Loading…
Loading…
162 results • Recent activity
CONDUCTING GAS DISTRIBUTION TEST OF ESP DURING OVERHAULING OF 210 MW, UNIT-6, PTPS, PANIPAT as per scope of work for file no. 6128
Overhauling works of close loop system for 210 MW, Unit-6 as per scope of work file no. 6135.
Condenser Tube Cleaning remote controlled mechanized High Pressure Hydrojet Method upto 1000 Bar for 210 MW, Unit-6 PTPS, Panipat during its overhauling as per scope of work file no. 6098
For supply of Fabric compensator for 250MW, PTPS, Panipat
Thermal and Spray Insulation works pertaining to TG and Boiler for 210 MW Unit-6, PTPS Panipat as per scope of work of e-NIT No. MP-6100/Insulation/2024
In Situ repairing of main steam stop valve seat and wedge of 210 MW, Unit-6, PTPS, Panipat during overhauling