Loading…
Loading…
5,621 results • Latest
Improvements to the road Agali to Jammulabanda (via) Ramanahalli, Rolla Mandalahalli and Gudibanda from Km.16/0-18/2, 18/6-19/4, 19/5-321/2, 21/4-24/0 in Sri Satya Sai District (2nd Call)
Improvements to the road Rolla to (Vannarana Halli) Rantavala State Border (via) Dommarahatti, Dosegowdana Halli and Poolapalli from km.3/0 to 5/4 in Sri Satya Sai District (2nd Call)
2025-Eng01-02-130 Providing CC drain from Chappati Srinivas house to DSP house and Ashareddy Suppliers opp to Pump House opp near Valandapeta under Nammivanipeta Sachivalayam (21089012) in ward no.02 Bheemili ZONE-I of GVMC.
Construction of CC Drain from 1. abdhul ameen house (d.no: 5/14-4) to haseena begam (d.no: 5/172-3-5) & 2. rehmanan beg house (d.no:5/113-5) to bajeed beg house (d.no: 5/122-5) in ward no.5 of pedana municiplality under 15th fc 2024-25 (1st instalment) untied grant.
Improvements to the road Tarlupadu - Tadivaripalli Road from Km. 6/0 to 14/150 in Prakasam District
Monsoon Actin Plan -2026 Desiltation of Drain at Rami Reddy Nagar Main Road and Rami Reddy Nagar nagar Main Road to Isckon Temple Road In Div No.29 Under AE-18 Section
Construction of Compound Wall from 0/146 to meters chainage to 90/146 meters chainage around 600 KL ELSR, in chenchula colony, ward no.11 of pedana municipality under 15th fc 2020-21 (1st installment) UnTied grant.
Improvements of service road from Km 185 000 to 187 000 of RBLLC
Protection arrangements and laying CC Road on inspection path of UTs at Km 25 127 Km 30 420 Km35 300 and Km36 670 of RBLLC
Improvements to the road Hemavathi to State border road (via) Nidragatta from Km.3/5 to 7/300 in Sri Satya Sai District (2nd Call)
Engaging of Electricians and Valve operators during outsourcing workers strike period at Takkellapadu Head water works
Improvements to the road Kothapalli - Pittakayagulla Road from Km. 4/2 to 4/4 in Prakasam District
Providing CC Culvert and CC Roads from 1. Library to kundem tandava krishna satyanarayana house (d.no: 15/107-12) & 2. kollipara purna pradeep house (d.no:15/177-12) to kettepalli venkata ramana house (d.no:15/174-12) in ward no.16 of pedana municiplality under 15th fc 2024-25 (1st instalment) untied grant.
Improvements to the road T.D.Palli cross to M.R Gollahatti State border road from km.0/0 to 9/2 in Sri Satya Sai District (2nd Call)
[Mansoon Action Plan -2026] Removal of Wet Silt in Existing Drains in Various Locations at Adavitakkellapadu Areas in Div No.41 Under AE-1 Section.
Improvements to UT at Km 2 575 of RBLLC
PROVIDING CENTER LIGHTING AND GYM EQUIPMENT,CHILDREN PLAY EQUIPMENT AT SVN COLONY PARK IN DIV.NO 42 UNDER AE-01 SECTION (3rd Call)
(Monsoon action plan-2026) Providing Kutcha Drains at Balaji Nagar 10th & 11th line ,Pragathi Nagar Extension in Div.No.03 Under AE - 11 (LB Nagar) Section.
Improvements to the road Komarole - Singarapalli Road from Km. 17/2 to 17/4 in Prakasam District
Completion of incomplete Community Hall in M.Alamanda Village & GP in Devarapalli Mandal in Anakapalli Disrict ,Estimate cost of Rs.15.00 Lakhs. Grant : District Mineral Foundation Grant
Construction of Class Rooms and Tutorial Rooms at Rajiv Gandhi University of Knowledge Technologies (RGUKT) Ongole Campus, Ballipalli, Kanigiri Mandal In Prakasam District, Estimate Cost: Rs. 2500.00 Lakhs
Improvements to the road Yerrabalem - Mohiddinapuram Road from Km. 9/0 to 11/4, 11/7 to 12/8 in Prakasam District
Mansoon Action plan-2026 Removal of wet silt in CC Out fall drain at Reddypalem road from Sarada coloy 31st line to sanjeevaiah nagar railway gate and Vasantharayapuram main road from Sarada colony Arch center to Donka road and Donka road from 3bridges to tagoor statue North side in Div No 53 and 55 under AE-14 Section.
Construction of CC Drain from D .no: 1-5-77 to Box culvert and Krishna Temple to D.No: 1-5-40 and D.No: 1-5-40 to D.No: 1-5-32 in 28th Ward Mangayammarao Peta , Pithapuram Municipality.
