Loading…
Loading…
3,599 live1,816 closing this weekmost from PHE and Chief Engineer (Special Project) PHED, Jaipur
3,599 results • Latest
Engagement of Security Personnel (Unarmed) deployed by the security agency for guarding Government properties ... absolute safety and security of the materials at Jalghar, Gangarampur and Buniadpur Stack Yard under Balurghat Division, PHE Dte.
Operation and guarding of Pumping machinery and others for KURUMSAHA PWSS (P/H no - II) under Sainthia block
Engagement of Security Personnel (Unarmed) deployed by the security agency for guarding Government ... in an uninterrupted way ensuring absolute safety and security of the materials at Balurghat Division, PHE Dte. in the District of Dakshin Dinajpur.
Operation and guarding of Pumping machinery and others for KURUMSAHA PWSS (P/H no - I) under Sainthia block
Repairing of Handpump Set Labour Charges With Handpump Technician in Different Villages of Block BADNAGAR District Ujjain (01 Years)
Shifting of Rising Main 900 mm Dia DI (K9),E pipe line at SH-9 (Bankura-Durgapur Road) from KM 35.740 TO KM 38.54 of Bankura - I, II and Barjora Block W/S Scheme (BRGF Ph - I Project) under Bankura Sadar Sub - Division of Bankura Division, PHE Dte.
Engagement of Security Guard for Office of the Superintending Engineer, South 24-Pgns. W/S Circle, Office of the Executive Engineer, South 24-Pgns. W/S Division-I and for Office of the Executive Engineer, Mechanical Electrical Planning Wing, PHE Dte.
OHR connection with distribution main and other allied works in connection with Augmentation of Gabberia w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte.
2 nos. pump connection at PH No.-1 and 2 within Tapla Kusangra water supply scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte.
Emergent restoration of existing FHTC along with pipe line and other allied works in connection with retrofitting work at different places in connection with augmentation of Sandeshkhali w/s scheme, Sdk-II block under Hasnasbad Sub-Divn, P.H.E.Dte.
HDPE pipeline, 2 nos Horizontal Tubewell, 100 cum CWR, High lift pump house, Guard room, Boundary wall under Barjora water supply (left out mouza Z- II) of Barjora block, BRGF Phase-I project under Bankura Division, PHE Dte.
O and M for distribution of ZoneI and II of 5.00 MGD Surface Water Based Water Supply Scheme of Panagarh Industrial Park WS Scheme under Durgapur WS Division, PHE Dte 01 year.
Construction of boundary wall at HW site and 2nd TW Site with allied works and laying of additional laying distribution pipeline including construction of Toilets and sanitary arrangement at 2nd TW site of Chakur PWSS of Bagnan-I Block in Uluberia
Repairing Works of Existing R.C.C. Reservoir of capacity 800 CUM having staging height 20 mtr. at Head Work site of ZONE-27 piped water supply scheme within BARUIPUR Block under Baruipur Sub-Division of South 24-Pgns W/S Division-I, P.H.E. Dte.
Replacement of damaged steel rolled shutter for protecting of Electrical godown inside Boosting Station-II (Krisnamohan), installation of M.S. vent pipe on GLR top portions of Boosting Station-I (Begampur) and Boosting Station-II (Krishnamohan)
Construction of boundary wall, Approach Road at HW site 2nd TW Site with including shifting of DI at different places of Shibgachia PWSS of Amta-II Block in Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Sludge cleaning and disinfection of Mandirbazar GLR (1150 cum) under Mega Surface based Water Supply Scheme of Falta-Mathurapur District South 24-Pgns. under South 24 pgns W/S Division-I, PHE Dte. (For 01 Year) (02 (Two) times per year)
Different works for smooth running of RWS Barasat Sub Division Office and Water Testing Laboratories of North 24 Parganas under RWS Barasat Sub Division,PHE Dte.for 6 (six) months.
Repairing and renovation of Chikanpara Chemical and Bacteriological Laboratory at Chikanpara PWSS Head Work Site within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte.
Arear wages of operators for day to day valve operation for different PWSS Zones under Budge Budge-II Block under Surface Water Based Water Supply Scheme for Arsenic Affected Areas of South 24-Pgs. District. For the period 01.09.2026 to 30.09.2026
Road restoration along with additional alternative Laying of pipeline of Bangalpur PWSS of Bagnan-I Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Laying Distribution pipeline at Augmentation of Bamunhati Piped Water Supply Scheme (Part E LDS FHTC of Northern Part of Palera Village) along with Road Restoration in Uluberia-II Block under Uluberia Sub-Division of Howrah Division, P. H. E. Dte.
Construction of Approach Road Land Development at HW 2nd TW Site Haturia PWSS scheme under Bagnan-I Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Arear wages of operators for day to day valve operation for different PWSS Zones under Bishnupur-I Block under Surface Water Based Water Supply Scheme for Arsenic Affected Areas of South 24-Pgs. District. For the period 01.09.2026 to 30.09.2026
Engagement of Security Guards at Haral, BS-I (Begampur), BS-II (Krishnamohan) and Dakshin Barasat Stores of Baruipur Sub-Division under South 24-Parganas Water Supply Division-I, P.H.E. Dte. (for one year)
Engagement of Security Guards at Bibirhat Store and Amtala Store of South 24-Pgs. Water Supply Sub-Division-II under South 24-Parganas Water Supply Division-I, PHE Dte. (For one year).
Engagement of Security Guard at Administrative Building (Dongaria) of Sub Division-I under South 24-Pgns. W/S Division-I, PHE Dte. (For one year).
Annual Maintenance Contract (AMC) for Computers Printers UPS and other related peripherals installed in various water testing laboratories under Barasat Division P.H.E.Dte. for 6 (Six) months.
Construction of Approach Road Land Development at HW site, 2nd 4th TW Site Ajangachi PWSS scheme under Amta-II Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Construction of Bore near Markazi Jamia Masjid, Hanfia Nagbal, Kanganhall, Tengpora in District Anantnag).
Installation of Hand Pump with electric motor NHO Arif Gulzar Wani So Gull Mohd Wani R/o Khanpora Muniwara, in District Anantnag).
Construction of Bore near House of Fayaz Ahmad Mohant Mohalla Hard Tooru, in District Anantnag).
Construction of Bore near land of Mohd Jabar Ganie, Mohd Yousuf Ganie and Showkat Ahmad at Aadbal Telwani, in District Anantnag).
Construction of Bore Well at Karewa, Kanganhall near House of Mohd Shaban Bhat, Ali Mohd, Mohd Ashraf Bhat near Masjid Sharief, in District Anantnag).
Construction of Bore Well for the orchards at Karewa, Kanganhall Mohd Ramzan Bhat, Bashir Ahmad Bhat, Irshad Ahmad and Asif Ahmad, in District Anantnag).
Construction of Bore Well for the orchards at Taribagh, Kanganhall, Javed Ahmad,Aqib Ahmad, Bashir Ahmad and others in District Anantnag).
Construction of Bore Well for the orchards near Peerbagh, Kadpora Bala, Mushtaq Ahmad Bhat, Ikhlaq Bhat, Muneeb Bhat and others in District Anantnag).
Construction of Bore Well at Mohalla Sadak, Halqa Donipawa, in District Anantnag).
Sinking of 2 Nos. 400.00 mtr. Deep 100 X 50 mm. dia. Trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe and strainers for Bhanderkhali w/s scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte.
Emergency cleaning of pipe line at Hingalganj and Mamudpur mouza of Hingalganj w/s scheme (Z-I), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte.