Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
2,575 live1,748 closing this weekmost from PHE and Haryana Government
2,575 results • Latest
Providing, laying, jointing, testing and Distribution system of 65 mm dia G.I. pipe -50mtr and other fitting work etc .Installation of 02 HP Submersible power pump 03 nos & Providing G.I. steel Str., and PVC tank capacity 10000ltr.x02nos &Provision of electric connection for Three phase -02 nos & Providing connection in house hold and public instiutions-17nos with valve specials and all fitting i/c all allied civil works complete with in 06 Months, and trial run operation, maintenance for 03 Months. at village -PENKARAM, Block- USOOR, District - Bijapur. under Jal Jeevan Mission - Single Village Scheme.(6th call ) Risk & cost आमंत्रित निविदा अधूरे कार्य एवं पुराने दर ( PHE SOR 01.06.2020 ) आधारित है
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia to 140 mm dia UPVC class 6/10 kg/sqcm with suitable joints, 63 mm dia to 75 mm HDPE PE-100 , PN-6 Pipe &100 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Contral Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe, SS/ Nylonwirerope and connection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr, construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr, providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 09 months under SINGLE VILLAGE of Piped Water Supply Scheme under Jal Jeevan Mission For Village KARKABHAT, BLOCK-BALOD District –BALOD.
CONSTRUCTION OF 125MM 50MM 95M DEEP T/WELL - 10 NOS., 1 H.P. SUBMERSIBLE PUMP & MOTOR WITH ALL ACCESSORIES ? 15 NOS, 1 HP JET PUMPS WITH ALL ACCESSORIES - 4 NOS. AND INSTALLATION OF PVC WATER TANK WITH CONNECTION OF RAISING/DELIVERY PIPE -10 NOS. AT A PLACE OF STAYING POINTS OF PILGRIMS AND SECURITY FORCES ON THE OCCASION OF 360TH SHREE GURU GOVIND SINGHJI PRAKASH UTSAV ? 2026-27 UNDER P. H. DIVISION, PATNA EAST, PATNA FOR THE YEAR 2026-27.
Construction of High Yielding T/Well of size 150mm 100mm 125m deep- 1 No., 200 mm x 150 mm x 125 m deep ? 3 Nos. with T/Well Chamber- 4 Nos. and supply, installation, commissioning and testing of 5 H.P-1 No., 7.5 H.P-1 No., 10 HP-2 Nos. Submersible Pump & Motor with all accessories on the Occasion of 360th Shree Guru Govind Singhji Prakash Utsav ? 2026-27 under P. H. Division, Patna East, Patna for the Year 2026-27.
PROVIDING AND INSTALLATION OF PRE-FABRICATED TOILET, URINALS & BATHROOMS WITH MS FRAME, UPVC SHEETS/FRP SHEETS OR MOULDED SHEETS (MODULAR) AT A PLACE OF STAYING POINTS OF PILGRIMS AND SECURITY FORCES IN DIFFERENT PLACES INCLUDING UPKEEP AND MAINTENANCE ON THE OCCASION OF 360TH SHREE GURU GOVIND SINGHJI PRAKASH UTSAV ? 2026-27 UNDER P. H. DIVISION, PATNA EAST, PATNA FOR THE YEAR 2026-27.
PROVIDING AND INSTALLATION OF PRE-FABRICATED TOILET, URINALS & BATHROOMS WITH MS FRAME, UPVC SHEETS/FRP SHEETS OR MOULDED SHEETS (MODULAR) AT A PLACE OF STAYING POINTS OF PILGRIMS AND SECURITY FORCES IN DIFFERENT PLACES INCLUDING UPKEEP AND MAINTENANCE ON THE OCCASION OF 360TH SHREE GURU GOVIND SINGHJI PRAKASH UTSAV ? 2026-27 UNDER P. H. DIVISION, PATNA EAST, PATNA FOR THE YEAR 2026-27.
PROVIDING AND INSTALLATION OF PRE-FABRICATED TOILET, URINALS & BATHROOMS WITH MS FRAME, UPVC SHEETS/FRP SHEETS OR MOULDED SHEETS (MODULAR) AT A PLACE OF STAYING POINTS OF PILGRIMS AND SECURITY FORCES IN DIFFERENT PLACES INCLUDING UPKEEP AND MAINTENANCE ON THE OCCASION OF 360TH SHREE GURU GOVIND SINGHJI PRAKASH UTSAV ? 2026-27 UNDER P. H. DIVISION, PATNA EAST, PATNA FOR THE YEAR 2026-27.
