Executing the Electrical pending points for ESP RM works of Unit No 1, 3 and 4 as per SOW at NALCO-Damanjodi SPP
Capital overhaul of LP Turbine including MPI,NFT and Bearing inspection and major inspection of Generator as per SOW at APGENCO-Dr.MVR RTPP Stage-III Unit No.5 (210 MW)
Inspection of HP and IP Stop valve and Control valves as per SOW at TNPGCL North Chennai TPS Stage-III (1x800MW)
Deployment of agency for Slush Cleaning works inside CW piping for unit 1 and unit 2 at BHEL/ 2x660MW Ennore SEZ STPP, Minjur, Ponneri Taluk, Tamil nadu
Additional works of pipe bending for Stator cooling water pipeline headers for 3 units as per SOW at KPCL Nagjhari HEP R and M of Unit-1,2,3.
Bearing inspection, Overhauling of LPT, Generator, overhauling of HP and IP valves and associated works as per SOW at Unit-3 Ms KPCL- Bellary TPS, 700MW