Loading…
Loading…
32 results • Recent activity
Providing, laying, jointing, testing and commissioning of 63 & 75 mm dia HDPE PE-100, PN-6, 2500.00 mtr.& 65 mm dia G.I. pipe 192.00 mtr., & Providing of electro chlorination & Construction of room & Providing connection in house hold and public instiutions-110nos with valve specials and all fitting i/c all allied civil works complete with in 06 Months and trial run operation, maintenance for 06 Months. at village- TOYNAR, Block-Bijapur, District - Bijapur. under Jal Jeevan Mission – Single village Scheme (2nd call ) Risk & cost आमंत्रित निविदा अधूरे कार्य एवं पुराने दर ( PHE SOR 01.06.2020 )आधारित है
Construction of E/M Circle Office Building for Public Health Engineering E/M CircleRaipur, District Raipur
Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia to 110 mm dia 6 kg/cm2 UPVC Pipe Line & 80 mm dia to 100 mm G.I. Pipe Line with suitable joints, valves specials and all fittings including all allied civil works and construction off 64 nos FHTC and trail run operation & maintenance for three months under Pipe Line Shifitting due to Bodtra-Pathrra-Ramhepur-Dindouri Road widening work Piped Water Supply Scheme at village – Bodtra, Block – Lormi, District – Mungeli (C.G.).
Design, Drawing, Construction, Testing, Commissioning of Floating Pontoon of size 5X3 mtr at JHUMKA Dam, Raw Water Electric Sub station100 KVA/11/0.415 KV with all required Work,Raw water HSCF pump sets 2 no of 10HPhaving discharge - 97656 LPH and against 20.0m head at Floating pontoon station site, 2.0 MLD conventional Type Water Treatment Plant, Clear water centrifugal pump set 03 Nos of 30HP having discharge 93750 LPH against 101m head, Clear Water Electric Sub station 100 KVA/11/0.415KV with all required Work at WTP site, 120 KL capacity 30m staging MBR-1 no at village salka,100 KL capacity 16m staging MBR-2 no at village salka, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 Pipe 250 mm Dia- 200m and Clear water pumping main 150 mm Dia DI K-9 Pipe-3820 m,DI K-9 Pipe200mm dia-1210 m ,total Length-5030 m& Clear Water Gravity Mains DI K-7 pipe 300 mm dia L= 6128m.& O-PVC Pipe PN-16, 160mm dia – 5423m. 250 mm dia –7487m, 110mm dia – 31711 m. Total Length- 50749 m with all required valves &specials,as per attached key plan map, Providing and fixing Bulk flow meters, nala crossing and work include taking permission to PWD, WRD deptt. etc. Allied All civil works including Boundary wall around WTP campus. Work completion is 12 months including rainy season Integrationof all component, comprises of three month testing & 09 month trial run of entire scheme (with defect liability period of one year). (On Risk and cost basis)GROUP WATER SUPPLY SCHEME NARKELI BLOCK- BAIKUNTHPUR DISTRICT –KOREA
Design, Drawing, Construction, Testing, Commissioning of Intake well 6 m dia height 26.70 m with 3 no rose piece, A 350mm dia D.I. Connecting Pipe ahead of Intake well 200 m Long , Raw water pumps and motors 70298lph & 60m head -3 no, Raw Water Electric Sub station 100 KVA/33/0.415 KV with all required Work, 3 MLD conventional Type Water Treatment Plant,Clear water centrifugal pumps and motors 67594 lph &105m head-3 no & 12916 lph & 40m head -2 no, Clear Water Electric Sub station 160 KVA/33/0.415 KV with all required Work, 650 KL capacity 25 staging MBR. RCC Clear Water Sump Capacity 20 KL, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 1960 m And Clear water pumping main 100 mm Dia DI K-9 Length 1276 m & 250 mm Dia 3810 m Total Length 5086 m & Clear Water Gravity Mains pipe DI K-7 350mm dia – 966m., DI K-7 300mm dia – 5611m., & O-pvc Pipe PN-16 250mm-3595m ,160mm dia – 7701 m., 110mm dia – 27796 m. Total Length- 45669 m with all required valves & specials, Providing and fixing Bulk flow meters & Entire Scheme upto Village OHTsAllied All civil works including Boundary wall around WTP campus, Quarters. After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Bases) Biharpur MVS
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 21m, Raw water V.T. pumps and motors 189490 lph & 31m head-2 no, For Raw& clear Water Electric Sub station 200 KVA/33/0.415 KV with all required Work, 4 MLD conventional Type Water Treatment Plant, 3 Nos-90955 lph-139m head centrifugal pumps clear water pumps&motors, Construction of RCC Over Head Service MBR-3 Numbers - 90KL Capacity/ 30m Staging, 105KL Capacity/25m Staging, 215KL Capacity/ 30m Staging, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 400 m And Clear water pumping main 250 mm Dia DI K-9 Length 5625m, 200 mm Dia DI K-9 Length 4093 m, 150 mm Dia DI K-9 Length 1610m Total Length 11328 m &Clear Water Gravity Mains pipe 110mm dia of pipe material OPVC – 57737m., 160mm dia of pipe material OPVC –5386 m. 250mm dia of pipe material OPVC – 442 m, Total length OPVC – 63565m, with all required valves & specials, Providing and fixing Bulk flow meters & Entire Scheme upto Village OHTsAllied All civil works including Boundary wall around WTP campus. After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Basis)