Repairing of distribution system of pipe lines at Bhutijhari Water Supply Scheme under Islampur Sub-Division under Raiganj Division P.H.E. Dte.
Laying of Additional Pipeline for Pharabari Water Supply Scheme for installation of FHTC Work under Islampur Sub-Division P.H.E. Dte. under Raiganj Division, P.H.E Dte.
Restoration of damage pipe line during drain construction at Dholaibasti (Mouza-Daribhir ) from Panditpota -II GP and others anicillary works for FHTC at Amalijhari piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division,P.H.E Dt
Repairing and extension of Pipe line for Jaingaon along with PH-2 Rising main connection at Nengra within Jaingaon Water Supply Scheme under Islampur Sub-Division P.H.E. Dte. under Raiganj Division, Uttar Dinajpur.
Restoration of UPVC Pipeline and FHTC at DEONA Piped Water Supply Scheme under Islampur Sub-Division Under Raiganj Division PHE Dte.
Emergency Shifting of UPVC Pipe Line and Shifting Repairing of damaged Pipeline Existing FHTC of Bamair PWSS (Malon Mouza) due to erection of electric pole by WBSEDCL At Hemtabad Block under Raiganj Division P.H.E. Dte., Raiganj, Uttar Dinajpur.
Repairing and Restoration of UPVC Pipeline and FHTC at CHOPRABARI Piped Water Supply Scheme under Karandighi Block under Islampur Sub-Division under Raiganj Division, PHE Dte.
Restoration of Damaged UPVC Pipeline and Shifting Repairing of Existing FHTC of Dilwarpur PWSS (Dilwarpur Mouza) Due to widening of PMGSY Road (Chandail to Hat Kaliyaganj) by WBSRDA at Kaliyaganj Block under Raiganj Division P.H.E. Dte.,
Repairing of damaged pipe line at different location due to execution of PMGSY road near Sarkar Hati,Balaji,Gondahar and DPS School English along with crossing of NH-12 near Petrol Pump...of Paharajpur Water Supply Scheme
Repairing and Laying Distribution System Near Kahil Culvert under Majhihar PWSS at Kaliaganj Block under Raiganj Division, P.H.E. Dte., Uttar Dinajpur.
Repairing and Extension of pipe line at Dakshin Kundalpokhor Water Supply Scheme under Islampur Sub-Division P.H.E. Dte. under Raiganj Division, Uttar Dinajpur.
Restoration of damaged UPVC Pipeline due to Poll Erection by WBSEDCL and Repairing of Existing FHTC of Hemtabad Zone-1 PWSS at Hemtabad Block under Raiganj Division P.H.E. Dte., Raiganj, Uttar Dinajpur.
Restoration of damaged UPVC pipeline and shifting repairing of existing FHTC of Bamair pwss (Bishnupur Mouza) due to widening of PMGSY road (Arazi Kashimpur to Bahin) by WBSRDA at Hemtabad Block under Raiganj Division P.H.E. Dte., Raiganj, Uttar Di
Repairing and Restoration of UPVC Pipeline and FHTC at SIRIPUR Piped Water Supply Scheme under Goalpokher -I Block under Islampur Sub-Division Under Raiganj Division, PHE Dte.
Construction of Temporary 20 nos. elevated tank carrying structure at different places of Benuban and Chemaguri Point in connection with Ganga Sagar Mela 2027 under Canning Sub-Division of Alipore Division, PHE Dte.
Repairing and maintenance of 20 nos. Semi-Permanent Latrine with Sludge Tank at Benuban Point in connection with G.S. Mela - 2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte.
Sinking of 05 (five) nos. 100mm x 50mm dia. upto 350 mtr depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different point of Chemaguri and Benuban in connection with G.S. Mela 2027 under Alipore Diision, PHE Dte.
Emergent repairing work to ensure proper functioning of 250 Cum Capacity 20 Mtr. Staging Height RCC Over Head Reservoir in connection with operation and maintenance of Chhotparua Water Supply Scheme at Raiganj Block under Raiganj Division, P.H.E.
Deployment of qualified, trained manpower for round the clock monitoring and coordinating with entrusted agencies staff for proper cleaning, water supply, fire fighting arrangement etc. for 10 days at Chemaguri and Benuban in/C with G.S. Mela 2027.
Repairing damaged G.I. tank, painting of G.I. tank, painting block letters on the surface of G.I. tank / P.V.C. tank at Chemaguri and Benuban Point in connection with G.S. Mela - 2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte.
Fire Fighting arrangement and Fitting, fixing Fire Hydrant Lending Valve on existing pipe line, fixing bamboo post for demarcation for Fire Fighting including temporary special latrine and allied works for Chemaguri Point in/C with G.S Mela 2027.
