Additional works of MAPS-1 Generator Rotor Removal and replacement of MAPS-2 Generator rotor and associated works during Unit-2 COH works as per SOW at NPCIL- MAPS-Kalpakkam
Overhauling of LP Turbine, Generator, Replacement of LP Heater-1 and other turbine works as per SOW at Unit-1, NTECL Vallur TPP (3x500MW)
Material Handling works at BHEL site, 2 X 660 MW Udangudi Supercritical Thermal Power Project
Additional works of HPT Inspection, Replacement of HP Valve Casing (RHS) Valve, Boroscopic Inspection of T Joint and arrangement of Induction Heating Machine as per SOW at Unit-2, RPCL- Yermarus TPS (800 MW)
Erection and Commissioning works for VFD retrofit for existing BHEL FEED RC feeders (10 Feeders per unit, Total 30 Feeders for three units) as per SOW at Unit-1,2,3 NTECL Vallur TPP (3x500MW)
Replacement of Exciter rotor along with Exciter Overhauling of Unit-4 (500MW) of NTPC Talcher STPS- Kaniha