Loading…
Loading…
91 results • Recent activity
Additional works of Emergency rectification Replacement of Failed Exciter and assistance during Vibration analysis and trim balancing as per SOW at Unit-2 NTECL Vallur 500MW
Capital Overhaul of HPT, IPT, LPT, Generator and its auxiliaries and other works as per SOW at Unit-2 KPCL- Raichur TPS (210MW)
FABRICATION AND ERECTION OF PIPE FLUSHING LOOP WORKS AT UNIT-3 KKNPP KUDANKULAM
Medium overhaul of Unit 8 (120 MW) KN series Turbine and Unit 3 (120 MW) HMN Series Turbine and other general works as per SOW at NALCO CPP Angul
Overhauling of HP and LP turbines, generator, governing system and auxiliaries including assistance for LPT rotor shot peening and other works as per SOW at Unit-2 NPCIL-MAPS (235MWe)
Capital overhaul of HMN Turbines as per SOW at Unit-1 NALCO CPP Angul 120MW