Construction of temporary latrine at Chemaguri G.P. Ground and Benuban point in connection with Ganga Sagar Mela-2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri, Benuban Point, PART- H)
Ancillary work i.c.w. O and M of Poaltair PWSS, Hemtabad Block under Raiganj PHE Division, Uttar Dinajpur.
Construction of temporary 1 nos. wooden Tower (5.50 mtr. Height) at Benuban 1no. Zetty Ghat at Benuban Point in connection with Ganga Sagar Mela - 2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte.
Construction of temporary latrine and other allied works at Chemaguri and Benuban point in connection with Ganga Sagar Mela-2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri, Benuban Point, PART-J)
Construction of temporary latrine and other allied works at Chemaguri and Benuban point in connection with Ganga Sagar Mela-2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri and Benuban Point, PART - L)
Construction of temporary latrine and other allied works at Chemaguri and Benuban point in connection with Ganga Sagar Mela-2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri, Benuban Point, PART-K)
Construction of temporary latrine and other allied works at Chemaguri and Benuban point in connection with Ganga Sagar Mela-2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri, Benuban Point, PART-I)
Construction of temporary latrine at different locations and allied works related toilet block of Chemaguri and Benuban Point in connection with Ganga Sagar Mela- 2027 under Alipore Division, PHE Dte. (Chemaguri, Benuban Point, Part-F)
Construction of temporary water storage Vat/Reservoir with water supply arrangement to facilitate the fire fighting for 02 (two) number locations at Lot-8 Point in connection with G.S Mela 2027 under Alipore Division, PHE Dte.
Construction of temporary latrine at different locations and allied works related toilet block of Benuban Point and Chemaguri Point in/C with Ganga Sagar Mela-2027 under Canning Sub-Divn. of Alipore Divn., PHE Dte. (Benuban, Chemaguri point, Part-G)
Construction of temporary latrine at different locations and allied works related toilet block of Chemaguri and Benuban Point in connection with Ganga Sagar Mela-2027 under Alipore Division, PHE Dte. (Chemaguri, Benuban Point, Part-E)
Construction of temporary latrine at different locations and allied works related toilet block of Chemaguri and Benuban Point in connection with Ganga Sagar Mela-2027 under Alipore Division, PHE Dte. (Chemaguri and Benuban Point, Part-C)
Construction of temporary latrine at Chemaguri G.P. Ground and Benuban point in connection with Ganga Sagar Mela-2027 under Canning Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri and Benuban Point, PART - A)
Construction of temporary latrine at different locations and allied works related toilet block of Chemaguri and Benuban Point in connection with Ganga Sagar Mela-2027 under Alipore Division, PHE Dte. (Chemaguri, Benuban Point, Part-D)
Construction of temporary car parking zone and making temporary approach road towards latrine and drinking water tanks with allied works at different locations of Lot-8 point in connection with Ganga Sagar Mela-2027 under Alipore Division, PHE Dte.
Construction of temporary car parking along with approach roads towards different units i.e. rooms, stores, kitchen etc. in the premises of P.H.E.D camp office at PR-8 Ground of Lot-8 point in connection with Ganga Sagar Mela- 2027.
Construction of temporary structures Camp Office (8.40mX4.0m) including temporary special latrine at Lot-8 Point in connection with G.S. Mela-2027 under Diamond Harbour Sub-Division, of Alipore Division PHE Dte.
Deployment of qualified, trained manpower for round the clock monitoring and coordinating with the entrusted agencies staff for proper cleaning, water supply, firefighting arrangement etc. for 10 days at Lot-8 Point in/C with Gangasagar Mela-2027.
Sinking of 02 (two) no.100mm x 50mm dia. having 5 nos. Strainer upto 300 mtr (Average) depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different places of Dhopabari Seva Shivir i.c.w. Ganga Sagar Mela 2027.
Construction of Temporary 60 nos. elevated tank carrying structure at various pin point sites (Part B) in connection with G.S. Mela - 2027 under Diamond Harbour Sub-Division of Alipore Division, P.H.E. Dte.
Construction of one no. temporary structures for Mela Office (24.40mX7.60m) and one no. rest room (15.0mX6.0m) including temporary special latrine at Lot-8 Point in/C with G.S. Mela-2027 under Diamond Harbour Sub-Divn., of Alipore Division, PHE Dte.
Hire charges of Cess Pool Car for lifting and transportation of sludge and preparation of dumping ground for sludge disposal purpose at different places of Lot-8 Point and allied works including double brick flat soling in/C with G.S Mela-2027.