Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-Finance | L1 | Accepted-Finance verified | |
| 2 | L2₹10.6 L+₹37,714.22 (3.70%)Accepted-Finance 1D 70A NIT FARIDABAD HARYANA 121001 | FARIDABAD | HARYANA | 121001 | L2 | Accepted-Finance verified |
Tender Value
₹9.4 L
EMD Value
₹18,857
Closing Date
30 Sept 2026, 3:00 pmClosed
EE-II (WKS) SVPMC
EE-II (WKS) SVPMC
Repair and maintenance of Hand Railing and footpath with covering slab at various places in Ward No 16 On the eve of Shramdaan
2026_PMBC_24846_1
22/EE-II/Wks/MC/2026-27
Open Tender
Civil Works - Others
Works
90 days
In Ward No 16
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹18,857
1 Oct 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -in - charge.Nominal concrete 1:4:8 or leaner mix (including equivalent
design mix) | 5 | cum | 2,121.35 | ₹10,606.75 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form for
a) Foundations, footings, bases of columns, etc. for mass concrete | 46.08 | Sqm | 553.26 | ₹25,494.22 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for
a) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 40.1 | Sqm | 1,188.64 | ₹47,664.46 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 55.5 | cum | 11,115.38 | ₹6,16,903.59 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5 | cum | 13,960.64 | ₹69,803.2 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
A)Thermo-Mechanically Treated bars of grade Fe-500D or more. | 296.05 | kgs | 152.16 | ₹45,046.97 |
| 7 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like,
including the cost of required centering, shuttering but excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3 | cum | 14,935.12 | ₹44,805.36 |
| 8 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. | 8 | Sqm | 1,380.45 | ₹11,043.6 |
| 9 | 12 mm cement plaster of mix :
13.1.1 1:4 (1 cement: 4 fine sand) | 146 | Sqm | 489.64 | ₹71,487.44 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_26292.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .