Loading
Loading…
Loading…
162 results • Recent activity
Radiography of HP Joints of Boiler Tubes of 210 MW, Unit-6, PTPS, Panipat
In Situ Seat Cutting of Safety Valves installed at Boiler etc of 210 MW, Unit-6, PTPS, Panipat as per scope of work file no. 6114
In-Situ Erosion Resistant Coating (TAFFA) of Boiler Tubes of 210 MW, Unit-6, PTPS, Panipat during its overhauling as per scope of work file no. 6117
Coal Mill Mechanical works of 210 MW, Unit-6, PTPS Panipat as per scope of work file no. 6168
Services required for conducting fibroscopy test of various headers of boilers overhauling of 210 MW, UNIT-6, PTPS, Panipat as per scope of work file no. 6130
Sludge Pump of capacity 150 to 160 M3 per hour