Loading…
Loading…
2,569 live1,338 closing this weekmost from PHE and Chief Engineer (Special Project) PHED, Jaipur
2,569 results • Latest
Replacement of existing non functional Chlorine machine at Karidhya Piped water supply scheme under Suri I Block in the Dist of Birbhum under Bolpur Mechanical Division PHE Dte
Operation and guarding of Pumping machinery and others for MONAI PWSS (P/H no - I) under Sainthia block
Operation and guarding of Pumping machinery and others for Belera PWSS (P/H no - I) under Mayureswar - II block.
Operation and guarding of Pumping machinery and others for DAKSHIN CHANDIPUR PWSS (P/H no - I) under Sainthia block
Operation and guarding of Pumping machinery and others for UTTAR BANGAON PWSS (P/H no - II) under Sainthia block
Operation and guarding of Pumping machinery and others for UTTAR BANGAON PWSS (P/H no - I) under Sainthia block
Withdrawing and Lowering of Submersible pumping machineries cable line rectification and other allied work for RBTW at Aligarh water supply scheme under Bolpur Mechanical Division PHE Dte
Operation and guarding of Pumping machinery and others for SAMSA PWSS (P/H no - I) under Sainthia block
Operation and guarding of Pumping machinery and others for PASCHIM NOAPARA PWSS (P/H no - II) under Sainthia block
Operation and guarding of Pumping machinery and others for PASCHIM NOAPARA PWSS (P/H no - I) under Sainthia block
Operation and guarding of Pumping machinery and others for NARAYANPUR PWSS (P/H no - II) under Sainthia block
Operation and guarding of Pumping machinery and others for NARAYANPUR PWSS (P/H no - I) under Sainthia block
Withdrawing lowering and surging of RBTW and other allied works at Rajnagar and others Piped water supply scheme under Rajnagar Block in the Dist of Birbhum under Bolpur Mechanical Division PHE Dte
Operation and guarding of Pumping machinery and others for NETURI PWSS (P/H no - II) under Sainthia block
Providing security personnel for round the clock Office guarding arrangement under Tamluk Division of Tamluk Division Office PHE Dte. 07 (Seven) Months.
Operation and guarding of Pumping machinery and others for NETURI PWSS (P/H no - I) under Sainthia block
Engagement of Security Personnel (Unarmed) deployed by the security agency for guarding Government properties ... absolute safety and security of the materials at Jalghar, Gangarampur and Buniadpur Stack Yard under Balurghat Division, PHE Dte.
Operation and guarding of Pumping machinery and others for KURUMSAHA PWSS (P/H no - II) under Sainthia block
Engagement of Security Personnel (Unarmed) deployed by the security agency for guarding Government ... in an uninterrupted way ensuring absolute safety and security of the materials at Balurghat Division, PHE Dte. in the District of Dakshin Dinajpur.
Operation and guarding of Pumping machinery and others for KURUMSAHA PWSS (P/H no - I) under Sainthia block
Repairing of Handpump Set Labour Charges With Handpump Technician in Different Villages of Block BADNAGAR District Ujjain (01 Years)
Shifting of Rising Main 900 mm Dia DI (K9),E pipe line at SH-9 (Bankura-Durgapur Road) from KM 35.740 TO KM 38.54 of Bankura - I, II and Barjora Block W/S Scheme (BRGF Ph - I Project) under Bankura Sadar Sub - Division of Bankura Division, PHE Dte.
Engagement of Security Guard for Office of the Superintending Engineer, South 24-Pgns. W/S Circle, Office of the Executive Engineer, South 24-Pgns. W/S Division-I and for Office of the Executive Engineer, Mechanical Electrical Planning Wing, PHE Dte.
OHR connection with distribution main and other allied works in connection with Augmentation of Gabberia w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte.
2 nos. pump connection at PH No.-1 and 2 within Tapla Kusangra water supply scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte.
Emergent restoration of existing FHTC along with pipe line and other allied works in connection with retrofitting work at different places in connection with augmentation of Sandeshkhali w/s scheme, Sdk-II block under Hasnasbad Sub-Divn, P.H.E.Dte.
HDPE pipeline, 2 nos Horizontal Tubewell, 100 cum CWR, High lift pump house, Guard room, Boundary wall under Barjora water supply (left out mouza Z- II) of Barjora block, BRGF Phase-I project under Bankura Division, PHE Dte.
O and M for distribution of ZoneI and II of 5.00 MGD Surface Water Based Water Supply Scheme of Panagarh Industrial Park WS Scheme under Durgapur WS Division, PHE Dte 01 year.
Construction of boundary wall at HW site and 2nd TW Site with allied works and laying of additional laying distribution pipeline including construction of Toilets and sanitary arrangement at 2nd TW site of Chakur PWSS of Bagnan-I Block in Uluberia
Repairing Works of Existing R.C.C. Reservoir of capacity 800 CUM having staging height 20 mtr. at Head Work site of ZONE-27 piped water supply scheme within BARUIPUR Block under Baruipur Sub-Division of South 24-Pgns W/S Division-I, P.H.E. Dte.
Replacement of damaged steel rolled shutter for protecting of Electrical godown inside Boosting Station-II (Krisnamohan), installation of M.S. vent pipe on GLR top portions of Boosting Station-I (Begampur) and Boosting Station-II (Krishnamohan)
Construction of boundary wall, Approach Road at HW site 2nd TW Site with including shifting of DI at different places of Shibgachia PWSS of Amta-II Block in Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Sludge cleaning and disinfection of Mandirbazar GLR (1150 cum) under Mega Surface based Water Supply Scheme of Falta-Mathurapur District South 24-Pgns. under South 24 pgns W/S Division-I, PHE Dte. (For 01 Year) (02 (Two) times per year)
Different works for smooth running of RWS Barasat Sub Division Office and Water Testing Laboratories of North 24 Parganas under RWS Barasat Sub Division,PHE Dte.for 6 (six) months.
Repairing and renovation of Chikanpara Chemical and Bacteriological Laboratory at Chikanpara PWSS Head Work Site within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte.
Arear wages of operators for day to day valve operation for different PWSS Zones under Budge Budge-II Block under Surface Water Based Water Supply Scheme for Arsenic Affected Areas of South 24-Pgs. District. For the period 01.09.2026 to 30.09.2026