.24, Item No.25, Item No.26, Item No.27, Item No.28, Item No.29, Item No.30, Item No.31, Item No.32, Item No.33
High Carbon steel Grinding Rod with dia 100 mm and 3.7m length
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - NCCCM-BARC; Metal roof shed work and associated works for Gas cylinder shed and parking the two & four wheelers at NCCCM-BARC, Hyderabad; Service Provider
Carbide tipped Circular saw blade (360x40x2.25x2.6x100T) for cutting of ends of extruded hollows
Custom Bid for Services - Maintaining and housekeeping of radioactive laboratories and plant areas at CDCFT OTF WIP and ETP of Process Development Division for a period of one year as per technical specifications Annexure 1 Similar Category Operation And Maintenance Of Other Machines And Plants
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Portable Vibration meters
Facility Management Services - LumpSum Based - Residential; O&M of Mechanical Work; Consumables to be provided by buyer
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Laboratory Beakers (V3) Confirming to IS 2619 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Ultrasonic Level Transmitter (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Toilet Paper (V3) Conforming to IS 14661 (Q4) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Paperless Recorder (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Conventional Manual Call Point Make Apollo Fire Detectors Ltd Model Orbis Part No 55100 031 APO, Conventional Multi Sensor with base Make Apollo Fire Detectors Ltd Model Orbis Part No ORB OH 13003 APO, Conventional Heat Detector with base Make Apollo Fire Detectors Ltd Model Orbis Part No ORB HT 11013 APO, Conventional Optical Smoke Detector with base Make Apollo Fire Detectors Ltd Model Orbis Part No ORB OP 12003 APO, Intelligent Input Output Module Make Apollo Fire Detectors Ltd Part No SA4700 102APO, Addressable Manual Call Point Make Apollo Fire Detectors Ltd Part No SA5900 908APO, Addressable Sounders Make Apollo Fire Detectors Ltd Part No 55000 001APO, Addressable Multi Sensor with Base Make Apollo Fire Detectors Ltd Model Soteria Part No SA5100 700APO, Addressable Heat Detector with base Make Apollo Fire Detectors Ltd Model Soteria Part No SA5100 400APO, Optical Smoke Detector with base Make Apollo Fire Detectors Ltd Model Soteria Part No SA5100 600APO
Office Suite Software (V3) (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6963252 Dated : 08-12-2025 Bid Document 1/8 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Vehicle Access Control System and associated accessories
CAUSTIC SODA LYE 47% W/W RAYON GRADE ON 100% NAOH BASIS ABSOLUTELY MERCURY FREE
Electrical Equipments and Accessories 45, Electrical Equipments and Accessories 46, Electrical Equipments and Accessories 47, Electrical Equipments and Accessories 48, Electrical Equipments and Accessories 49, Electrical Equipments and Accessories 50, Electrical Equipments and Accessories 51, Electrical Equipments and Accessories 52, Electrical Equipments and Accessories 53, Electrical Equipments and Accessories 54, Electrical Equipments and Accessories 55, Electrical Equipments and Accessories 56, Electrical Equipments and Accessories 57, Electrical Equipments and Accessories 58, Electrical Equipments and Accessories 59, Electrical Equipments and Accessories 60, Electrical Equipments and Accessories 61, Electrical Equipments and Accessories 62, Electrical Equipments and Accessories 63, Electrical Equipments and Accessories 64, Electrical Equipments and Accessories 65, Electrical Equipments and Accessories 66, Electrical Equipments and Accessories 67, Electrical Equipments and Accessories 68, Electrical Equipments and Accessories 69, Electrical Equipments and Accessories 70, Electrical Equipments and Accessories 71, Electrical Equipments and Accessories 72, Electrical Equipments and Accessories 73, Electrical Equipments and Accessories 74, Electrical Equipments and Accessories 75, Electrical Equipments and Accessories 76, Electrical Equipments and Accessories 77, Electrical Equipments and Accessories 78, Electrical Equipments and Accessories 79, Electrical Equipments and Accessories 80, Electrical Equipments and Accessories 81, Electrical Equipments and Accessories 82, Electrical Equipments and Accessories 83, Electrical Equipments and Accessories 84, Electrical Equipments and Accessories 85, Electrical Equipments and Accessories 86, Electrical Equipments and Accessories 87, Electrical Equipments and Accessories 88, Electrical Equipments and Accessories 89, Electrical Equipments and Accessories 90, Electrical Equipments and Accessories 91, Electrical Equipments and Accessories 92, Electrical Equipments and Accessories 93, Electrical Equipments and Accessories 94, Electrical Equipments and Accessories 