Improvements to the road Cumbum Tank Bund Road from Km. 0/0 to 2/4 in Prakasam District
Construction of Rajagopuram to Sri Ranganayaka Swamy Temple, Veeravallipalem(V), Ainavilli(M) Dr.B.R.Ambedkar Konaseema District
(Monsoon action plan -2026) Engaging of the Hydraulic Excavator for Removal of Silt at Major Outfall Drain from Pragathi nagar up to NH-16 to Vejendla Donka under AE - 11 (LB Nagar) Section.
Construction of Toilet and Drinking Water Connection to Government owned and rent free Anganwadi centers at Krishnapuramu, Kesalingyapaali and Drinking water connection at Mulabata veedhi location of Mydukur Municipality
( MONSOON ACTION PLAN-2026) Removal of Silt from Burela vari veedhi to suddapalli donka main Road , Burela vari veedhi to Kanki kodavali Bomma Road and Ankama Thalli Temple road in Div.No. 10 Under AE - 13 (LB Nagar) Section.
Improvements to the road Riding surface of Vengamukkalapalem to Konijedu road from Km 0/350 to to 2/800 and Km.3/0 to 4/200 in Prakasam District
Construction of MRF centre at Compost yard in Div No.47 in Chittoor Municipal Corporation
Construction of protection walls approaches restoration of damaged apron to the UT at Km 140 900 and providing barricades either sides of Gonala village at Km143 300 and Jalihal village at Km 136 900 of RBLLC
Construction of CC Drain from 1. Perneti subbarayudu house (D.No.17/281-7) to Varudu Nageswararao house (D.No.17/285-4-7) & 2. Boddu Koteswararao house (D.No.17/309-7) to Balla Malleswararao house (D.No.17/145-7) in ward no.09 of Pedana Municiplalit under 15th FC 2024-25 (1st installement) untied grant.
Providing MS Fencing to Vacant Site at Master Minds School Opposite Plot No.208 at MIG in 63rd Division of Works Division-II
Construction of Community Hall at Kothur of Kovur GP in Kovur Mandal, Est.Cost:- 10.00 Lakhs
MonSoon Action Plan-2026 Removal of Wet Silt at Amaravathi Road East Side From Sivalayam Temple to Velangini Nagar Culvert,Sri Nagar 1st Line From Donka Road to Bharathpeta 9th Line and Donka Road in Div.no.49 Under AE-03 Section.
Construction of CC Drains fromD.no 12-2-127, Venjimuri Subrahmanyam to Temple Arch at main road & Kunti madhava swamy temple arch to Culvert at P.No 162/A2 near Kunti Madhava Swamy temple area in 17th Ward of Pithapuram Municipality
Laying of HDPE Water Supply Pipeline at beside to sadhana Boys Hostel from D No: 3-7-11-6-2 To D No: 3-7-11-6-1 ,near Gangireddy Hospital,Bakarapuram in Revenue Ward No :03 in Pulivendula Municipality
Improvements to Riding Surface Mulakalacheruvu- Kandlamadugu road (SH-411) from km 35/0 to 41/310 in Annamayya District
Improvements to road from KM 0/0 to 4/0 of Kurnool - Bellary Road in Kurnool District
Purchase of Exercise Therapy and Electro Therapy Units for the use in Area Hospital, Kavali in SPS Nellore District (4th Call)
Removal of wet silt in CC Out fall drain at Nehrunagar from New Guntur Railway station to Manipuram ROB,from Butchaiah thota Abarlapet to Nehrunagar Gate,Nehrunagar Donka road form Sanjeevaih nagar railway gate to Buchaiah thota vagu (Via Nehruanga Mahalakshmi Temple) and Nehruangar railway gate to Manipuram cabin in Div No.55 and 56 under AE-14 Section.
Water supply maintenance at NTR colony ELSR and Rajive colony bore for the Month of February 2026 to January - 2027 2nd call
Construction of Community Sanitary Complexes at Sri Lakshmi Narasimha Swamy temple at Thimmanacheruvu village of Peddapapur mandal
Construction of Community Sanitary Complexes at Aswardha Narayana Swmy temple at Chinnapappur village of Peddapapur mandal
Removal of wet silt in CC Out fall drain at Nehrunagar from New Guntur Railway station to Manipuram ROB,from Butchaiah thota Abarlapet to Nehrunagar Gate,Nehrunagar Donka road form Sanjeevaih nagar railway gate to Buchaiah thota vagu (Via Nehruanga Mahalakshmi Temple) and Nehruangar railway gate to Manipuram cabin in Div No.55 and 56 under AE-14 Section.
Completion of incomplete Community Hall in M.Alamanda Village & GP in Devarapalli Mandal in Anakapalli Disrict ,Estimate cost of Rs.15.00 Lakhs. Grant : District Mineral Foundation Grant
Repairs and Maintenance to ZP Guest house at Anakapalli Mandal in Anakapalli Disrict, Estimate cost of Rs.10.00 Lakhs. Grant : 15th Finance ZP (Untied
Completion of incomplete Community Hall in Satyanarayanapuram Village, H/o.Pedanandipalli GP in Devarapalli Mandal in Anakapalli Disrict ,Estimate cost of Rs.15.00 Lakhs. Grant : District Mineral Foundation Grant