Loading…
Loading…
10,013 results • Latest
Construction of a new boundary wall for the Pandwala Dak Bungalow in Jhansi district
Construction of a new boundary wall for the Ghughua Dak Bungalow in Jhansi district
New Construction of Sadiya Mughalpura to Bankati Pandri Road (VR)
Construction of the missing link of the approach road from Basariyas hamlet Kabutaran Dera to Composite Vidyalaya Basariya including maintenance costs for 5 years
Construction work of box culvert of 3 X 5 X3 meter span in place of the previously constructed damaged minor bridge on Somal Tal at Km-3 of Bhathi Buzurg road via Tola Ghurchhapra of Bhathi Buzurg from Pandey Rai Pitch Road in Kushinagar district
Construction of a 3 X 5 X 4 meter span RCC box culvert in place of the damaged culvert located on Doranchi drain on Pakdi Bazar Tola link road in Kushinagar district
Work of box culvert of 3 X 4 X 5.50 meter span in place of the previously constructed damaged minor bridge on Baitiah Nala of Hasanganj Matiyar Tola link road at Km-2 of Kaptanganj Pakriyar road in Kushinagar district.
Construction of a 3 X 5 X 4.5 meter span box culvert in place of the previously constructed damaged minor bridge on Kauasar drain at Km 1 of Mehdiganj Naugawan road in Kushinagar district
Construction of a 3 X 5 X 4 meter span RCC box culvert in place of the damaged culvert located on Doranchi drain on Pakdi link road in Kushinagar district
Construction of a 6 X 5 X 5 meter span box culvert in place of the damaged culvert at Km 4 of Hata Pagra Ramnagar Sohsa Tekuatar road in Kushinagar district
Mainntenance work of Rest house, old Circuite house building, and other repairing work
Whitewashing and painting work in Residential buildings under the Bhander Sub-division
Whitewashing and painting work in Residential buildings under the Datia Sub-division.
Whitewashing and painting work in non-residential buildings under the Datia Sub-division
RMO E and M Services at District Court, Sector-10, Dwarka, New Delhi (SH- Pdg. Services of Computer Operator, MTS and Dak Messenger for Sub Division under JED-02).
Annual Maintenance of Chadachan-kannur-Siddapur to Jalageri-Babanagar-Tikota-kotyal-Dasyal-Nidoni-Babaleshwar-Karjol-Mulawad-Almati to NH-13 road SH-258 Km 5.30 to (Reserved only for SC)27.40 in Indi Subdivision of vijayapur district for the year 2026-27. (3054 SH Maintenance)
Improvement of Sindhanur Hemmadaga NH 30 Road from Km 198.300 to Km 200.200 in Saundatti Yellamma Constituency, Belagavi District. (From APMC Circle to Kanchalarkoppa Maruti Temple Cross)
Construction of a Bridge across the Malaprabha river in the middle of the road connecting Hallur village to Kitadala village in Savadatti Yellamma constituency, Belgavi district (near Hallur village) Under HoA 5054 KRDCL Bridge for the year 2025-26
Construction of the Compound wall of the Bhatkal Sub-Divisional Office of Bhatkal Taluk, Uttara Kannada District, for the year 2026-27.
Annual Maintanace of Munavalli-Kotamachagi SH-83 from km 8.30 to 9.80, 16.20 to 16.50, 17.07 to 17.79, 27.10 to 30.650, and 40.91 to 56.00 in Ramdurg Taluka for the year 2026-27.
Addition and Remodeling work for Cancer Block Maternity Block and Screening OPD at Satyawadi Raja Harish Chandra Hospital Narela for Delhi Govt SH Supply and replacement of 08 Nos Lifts in existing Hospital Building
P.C. work on Palsari-Bamiyala motor road (length 2.14 Km). Under Annual repair (renewal) Year 2026-27.
CONSTRUCTION OF BRIDGE ACROSS NETHRAVATHI RIVER FOR CONNECTING KOTEPURA TO BOLAR (ON MANGALURU-CHERVATHUR-KARAVALI MDR)IN MANGALURU,DAKSHINA KANNADA DISTRICT, (DESIGN, CONSTRUCTION & MAINTANANCE OF BRIDGE WORK ON TURNKEY BASIS )
New Construction of Bankati-Pandri road To Bankati-Mahof Tak Link Road via Bithaura Khurd (VR)
New Construction of Madhopur Road to Mohanpur via Kaim Link Road (VR)
Construction work of Takori to Chhapra road including maintenance costs for 5 years
New Construction of Kargaina to Dinarpur Road (VR)
Construction from Sijara Tai House to Rajwara Primary School in Sijara including maintenance costs for 5 years
New Construction work from KM 278 of NH-74 to the Durga Devi Sthal located at Gaibaujh village (VR)
Construction of a new road from the Mau-Lahchura route to Raura Phoolpura Station and the cremation ground.
New Construction of Kesarpur to Balliya (VR)
Construction of the road from Unnao Gate Crossing towards Jhansi-Kanpur Highway via Anjani Mata Temple including maintenance costs for 5 years
New Construction work of Udaykaranpur to the remaining section of Teramil Nakar Road (VR)
Construction of a new connecting road from Pohra to Aari including maintenance costs for 5 years
New Construction work of Colony No. 8 to Colony No. 9 (VR)
Construction of road drain and culvert from Chhote Chira Suraj Bhans house to Government School Bhattagaon via Badi Mata Temple in Ward No 1 Khirakpatti including maintenance costs for 5 years
Construction of a road in Bhagwantpura extending from the cremation ground passing the farmhouse and leading towards the Babedi River up to the Madhya Pradesh border including maintenance costs for 5 years
Construction of a new road from the area next to the diamond factory in Baragaon Block to the Baratha-Lidhaurra connecting road including maintenance costs for 5 years
Special Repair of Ramgarh to Rampur link road.
Reconstruction work of the Birahni link road via Majhola-Bishti road.
Special Repair of Sandana to Bartal road
Reconstruction of Damage Minor Bridge on Akrabad Shahgarh road to Karehla to Dabha Road Via Dabhi
Reconstruction work of Lalpuriya Sahib Singh link road (VR)
Reconstruction work of Dhankuna-Majhola road to Dhankuna Gram. Link Toad (VR)
Reconstruction work of Katmata-Katmati connecting road (Part-I) from Badhepura-Hararyapur road (VR)
Reconstruction work of the Kataiya-Pandri link road from Majhola-Sitarganj road (VR)
Special Repair of Machhrehta Jalalpur road to Behda Khalsa link road
Reconstruction work of Tah Farm-Uttarakhand Border connecting road via Majhola-Diyunidam Road (VR).
Reconstruction work of Suswar Dalelganj to Degree Gautiya Connecting road (VR).
Reconstruction Work of the Damage Culvert Over the Rain Water Drain at Km-2 of Kheda Buzurg Link Road From Sadhu Ashram Kasimpur Road