Loading…
Loading…
19,420 results • Latest
Augmentation of Garapota PWSS by providing dedicated pipeline for Shibchandrapur and Kutaknagar mouza under Nadia Arsenic Division-I,P.H.E. Dte as a part of Jal Jeevan Mission
Retrofitting Work for Providing FHTC at Bholadanga under Jal Jeevan Mission (JJM) at Ranaghat-II Block under Ground Water based PWSS for Sabdalpur Water Supply Scheme under Nadia Arsenic Division-I, PHE Dte.
Guarding of Govt. materials by engaging guards for 24 hours under Sarenga Water Supply Scheme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. w.e.f. 01.09.2026 to 31.08.2027 i.e. 01 (One) year.
OandM of Distribution System and Rising Main Pipeline CIDIUPVC and IEP of Different Ground Based PWSS for arsenic affected areas of Muragaccha Z-I and Muragaccha Z-II Joypur, ItaberiaGobindapurGarapotaBetnaadjoining mouzas atHanskhali Block etc
Construction of boundary wall, approach road at HW site, 2nd, 3rd 4th TW Site with Laying of pipeline at different places of Augmentation Paschim Khalna PWSS of Amta-II Block in uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Shifting of electro-mechanical components and other allied works from old pump room to newly constructed pump room at pumping station Kootha, Hiranagar
Repair of Pumping Machinery
Construction of pathway and allied works for WTP Chakdah in connection with Augmentation of Chakdah WTP under JJM within Chakdah Block under Nadia Arsenic Division-I, PHED
Providing, fitting and improvement of electro mechanical component at WSS Chenani including repair of 250 KVA electric transformer, rewinding of 100 HP motors, providing and fitting of new submersible pump set-2nos. replacement of copper and aluminiu
Construction of boundary wall at Kamardaha (Zone No. 37) of Bagnan-II block of surface-based water supply scheme of Shyampur I II, Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Alternative laying of distribution pipe line with repairing of FHTCs at different habitations within Paschim Gazipur PWSS under Amta-II Development Block in uluberia Sub Division, under Howrah Division, P.H.E. Dte.
Guarding arrangement of Govt. materials by engaging armed and un-armed guards for 24 hours at Khatra Stack Yard under Mukutmanipur - Khatra - Ranibandh Water Supply Scheme under Khatra Sub-Division of Bankura Division, P.H.E. Dte.w.e.f. 01.09.2026
Construction of boundary wall at Barunda H/W site (Zone 38) of Bagnan-II block of surface-based water supply scheme of Shyampur I II, Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Repair of Pumping Machinery of existing tubewells
Providing, installation, testing and commissioning of SPS 900GPH X 175mtr head and allied works at Bore Well Pongran in Billawar.
Guarding arrangement for Water Treatment Plant and Intake Site of Mukutmanipur Water Treatment plant by engaging Armed and Un- Armed Guards for 24 hours under Mukutmanipur - Khatra - Ranibandh Water Supply Scheme under Bankura Division,
Construction of Chlorine Room ( 5.5 m x 4.5 m) at Orphuli (Zone 34) at Bagnan II Block Of surface based water supply scheme of Shyampur I II , Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Construction of Entrance Gate Other Allied Works at at Camp office Uluberia under Uluberia I Block of Surface Based Water Supply Scheme of Shyampur I II, Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Construction of Chlorine Room ( 5.5 m x 4.5 m) at Deulti (Zone - 36) at Bagnan II Block Of surface based water supply scheme of Shyampur I II , Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Supplying and Spreading Stone Dust for Making of solid Platform for Stacking of DI Pipe at WTP Project Site of surface based water supply scheme of Shyampur I II, Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Construction of Chlorine Room (5.5 m x 4.5 m) at Benapur (Zone - 31) at Bagnan II Block Of surface-based water supply scheme of Shyampur I II, Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
ARC for Various Fabrication Job work under Rural Sub Division Ratangarh.
Construction of Chlorine Room ( 5.5 m x 4.5 m) at Ghoshpur Kalia (Zone 14) at Shyampur I Block Of surface based water supply scheme of Shyampur I II , Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
ARC for Repairing of starter and pannel under Rural Sub division Ratangarh
Comprehensive maintenance along with supervision and control of 50 Nos. Community Water Purification Plant installed in the arsenic affected areas of Gaighata Block of North 24 parganas under RWS Barasat Sub-Division of Barasat Division, P.H.E. DTE
Laying of 100mm i/d DI pipe line - 1500 mtrs. FHTC - 20 Nos.
Providing, fitting, testing and Commissioning of Fully Automatic Star Delta (FASD) Starter at Water Supply Scheme Watipora
Comprehensive maintenance along with supervision and control of 36 Nos. Community Water Purification Plant installation in the arsenic affected areas of various Blocks of North 24 parganas under RWS Barasat Sub-Division of Barasat Division, P.H.E.DTE
Operation and Maintenance of Magurati Srirampur W-S Scheme at Baduria Block.
E/M works
E/M works
Electro mechanical works
Supply, Installation, Testing and Commissioning of electro-mechanical works required at water supply scheme AIIMS Awantipora (Well No. 02 and Well No. 03)
Electro mechanical works
Electro mechanical works
Electro mechanical works
Installation of Handpump and Construction of Platform, Drain, Soakage pit and Washing platform work of 50 Nos. for Different Villages in District Gwalior and Bhind.
Operation and Maintenance of Krishnapara W-S Scheme at Hasnabad Block Dist-North 24 Pgs.
Electro mechanical works
Balance Work for revamping upgradation of the hydraulic parameters at distribution network towards Chttosali more in reference to Hijuli and Joypur water supply scheme under Nadia Arsenic Division-I,PHED as a part of Jal Jeevan Mission.
Carrying out the resistivity survey (100 Nos) for locating the proper spot with three soundings for drilling of tube well within the selected habitation, including submission of report in the desired format along with registrivity readings in village
Electro mechanical works
Operation and Maintenance of Hudaraite and Adjoining Mouzas under Rajarhat Block Dist-North 24 Pgs.
Carrying out the resistivity survey (50 Nos) for locating the proper spot with three soundings for drilling of tube well within the selected habitation, including submission of report in the desired format along with registrivity readings in villages
Electro mechanical works
Regular upkeep, upgradation management of Analytical Dashboard of the State related to WQMSP under Jal Jeevan Mission for 12 months
Daily Operation maintenance of Rising main all distribution system, sluice valve, and pump operation maintenance with allied works at S.D. Hospital Campus under Raghunathpur Sub-Division, PHE Dte. (w.e.f. 01-09-2026 to 31-08-2027)
Electro mechanical works
DNIT for Replacement of 1100mm i/d RCC damaged Sewer line at Mini bypass road to Kelnia Road (Balance Work).
Repairing of Damaged Road due to Laying of Pipeline and FHTC Works at Jalamadul Mouza of Bhagabatipur Zone 1 W/S Scheme under Serampore Sub-Division of Hooghly Division P.H.E.Dte.