95, Electrical Equipments and Accessories 96, Electrical Equipments and Accessories 97, Electrical Equipments and Accessories 98, Electrical Equipments and Accessories 99, Electrical Equipments and Accessories 100, Electrical Equipments and Accessories 101, Electrical Equipments and Accessories 102, Electrical Equipments and Accessories 103, Electrical Equipments and Accessories 104, Electrical Equipments and Accessories 105, Electrical Equipments and Accessories 106, Electrical Equipments and Accessories 107, Electrical Equipments and Accessories 108, Electrical Equipments and Accessories 109, Electrical Equipments and Accessories 110, Electrical Equipments and Accessories 111, Electrical Equipments and Accessories 112, Electrical Equipments and Accessories 113, Electrical Equipments and Accessories 114, Electrical Equipments and Accessories 115, Electrical Equipments and Accessories 116, Electrical Equipments and Accessories 117, Electrical Equipments and Accessories 118, Electrical Equipments and Accessories 119, Electrical Equipments and Accessories 120, Electrical Equipments and Accessories 121, Electrical Equipments and Accessories 122, Electrical Equipments and Accessories 123, Electrical Equipments and Accessories 124, Electrical Equipments and Accessories 125, Electrical Equipments and Accessories 126, Electrical Equipments and Accessories 127, Electrical Equipments, Electrical Equipments and Accessories 129, Electrical Equipments and Accessories 130, Electrical Equipments and Accessories 131, Electrical Equipments and Accessories 132, Electrical Equipments and Accessories 133, Electrical Equipments and Accessories 134, Electrical Equipments and Accessories 135, Electrical Equipments and Accessories 136, Electrical Equipments and Accessories 137, Electrical Equipments and Accessories 138, Electrical Equipments and Accessories 139, Electrical Equipments and Accessories 140, Electrical Equipments and Accessories 141, Electrical Equipments and Accessories 142, Electrical Equipments and Accessories 143, Electrical Equipments and Accessories 144, Electrical Equipments and Accessories 145, Electrical Equipments and Accessories 146, Electrical Equipments and Accessories 147, Electrical Equipments and Accessories 148, Electrical Equipments and Accessories 149, Electrical Equipments and Accessories 150, Electrical Equipments and Accessories 151, Electrical Equipments and Accessories 152, Electrical Equipments and Accessories 153, Electrical Equipments and Accessories 154, Electrical Equipments and Accessories 155, Electrical Equipments and Accessories 156, Electrical Equipments and Accessories 157, Electrical Equipments and Accessories 158, Electrical Equipments and Accessories 159, Electrical Equipments and Accessories 160, Electrical Equipments and Accessories 161, Electrical Equipments and Accessories 162, Electrical Equipments and Accessories 163, Electrical Equipments and Accessories 164, Electrical Equipments and Accessories 165, Electrical Equipments and Accessories 166, Electrical Equipments and Accessories 167, Electrical Equipments and Accessories 168, Electrical Equipments and Accessories 169, Electrical Equipments and Accessories 170, Electrical Equipments and Accessories 171, Electrical Equipments and Accessories 172, Electrical Equipments and Accessories 173, Electrical Equipments and Accessories 174, Electrical Equipments and Accessories 175, Electrical Equipments and Accessories 176, Electrical Equipments and Accessories 177, Electrical Equipments and Accessories 178, Electrical Equipments and Accessories 179, Electrical Equipments and Accessories 180, Electrical Equipments and Accessories 181, Electrical Equipments and Accessories 182, Electrical Equipments and Accessories 183, Electrical Equipments and Accessories 184, Electrical Equipments and Accessories 185, Electrical Equipments and Accessories 186, Electrical Equipments and Accessories 187, Electrical Equipments and Accessories 188, Electrical Equipments and Accessories 189, Electrical Equipments and Accessories 190, Electrical Equipments and Accessories 191, Electrical Equipments and Accessories 192, Electrical Equipments and Accessories 193, Electrical Equipments and Accessories 194, Electrical Equipments and Accessories 195, Electrical Equipments and Accessories 196, Electrical Equipments and Accessories 197, Electrical Equipments and Accessories 198, Electrical Equipments and Accessories 199, Electrical Equipments and Accessories 200
Refilling of Industrial Gases in Cylinders - Helium Gas Purified to 99.995%; Cubic Meter
Supply installation and commissioning of Schrack and
3 phase DOL starter for submersible pump, Single phase starter with volt/Amp meter for submersible pump, 3 phase four pole ELCP/RCCP 30/40Amps, Single phase two pole ELCP/RCCP 20/30Amps