Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹7.2 L
Closing Date
29 Sept 2026, 12:00 pm6d left
Superintending Engineer
Superintending Engineer, Badaun/Pilibhit Circle, P
New Construction of Kesarpur to Balliya (VR)
2026_CEBLY_1187934_3
5957/76C(A)(ET)-08/2026-27 Date 25.08.2026
Open Tender
Civil Works - Roads
Fixed-rate
180 days
Pilibhit
New Construction of Kesarpur to Balliya (VR)
4 documents required · 4 mandatory
₹2,714
₹7.2 L
Yes
Bareilly
19 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Road way in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification clause 302.3 | 144.9 | Cum | 193.3 | ₹28,009.17 |
| - | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 with lead upto 30 m as per technical specificaton clause 301.5 | 4,155.9 | Cum | 74.9 | ₹3,11,276.91 |
| - | Construction (E/W in cutting/Filling of Patri) of Subgrade and earthen shoulders with apporved material obtained from borrow pits with attl ifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 with a lead upto 1000 m as per Tecnical Specification Clause 303.1 | 1,365 | Cum | 64.2 | ₹87,633 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete work. | 251.16 | Cum | 3,342 | ₹8,39,376.72 |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100KN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete work.(WBM Grading-3) | 393.75 | Cum | 4,054.9 | ₹15,96,616.88 |
| - | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 787.5 | Cum | 7,728 | ₹60,85,800 |
| - | Excavation for Road way in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification clause 302.3 | 67.44 | Cum | 20.5 | ₹1,382.52 |
| - | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M10 (1:3:6) | 13.43 | Cum | 6,482.2 | ₹87,055.95 |
| - | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 16.11 | Cum | 970.7 | ₹15,637.98 |
| - | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1200&1203 | 62.91 | Cum | 6,114.8 | ₹3,84,682.07 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_2237347.xls
BOQ • 0.28 MB
T2.pdf
Tender Documents • 1.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .