Loading…
Loading…
Found 41 active tenders
41 results • Latest
Interior works of VC Residence at National Law University, Amingaon, Guwahati-31
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
DPR preparation for proposed office building of taxes at office of the Superintendent of Taxes, North Lakhimpur unit
DPR preparation for construction of one Indoor Stadium at Goalipar Sepaktakraw Ground, Hailakandi
DPR preparation for proposed office building at office of the Assistant Commissioner of Taxes, Dibrugarh
Construction of 100 Secondary Schools in 35 Districts of Assam under RIDF-XXXI (2025-26) for Azarbari HS School under Morigaon DTBD Package 29
Planning, Designing, and Construction of G+1 RCC framed structure building OF , “Construction of 100 Secondary Schools in 35 Districts of Assam under RIDF-XXXI (2025-26) for Azarbari HS School under MorigaonDTBD Package 29" with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Construction of 100 Secondary School in 35 Districts of Assam under RDIF-XXXI (2025-26) for Boginadi HS School, Dist North Lakhimpur DTBD package no 22
Planning, Designing, and Construction of G+1 RCC framed structure building OF , “Construction of New School Building of 100 Secondary School in 35 Districts of Assam under RDIF-XXXI (2025-26) for Boginadi HS School, Dist North Lakhimpur DTBD " with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.