Loading…
Loading…
19,195 results • Latest
Providing and installing 1 No. new tubewell
Engagement of security guards for guarding at the office of the Executive Engineer, Barasat Division, Assistant Engineer, Barasat Sadar Sub-Division, and RWS Barasat Sub-Division, P.H.E.Dte under Barasat Division, P.H.E. Dte. Period for one year
Guarding arrangement for the Divisional Store campus at Borsul under Burdwan Division, PHE. Dte.
Guarding arrangement for the Bunglow campus at Borsul under Burdwan Division, PHE. Dte.
Remuneration of Chemist/Bacteriologist and Laboratory Assistant for 04 (Four) nos. P.H.E Dte. Water Testing Laboratories (Kakdwip, Ramganga, Raidighi, Basanti Lab) under Alipore Division, PHE Dte. (For one year from the date of issuance of W/O).
Engagement of Guards for Guarding of Government Materials in the RWS Store at Madumurali, Taki Road,Barasat , North 24 Parganas under Barasat Division,PHE Dte. for 1 (one) year.
Guarding arrangement for the office of the Executive Engineer, Burdwan Division, PHE. Dte. PHE Complex, Nababhat, Fagupur, Purba Bardhaman- 713104
as refer boq
Hiring of Motor Cab and Maruti Omni for official use of the Assistant Engineer, Balurghat Sadar Sub-Division, P.H.E. Dte.
as refer boq
Day to Day Operation and Maintenance of distribution system and rising main for Keshiary PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Unbranded Tarpaulins Made from High Density Polyethylene (HDPE) Woven Fabrics (V3) Conforming to IS 7903 Type II - Having mass of 250 g/m², Min, Unbranded Tarpaulins Made from High Density Polyethylene (HDPE) Woven Fabrics (V3) Conforming to IS 7903 Type II — Having mass of 250 g/m², Min
Day to Day Operation and Maintenance of distribution system and rising main for Shanrpur PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Day to Day Operation and Maintenance of distribution system and rising main for Palashi PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Day to Day Operation and Maintenance of distribution system and rising main for Khasbazar PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Day to Day Operation and Maintenance of distribution system and rising main for Kanchangerya PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Remuneration of Chemist/ Bacteriologist and Laboratory Assistant for 05 (five) nos. P.H.E Dte. Water Testing Laboratories (Buita, Bhangor, Canning, Bakkhali, Diamond Harbour) under Alipore Divn., PHE Dte. (one year from the date of issuance of W/O).
Day to Day Operation and Maintenance of distribution system and rising main for Debra PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Hamidpur Drilling of 01 No Tubewell and installation of 01 No Pumping Machinery in village Hamidpur by DTH Rig Method
Day to Day Operation and Maintenance of distribution system and rising main for Balichak_Z2 PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Day to Day Operation and Maintenance of distribution system and rising main for Balichak_Z1 PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Horizontal Centrifugal Split Casing motor pump set At Gambhir Dam Ambodiya Distt. Ujjain
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Kotshila W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
WBPHE/EE/JMD/NIeT 08_27 OF 2026-2027
Day to Day Operation and Maintenance of distribution system and rising main for Sauri Kotbar PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Kotshila W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
AS PER TD
Day to Day Operation and Maintenance of distribution system and rising main for Sabra PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
JK Copier Plus 2.49 kilogram Ream of 500 Sheet 80 gsm A4 size Plain Copier Paper
Day to Day Operation and Maintenance of distribution system and rising main for Purulda PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Repair of Sump Tank near Filteration Plant Devak under District Capex Budget.
Construction of Operator Room, Chlorine cum Panel Room (12.00 mtr x 6.00 mtr) with toilet and water supply arrangement with all allied works at CWR Site according to departmental drawing for Babuijore Piped Water Supply Scheme
Trial Run of Joypur Water Supply Scheme (Except Electro Mechanical Component) of all distribution system, Sluice valve, FHTC etc under Purulia Division, P.H.E Dte (For the Period of 90 days)
Day to Day Operation and Maintenance of distribution system and rising main for Kurul PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Remuneration of Chemist, Bacteriologist and Lab Assistant of South 24 Parganas District Water Testing Laboratory situated at Bijoygarh State General Hospital Complex under Alipore Division, PHE Dte. (For one year from the date of issuance of W/O.)
Providing/Laying of G.I. pipe including improvement of existing distribution system WSS Keri Teryath under District Capex Budget.
Pipeline shifting and Construction Work with Machinery District Ujjain
Day to Day Operation and Maintenance of distribution system and rising main for Japhala PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Repair of 5000 Gln GSR Dhanti including improvement of existing distribution system WSS Dhanti under District Capex Budget.
Daily Operation mtc. of rising main all distribution system, opening closing of sluice valves with all allied works related to water supply under Aug. of Santuri W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (for
Supply delivery Installation and Commissioning of Bulk Electro Magnetic Flow meter, GPRS RTU and Control Valve for Bulk Consumer Water Supply Management at the residential Project ONE TEN at LR RS Dag no.-444/1477,446,447/1472 under Thakdari Mo
Sinking of 1 no. deep tubewell by D.R. Rig method at Pump House No. - 2 of Habra Municipal Zone -II water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte.
Supply and delivery and laying of different size cable and allied works at Newly Constructed Gaighata GLR under Habra-Gaighata surface water based W/S Scheme under EMD, PHE Dte.in 24Pgs(N).
Day to Day Operation and Maintenance of distribution system and rising main for Dhaneswarpur PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Day to day annual operation, repair and maintenance of CI/DI/AC/UPVC Rising Main and Distribution System for different zones at Banibadabelekhali and Moukhali W/S Scheme under Canning Sub Division of Alipore Division, PHE Dte. (for 365 Days)
Supply, delivery and installation of 700 mm single door check valve for SW4 (132 KW) P/M set and 350mm sluice valve (rising) for DW3 (45KW) P/M SET CDDS main pumping station, Bangur under Eastern Eastern Mechanical Division, PHE Dte.
Hire charges, fitting, fixing of 1 no.1000 ltr. Cap.PVC water tank for supply of drinking water in different village of different GPs to overcome the drought like situation for Laukhali site (Sarberia Agarhati GP), Sandeshkhali-I, Hasnabad Sub-Divis.
Day to Day Operation and Maintenance of distribution system and rising main for Bamanda PWSS under Kharagpur Sub Division of Midnapore Division PHE Dte.
Making Structural Steel base for mounting VBC and LT PDB panel at 1st floor of the substation building at Gaighata GLR under Habra-Gaighata surface water based W/S Scheme under EMD ,PHE Dte.in 24Pgs(N).