Loading…
Loading…
19,513 results • Latest
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Bhangabandh WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Water Supply Scheme for Augmentation of UWSS Baseri, Distt. Dholpur including 05 years OnM after 01 year Defect Liability period under Amrut 2.0
Operation and maintenance of internal electrification of different buildings at BS-I and BS-II and compound lighting under Arsenic Affected Area surface based water supply project in S.24pgs. District under South 24pgs. Mechanical Division, PHE Dte.
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Aulia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Water Supply Scheme for Augmentation of UWSS Weir, Distt. Bharatpur including 5 year OnM after 1 year Defect Liability period under Amrut 2.0
Operation and maintenance of 11KV/0.433 KV substation at GLR-8 Kultali of Mega Surface water based water supply scheme for Falta Mathurapur in the District of S-24 pgs under SMD PHE Dte
Operation, maintenance and guarding of gaseous chlorination plant at OHR Zone No- 1, 2 and 3 of Rajpur Sonarpur Non-KMDA rural areas water supply scheme under S.24pgs Mechanical Division, PHE Dte.
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Banspahari WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Realignment/Shifting of Sub Main Along Nandi Canal for WSS Kharman Ganesh (Under District Capex Budget, 2026-27 (UT Component).
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in BANSHJHARI MALLIKPUR water supply scheme
Water Supply Scheme for Augmentation of UWSS Bhusawar, Distt. Bharatpur including 5 year OnM after 1 year Defect Liability period under Amrut 2.0
Servicing and overhauling of different type Air Conditioner at BS-I and II under A.A.A. surface based water supply project in S.24pghs District under South 24pgs Mechanical Division, PHE Dte
O and M of Distribution System and Rising Main PipelineCI/DI/AC/UPVC including repairing of FHTC Connection for Barobelun w/s scheme of BHATAR Dev.Block within Durgapur Sub-Divn. under Burdwan Division, PHE Dte Period from 01.07.26 to 30.06.27
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Domsole WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Servicing and maintenance of Air Cooling arrangement of Mandakini and Muriganga Bunglow at Bakkhali Lot No-8 under South 24-Pgs Mechanical Division PHE. Dte
Providing, Laying ,Testing and Commissioning of Distribution Pipeline Network for Outgrowth Population of Village Chirhama and Nowathoo under WSS Chirhama Bongam (Under District Capex Budget, 2026-27 (UT Component).
Engagement of man power in connection with maintenance of rising main of pipe line on the daily basis, play events day and for 3 nos. IEP at Yuba Bharati Krirangan, Salt Lake, under Barasat Division PHE Dte. Period for 01.8.26 to 31.1.27
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Silda Pond Base WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of 11 Nos. Mini Pipe Water Supply Scheme (Out of 269 Nos. Mini PWSS) of Sankrail Block within Gopiballavpur Sub-Division, under Jhargra
Water Supply Scheme for Augmentation of UWSS Nadbai, Distt. Bharatpur including 5 year OnM after 1 year Defect Liability period under Amrut 2.0
Inspection and checking out of the defective 800 KW , 6.6 KV Motor Sl No. 2181457 / 01 , Make- CG of Clear water Pumping Station for Dakshin Roypur Water Supply Project 34 MGD in South 24 Pgs. District, under SMD, PHE Dte.
Construction of RCC Platform for Filling Point Near Tubewell at Sadoora under WSS Sadoora old (Under District Capex Budget, 2026-27 (UT Component).
