Loading…
Loading…
19,536 results • Latest
BOQ
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Tarakeswar Block at Chandanagar Sub-Division under Hooghly Division, P.H.E. Dte. , Cluster-02
Retrofitting of Submersible pump for WTP Pump House no 12 Water Supply under Bolpur Mechanical Divn. PHE Dte.
Retrofitting of Submersible pump for WTP Pump House no 10 Water Supply under Bolpur Mechanical Divn. PHE Dte.
LEAKAGE AND BRUST REPAIRING OF PIPELINE AND WATER SUPPLY FROM OHSR TO VARIOUS VILLAGES AND DHANIES ORIGINATING FROM KALAYNIPURA PUMPING STATION ALL TYPE OF PREVETIVE AND BREAK DOWN MAINTENACNE OF PIPE LINES, FOR THE CLUSTER UNDER FCP ARAIN-KISHANGARH
as refer boq
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Tarakeswar Block at Chandanagar Sub-Division under Hooghly Division, P.H.E. Dte. , Cluster-01
NIT 23.3 Work of Construction and Commissioning of Tube well with pipeline in village Harchandpura Sub Division Amer, District Jaipur
Retrofitting of Submersible pump for WTP Pump House no 6 Water Supply under Bolpur Mechanical Divn. PHE Dte.
Retrofitting of Submersible pump for Zone-XII Water Supply under Bolpur Mechanical Divn. PHE Dte.
NIT 23.2 Work of construction of 02 nos. tubewells including pipe line work at RWSS Jorpura Block Jobner Under Sub Division Jhotwara, District Jaipur
Providing FHTC in connection with Jiakhuri Pipe Water Supply Scheme at Chopra Block of Uttar Dinajpur District under Raiganj Division.(New PWSS) (2nd Call)
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Tarakeswar Block at Chandanagar Sub-Division under Hooghly Division, P.H.E. Dte. , Cluster-09
Retrofitting of Submersible pump for Zone-VII PH 2 and Zone XIII Water Supply under Bolpur Mechanical Divn. PHE Dte.
Providing FHTC in connection with Paschim Ariagaon Pipe Water Supply Scheme at Chopra Block of Uttar Dinajpur District under Raiganj Division.(New PWSS) (2nd Call)
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Tarakeswar Block at Chandanagar Sub-Division under Hooghly Division, P.H.E. Dte. , Cluster-08
Annual O and Mtc of distribution syste, rising main, sluice valves including operation of sulice valves at KAYRAPUR(Z-I) PWSS under Durgapur W/S Division, PHE Dte (w.e.f. 01.07.2026 to 30.06.2027)
Annual O and Mtc of distribution syste, rising main, sluice valves including operation of sulice valves at DAREAPUR PWSS under Durgapur W/S Division, PHE Dte (w.e.f. 01.07.2026 to 30.06.2027)
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Tarakeswar Block at Chandanagar Sub-Division under Hooghly Division, P.H.E. Dte. , Cluster-07
Permanent Restoration of water supply schemes under SASCI of PHE Sub Division Bhalwal (Package-III)
Permanent Restoration of water supply schemes under SASCI of PHE Sub Division Akhnoor (Package-I)
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Tarakeswar Block at Chandanagar Sub-Division under Hooghly Division, P.H.E. Dte. , Cluster-06
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Tarakeswar Block at Chandanagar Sub-Division under Hooghly Division, P.H.E. Dte. , Cluster-05
Supply of Alumina Ferric for division Hanumangarh
Supply, delivery and installation of 20 KVA servo motor operated Copper wound line voltage stabilizer at PH-1, Zone-II of Left out area of Ganeshpur Mouza Water Supply Scheme under Kakdwip Block under SMD, PHE Dte.
As refer boq
Distribution valve operation at various Rural water scheme Jen section Goluwala under sub division Pilibangan
Permanent Restoration of works for damages occured during the month of August/September 2025 with respect to Sub-Division Bishnah under SASCI 2026-27
Distribution valve operation at various Rural water scheme Jen section rural under sub division Pilibangan
Distribution valve operation at various Rural water scheme Jen section urban under sub division Pilibangan
Permanent Restoration of water supply schemes under SASCI of PHE Sub Division Akhnoor (Package-II)
vehicle Diesel, non- A.C. 7 seater (Bolero, Scorpio, or equivalent etc.) under Jal Jeevan Mission with Driver on hire for PHE Sub Division shujalpur Division SHAJAPUR
PLEASE REFER TO BOQ
vehicle Diesel, non- A.C. 7 seater (Bolero, Scorpio, or equivalent etc.) under Jal Jeevan Mission with Driver on hire for PHE Sub Division Shajapur Division SHAJAPUR
Providing, fitting, installation, testing and HC Pumping Unit and other allied works at Dugg-Well Choi WSS Tridwan under SASCI
vehicle Diesel, non- A.C. 7 seater (Bolero, Scorpio, or equivalent etc.) under Jal Jeevan Mission with Driver on hire for PHE Division Shajapur Division SHAJAPUR
Providing, installation, testing and commissioning of Submersible pump sets and allied works at BW Amala, TW Bhagocha Chak existing and Chajartha in Hiranagar
NIT 23.1 Work of Construction of 01 Nos 150 mm dia Tube Well including pipe line Nr. Rawan Gate, Ward no 24 Chomu, Sub Division Chomu, District Jaipur
PITC of HCP 5000 GPH x 200m head and allied works at Ballad WSS Seswan under SASCI.
Construction of pavement in BPL Colony No.2 Construction of pavement in BPL Colony No.2
Drillilng of 25 No. 125/115 mm dia 90 mtr deep Tube well with installation handpump and construction of plate form in various block of Distt Shivpuri
Carraige / Handling charges of store items for the financial year 2026-27
Permanent restoration of damaged infrastructure of WSS Baryalta Shatriari under SASCI 2026
Permanent restoration of damaged infrastructure of WSS Sangyote - Pachote WSS Bashat and WSS Chenani Town under SASCI 2026
Construction of 250 cu.m. Capacity R.C.C. Elevated Reservosir, 20 mtrs. Staging height at head works site, laying Rising Main, Laying distribution pipe line with FHTC.....................Boundary Wall for KILARAM PWSS (Zone-I and II)
Providing Labour for maintenance work at various water supply schemes under district sub division IInd Jhunjhunu
Construction of 400 Cu.M capacity Elevated Reservoir 20m staging height allied with laying of distribution pipeline, Rising Mains, construction of Big dia rig bore tube wells by ODEX - 165 .....for Augmentation of UTTAR BAGDOGRA PWSS
Cleaning of Dugwells No. 01, 02, 03 and near Ashram Dugwell Sunderbani Town by way of removal of mud mulba/silt clearance and other allied works under WSS Sunderbani Town damaged due to flash flood under SASCI.
Providing Household Service Connections( HSCs) including one Year Defect Liability Period under the Jurisdiction of PHED, Dn., Nagaur (ARC)
Permanent restoration/Re-construction of water supply scheme Nallah damaged due to flash flood under SASCI.