Loading…
Loading…
133 results • Latest
Self Priming Pump Conforming To IS5120 (Q3)
Construction of motorable footpath from Sandhya Garage to Pantu house by covering Pre Cast Slab over drain and providing GI pipe hand railing at Sea Shore, Haddo, Ward no.02.
Stable Bleaching Powder for Household and Industrial use (V3) conforming to IS 1065 (Part 1) (Q3)
Renovation of footpath from Shri. Surya Rao House to join the main road at Satellite Gate, Anarkali in Ward no.03
ALLOTMENT OF PARKING LOT IN VARIOUS PLACES IN MUNICIPAL AREA
Renovation of existing road from Islander Inn to Buddhist Temple in Phongy Kyaung in Ward no.06.
Renovation of footpath and drain with concrete cover slab from Shri. Paritosh house to Shri.Shankar Dutta house at Prem Nagar Ward no.07
Repair and Maintenance of Footpath Starting From Bullu Pan Shop Dilli Rao House Janai House via Sukra House to Pradhan House at Lall Bijan Dairy Farm in Ward No 09
Construction of Indoor Game Shed behind Teachers Quarter at Garacharma in Ward No.18.
Renovation of road side drain with covering slab both sides near Hanuman junction at Haddo Ward no.02
Cyber Security Audit - Security and Compliance Audit
Reconstruction of Public Toilet near Manikamma Temple at Ladai Basthi Lillypur ward no. 01
Construction of RCC Water tank infront of Gandhi Market Block V at Mohanpura, Ward No. 04 .
Development of playground with chain-link fencing and construction of a small stage with prefabricated steel roofing at Sunder Colony ward no. 02.
Cotton Thread-Twine (Q3)
Tea Set (V2) (Q4), Glass Tableware (V2) Conforming to IS 1961 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Electric Kettlesand Jugsfor Householdand Similar Useas per IS367 (V2) (Q3)
Register (V2) (Q4), Note Sheet Pad (Azure Laid) (V3) (Q4), Air Freshener liquid (V3) (Q4), Correction Fluid Pen(V3) (Q4), Pressure Sensitive Adhesive Tapes with Plastic Base (V4) Conforming to IS 13262 (Q4), Staple Pins/Staples(V3) (Q4), Staplers(V3) (Q4), Writing Pens (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Shawl (Handloom) (Q3)
Dinner Set (V2) (Q4)
Wall Clocks (Battery Operated) (V2) Conformingto IS12510 (Q4)
Construction of CC Road and Box Type Culvert with Hollow Blocks Wall Works and Covering Slabs starting from Shri Sathaiah s House to Shri Srinuwas Rao s Gandi House at Japan Road Dairy Farm Ward No 15
Providing and replacement of 80 mm from 65 mm GI pipe line from the existing of 80 and 150 mm GI and DI pipe line from opposite TTI Collage to Shri.Harbin Singh (opp. Nehru Kendra ), Uma house to Krishna house and Shri Prashant House and 100 mm dia
Construction of Ring well inside Kali Mandir at Ward No.07
Providing and laying 80mm to 50mm dia GI pipe line from Shri.Shah House to Shri. Tapan Kumar Halder House Jawahar Colony Road in Ward No.15
Providing and laying 50mm, 65mm and 80mm dia GI branch pipe line from Hudco Colony to Manoj House via Ajith House for Sky line Colony at School line in Ward No.15
Resurfacing of road side drain and replacement of cover slabs from home needs store to Atlanta Point general store alongwith construction of 01 no.culvert near Gani house in Atlanta Point Ward no.05.
Construction of road side retaining wall from Late. Shri. Samuel Contractors house to Hitech Civil Engineers Pvt. Ltd. Buniyadabad Ward no. 08
Resurfacing of road and drain from main road to Vasudevan Residency at Roop Narayana Colony Garacharma in Ward No.24.
Repair and maintenance of footpath starting from Shri. Karagana Bhima Raos house to Shri. Sadhas house at Dairy Farm in ward No. 15
Compostable Bio-Medical Waste Collection Bags (Biohazard Bags) (V3) (Q3)
Repair and maintenance of existing well and protect retaining wall behind Shri. Nagaraj house at Shivaji colony, Ward No.24.
Construction of footpath and covering slab from Shri Rizwan House to Shri Sarfraz house at Old Pahargaon Ward No 16
Providing, laying, replacement, and extension of 65 mm, 50 mm, 40 mm, and 80 mm dia GI branch pipelines from Megapode Main Road near the Zoological Office to the house of Shri Purshottam at Megapode, Ward No. 03, replacement of 80 mm, 65 mm, and 50 m
Construction of motorable road starting from Shri Tarak Saha House to Shri Latheif House at Shadipur in Ward No 10
Renovation of motorable and footpath steps side drain flooring and construction of side drain wall and hand railing starting from peon qtr ending to Malaikandaiah Dhara Devi and Rajan House at Peon qrts area in Ward No 10
Ordinary Port Land Cement 43 Grade, 50kg bag, Pulverised Sand, Stone Chips 20mm nominal size, River Sand Fine Sand, Standard Hard Wood Timber of 6 ft by 1 ft, Standard Hard Wood Timber of 8 inches by 1 inch, I.W Nails of size one and half inch, I.W Nails of size 2 inch, I.W Nails of size 2 and half inch, I.W Nails of size 3 inch, Marine Ply 8 ft by 4 ft by 12 mm Green Ply and Kit Ply
Repair of CC Motorable road and drain starting from Ganesh to Arumugam house at Old Pahargaon in Ward No.16
LED floodlight fixture, 25 W LED Post Top Luminaire, 3 metre decorative octagonal steel pole, HDL Neon Flex Light, 10 W LED Bollard Luminaire, Underground armoured power cable, 16 sq mm, two core, Miniature Circuit Breaker, 32 Ampere, Outdoor Junction Box, Porcelain Rewirable Fuse Unit, Moulded Case Circuit Breaker
Resurfacing of Back Top Road starting from Ram Mandir to Ram Babu House at Lamba Line in Ward No 09
Construction of retaining wall to protect public footpath including drain near Kala Ammal House Dimple House Jayanthi House at Police Line in Ward No 10
Construction of road side RCC retaining wall to protect public motorable road near Subramani House, Mothi House Bijeapen House at Peon Qtrs area Shadipur in Ward No 10
E TENDER FOR LEASING OUT BUILDING TO RUN RESTAURANT AT FORESHORE ROAD PHOENIX BAY TO CHATHAM NEAR MEGAPODE JUNCTION
Extension and Revamping of Existing Community Hall at Pathergudda in Ward No.23.
Resurfacing and construction of Black Top Road and RCC Retaining Wall near Shri Kumar House ABC Colony Shadipur in Ward No 11
Construction of CC Road from Nagesh House to Kerketta House behind Kali Mandir via Govinda Raj House at Rajaji Nagar in Ward No.24.
Maintenance and Filling of Potholes in Black top Road at various places in Ward No.19.
Providing and Laying of 80 mm and 65 mm GI pipe line from the existing of 150mm dia DG pipe line Shri.Nishav (PBMC) house to Mohd. Jahoor house, Opposite RP Store to Meenakshi house and from the existing of 65mm GI pipe line from Laxmi Pan Shop to Sm
Providing and replacement of 80 mm from 65 mm GI pipe line from the existing of 80 and 150 mm GI and DI pipe line from opposite TTI Collage to Shri.Harbin Singh (opp. Nehru Kendra ), Uma house to Krishna house and Shri Prashant House and 100 mm dia
Repair and Maintenance of Community Hall near Ganesh Mandir at Dairy Farm in ward No 14