Additional Work of Stator insulation box repair, assistance for Overhang repair during Capital Overhaul of Generator and auxiliaries as per SOW at Unit.No.3, NTPC-Simhadri STPS, 500MW
Additional works of Overhauling of HP Turbine and IP Turbine, LPT bellow replacement (1Nos) during Overhauling of LP Turbine, Generator and Exciter and other related Works as per SOW at Unit-2 NNTPS (500MW)
Additional works of the gouging gas cutting of Check-nut of HP Control valve-1 during Inspection of HP and IP Stop and Control valves as per SOW at TNPGCL- North Chennai TPS Stage-III 1x800MW
Renovation of TDBFP Governing system for 3 units i.e. for 6 TDBFPs including shifting materials from NTPC stores as per SOW at Ms NTPC- Ramagundam STPS Stage-II 3x500MW
Arranging of Storage and Erection all risks policy for Renovation of Governing system of Turbine driven Boiler feed pump TDBFP for 3 units i.e. for 6 TDBFPs as per SOW at Ms NTPC Ramagundam STPS Stage II 3x500MW
Generator Stator replacement works as per SOW at NALCO Damanjodi TG-3 of 18.5 MW