Loading
Loading…
Loading…
Found 2 active tenders
2 results • Latest
same as above
HT Line( Supply Part)
Construction of Protection work of Iqbal Micro Project Canal along the alignment of Approach Road.
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.