Loading…
Loading…
19,164 results • Latest
Deployment of Laboratory Personnel for the District Laboratory for water quality Monitoring an Surveillance of all water sources by testing of the physico-chemical and bacteriological parameters and upload the data into PHED Dashboard including mtc..
WBPHED/EE/JD/e-NIT- 27/2024-25 (Sl.No.02)
Operation and maintenance Jaggeswardihi PWSS.
WBPHE/EE/JMD/NIeT 08_159 OF 2026-2027
WBPHE/EE/JMD/NIeT 08_40 OF 2026-2027
Day to day annual operation and maintenance of OHR, rising main, Distribution System, FHTC of Zone-I (Uttar Kashinagar PWSS), G.P.- Kashinagar, Block- Mathurapur-II under Raidighi Sub-Divn., of Alipore Division, PHE Dte. (for 365 Days) (2nd Call)
Operation and maintenance Ketugram(Zone -II) PWSS.
WBPHE/EE/JMD/NIeT 08_38 OF 2026-2027
WBPHE/EE/JMD/NIeT 08_35 OF 2026-2027
Day to day annual operation and maintenance of OHR, rising main, Distribution System FHTC of Zone-XIII (Chaplarkhop PWSS), G.P.-Dighirpar Bakultala, Block- Mathurapur-II under Raidighi Sub-Divn. of of Alipore Divn. PHE Dte. (for 365 days) (2nd Call)
Operation and maintenance Bakalsa PWSS.
WBPHE/EE/JMD/NIeT 08_34 OF 2026-2027
Upkeepment of various offices under Raiganj Division, PHED including Raiganj Sub-Division, Islampur Sub-division and Raiganj RWS Sub-Division Office. ( for a period of 01 year).
Operation and maintenance of distribution system including rising main and FHTC for Laxmi Janardanpur and Herambagopalpur Piped Water Supply Scheme of Patharpratima Block under Kakdwip Sub Divn. of Alipore Divn., PHE Dte. (for 365 Days) (2nd Call)
WBPHE/EE/JMD/NIeT 08_33 OF 2026-2027
Providing services for operation of Mukutmanipur Sub-District Water Testing Laboratory under Bankura Division, P.H.E. Dte. for 12 (Twelve) Months w.e.f. 01.09.2026 to 31.08.2027.
Operation and maintenance Palita PWSS.
Operation Maintenance of Distribution System, Rising main, Sluice Valves, including operation of sluice valves for Natungram PWSS of Burdwan-I Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
Please refer BOQ
Operation Maintenance of Distribution System, Rising main, Sluice Valves, including operation of sluice valves for Kandarsona PWSS of Burdwan-II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
10 NosDrilling Of 350X150 MM Dia 120 Mtr. Depth. G.P. Tube Well in Block ATER District Bhind
Operation and maintenance Ketugram(Zone-I) PWSS.
WBPHE/EE/JMD/NIeT 08_32 OF 2026-2027
Annual Maintenance contract for CCTV camera with supply of necessary peripherals in the office of the Burdwan Division and Barshul store, under Burdwan Division
Operation and maintenance Kalikapur PWSS.
Annual Maintenance Contract for 1 No. Canon Xerox Machine at the Circle Office, Purta Bhawan, 2nd floor, and 2 Nos. Canon Xerox Machine at the office of the Executive Engineer, Burdwan Division
10 NosDrilling Of 350X150 MM Dia 120 Mtr. Depth. G.P. Tube Well in Block BHIND District Bhind
Day to day operation and maintenance of distribution system and rising main pipeline (DI/CI/UPVC/HDPE), tubewell with collecting line, stand post, FHTC and operation of sluice valve of 07 Nos. Mini Piped Water Supply Scheme having households
Operation and maintenance Karui PWSS.
Supply of flow control devices for KHUNDKURI PWSS
Plantation and Maintenance of Garden at Borsul Rest House at Borsul
Operation Maintenance of Distribution System, Rising main, Sluice Valves, including operation of sluice valves for Sridharpur PWSS of Memari-II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
HANS Mid-back Chair With Fixed armrest without cushion and padding
Laying of new DI water supply lines having households 20
HANS Low-back Chair With Fixed armrest with Padding
Operation and maintenance Majhiary PWSS.
HANS Low-back Revolving Chair of Adjustable height with Wheels
WBPHE/EE/JMD/NIeT 08_30 OF 2026-2027
Operation Maintenance of Distribution System, Rising main, Sluice Valves, including operation of sluice valves for Bagila PWSS of Memari-I Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe CM and UPVC Deep Well Screen RMS for 5th TW site at Keotara Village of ABUJHATI PWSS
HANS Modular Table with Marine Ply Table Top and Wooden/Engineer Wood Understructure
Day to day washing cleaning of toilet, floor, door, windows kitchen appliances etc. including cleaning of all liner, routine maintenance of kitchen appliances including deployment of caretaker, cook, Asst. cook and Service cleaner man for SUSUNIA
HANS Silver Grey Colored Steel Shelving Cabinets
WBPHE/EE/JMD/NIeT 08_29 OF 2026-2027
Operation Maintenance of Distribution System, Rising main, Sluice Valves, including operation of sluice valves for Teandul PWSS of Raina-I Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
HANS High-back Revolving Chair of Adjustable height with Wheels
Operation Maintenance of Distribution System, Rising main, Sluice Valves, including operation of sluice valves for Sehera PWSS of Raina-I Block within Burdwan Sub- Division under Burdwan Division, PHE Dte Period for 1(one)year.
AALISHAN FURNITURES Computer table with Storage unit with MDF Board Table Top
Operation and maintenance Agradwip PWSS.
Construction of Rain Water Harvesting in 53 Aaganwadi Block BANDA SHAHGARH District Sagar