Operation and maintenance of pumping machinery at GLR-2 DH-II of Falta Mathurapur of Mega Surface water based water supply scheme for Falta Mathurapur in the District of S 24 pgs under SMD PHE Dte
Operation Maintenance of distribution system under Belpahari WS scheme Dist. Zone for Sarisabasa, Bansketia other mouzas within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Water Supply Scheme for Augmentation of UWSS Roopwas, Distt. Bharatpur including 5 year OnM after 1 year Defect Liability period under Amrut 2.0
Operation and maintenance of pumping machinery at GLR-1 Falta of Falta Mathurapur of Mega Surface water based water supply scheme for Falta Mathurapur in the District of S 24 pgs under SMD PHE Dte
Operation Maintenance of distribution system under Belpahari WS scheme Dist. Zone for Kharpal, Silda other mouzas within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
O and M of Distribution System and Rising Main PipelineCI/DI/AC/UPVC including repairing of FHTC Connection for BONPAS KAMARPARA w/s scheme of BHATAR Dev.Block within Durgapur Sub-Divn.under Burdwan Division, PHE Dte Period from 01.07.26 to 30.06.27
Operation and maintenance of Pumping Machinery, 11KV/0.433 KV substation and Gaseous Chlorination at GLR-3 Magrahat-1 Block of Falta-Mathurapur Mega Surface water based water supply scheme in the District of S 24 pgs under SMD PHE Dte
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Khamar WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From For 12 Months
Supply, Delilvery and carrying of liquid chlorine gas of 900 Kg each capacity cylinder with testing of cylinder for GLR-4 Diamond Harbour-I under Falta Mathurapur Mega Surface based water supply project in South 24 Pgs District under SMD PHE Dte.
Carriage of packaged drinking water bottle and self container pouches from Dongaria to Kolkata and other different places for Government official programmes, Government offices etc under SMD , PHE Dte
O and M of Distribution System and Rising Main PipelineCI/DI/AC/UPVC including repairing of FHTC Connection for BALGONA w/s scheme of BHATAR Dev.Block within Durgapur Sub-Divn.under Burdwan Division, PHE Dte Period from 01.07.26 to 30.06.27
Operation Maintenance of IEP for Backwashing including washing, cleaning and disinfection of RCC OHR 100 CuM along with allied works of Jhargram District Hospital at Jhargram under Jhargram Sub-Division under Jhargram Division PHE Dte. For 12 Months
Supply, delivery and fitting fixing of display for magnetic flow meter and gearbox at Raw water Intake plant for Falta Mathurapur mega W/S Scheme under South 24 Pgs. Mechanical Division, PHE Dte.
Operation Maintenance of 1 no 50CumHr. IEP of Bengal Archery Academy at Jhargram for the period. For 12 Months
Engagement of competent service provider for comprehensive maintenance, technical support, hosting co-ordination and server administration services for the official website WBDWSIP.IN of West Bengal Drinking Water Sector Improvement Project PIU
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Junsola WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Round the clock Guarding arrangement at Nadia Divisional Store Premises under Nadia Division, PHE Dte.for 06 Months
O and M of Distribution System and Rising Main PipelineCI/DI/AC/UPVC including repairing of FHTC Connection for KASHIPUR w/s scheme of BHATAR Dev.Block within Durgapur Sub-Divn.under Burdwan Division, PHE Dte Period from 01.07.26 to 30.06.27
Water Supply pipes at different spots at Kulla-A, Kullan, Rayil and Sumbal under Area development Plan (DDC Grants 2026-27)
AS PER BOQ
Annual Rate Contract for Work of Renovation of Existing Sources under the jurisdiction of PHED Division Sikar, District SIKAR
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Baraberia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
O and M of Distribution System and Rising Main PipelineCI/DI/AC/UPVC including repairing of FHTC Connection for Putsuri w/s scheme of Manteswar Dev.Block within Durgapur Sub-Divn.under Burdwan Division, PHE Dte Period from 01.07.26 to 30.06.27
Drilling of 150/125/115 mm dia, 180 Mtr Deep Telescopic Tube well in different villages of Block Gandhwani District Dhar, Qty 13 Nos. Group- 6.6
AS PER BOQ
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Belaberia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Drilling of 150/125/115 mm dia, 180 Mtr Deep Telescopic Tube well in different villages of Block Gandhwani District Dhar, Qty 13 Nos. Group- 6.2
AS PER BOQ