Loading…
Loading…
99,452 results • Latest
Providing EI works for installation of CCTV cameras at the premises of the office of the Law Entrance Examination Board Agartala West Tripura
Supplying and stacking of crushed stone aggregate G-II.
C/O 1.00 mtr span culvert at RD. 3/650) (PDNA)
SH- Providing E.I. firefighting system. Fire alarm. Lift solar Water heater therein.
28-2 - Construction of Compound Wall Back side of S Building (Front side of Sahyadri Hospital) at Government Residential Quarters Yerawada Pune 6. (42160736 Housing DPDC)
Development of PWD road from NH208 to Sarat Chandra School via Packs bazar L 0.90 km from Ch. 0.00 Km to Ch.0.450 Km under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM II and III, Recarpeting Seal Coat surface drain pucca drain
Providing and applying painting work.
EOR of Food and Supply office Circle 55 Trilokpuri situated at DDA Shopping Complex 2nd floor Mayur Vihar Phase I Delhi 110091 SH Repair and renovation of office complex
PROVISION OF ADDITIONAL POWER PLUGS, POWER MAINS AND I/O PORT ARRANGEMENTS TO THE PRE FABRICATED WORKSHOP BUILDING FOR CENTRES OF EXCELLENCE IN GOVERNMENT POLYTECHNIC COLLEGE, PERUNDURAI
CONSTRUCTION OF MAIN GATE, AT TB HOSPITAL IDGAH HILLS CAMPUS BHOPAL
C/O R/Wall at RD. 1/245 to 1/257) (PDNA)
Providing structural and architectural consultancy for Construction of Laboratory Block of JKPCC at Udhampur
WIDENING AND STRENGTHENING WORK ON THE BAKULHA SANSAR TOLA ROAD (ODR) FROM CHAINAGE 1.00 TO 7.500 ODR (including 05 year maintenance cost)
Special repairs to leaky roof, flooring, doors, windows repairs, toilet repairs and painting in VAO office at Pallathur in Sivagangai District.
C/O Toe Wall of HP culvert at RD 2/150 and C/O U-shape drain at RD 2/130 to 2/230) (PDNA)
Construction of Compound Wall covering Front side right side L shape including drain for Police Line at Car NicobarPhase I
Macadamization from Rangeel Singh House to National Highway at Kanjli W.No.01 Battal (4th Call)
Construction of Dalog Chasni Madog road Km 0.000 to 3.300 HP09746
Construction Work of Atal Pragati Path Roads under Budget announcement 2026-27 in Distt. Jalore , Pakage No RJ-18-06/Atal Pragati Path /2026-27
DEPOSIT-SSK Wayanad- 2025-26 , STARS Project - Construction of Model Autism Complex at GLPS Cheengery in Sulthan Bathery BRC - Investigation work-Soil Investigation and Total Station Survey work - - Investigation Work
Providing Comprehensive Consultancy Services for Construction of Integrated Control and Command Centre at 33, Shamnath Marg Civil Lines Delhi including Master Plan Layout, Detailed Architectural Drawings, Structural Drawings, E and M Services--------
SH- Providing E.I. fire fighting system solar pole lights CCTV camera networking wi-fi system Lift therein.
Repair and Restoration of Building of Veterniary Dispensary Ghordi under UT CAPEX Budget for the year 2026-27
C/O R/Wall at RD. 3/100 to 3/112) (PDNA)
Provision of UPS and Electrical Installation in the Government Special Home at Chengalpattu
GENERAL-Civil Station Kozhikode- Rearrangements in the EI and Replacement of damaged Electrical fittings-in common area of C block-General Electrical Work
Construction of Ganapati Visarjan Shed and Providing and Fixing interlocking pavers in V.P. Dharbandora in Sanvordem Constituency (Under Tribal Sub Plan Scheme)
Construction of protection work of road near H.O of Parshotam Kumar S o Bodh Raj at Village Hartyan (Amba Lehar) Block Gordi
Construction of Sakav on Road Vafgaonn Maghade Vasti Boudhvasti Netakewasti Road Tal Khed, Dist Pune
GENERAL-Civil Station Kozhikode - Rearrangements in the EI and Replacement of damaged Electrical fittings -In the Common area of D1,E, E1 Blocks common area and collectorate record room varandha-General Electrical Work
Strengthening and Improvement of Nyahalod to Vishwanath VR-54 Km.0/00 to 3/00 Tal.Dist. Dhule
Special Repairs to Water Supply and Sanitary Pipe lines in Administrative Block Building in Government Sivagangai Medical College Hospital at Sivagangai in Sivagangai District.
Improvement to Bole Mondhale Fafore Amalner Marwad Nim Kapileshwar Road MDR 49 km 40/00 to 44/00 Tal. Amalner Dist. Jalgaon ( Sect Dhar to Marwad )
GENERAL-Bus Shelter at Mananchira (Muthalakkulam ), Kozhikode on old NH 66- Bus Shelter at Mananchira (Muthalakkulam )- Electrification-General Electrical Work
S.R./M.O.W. of N.R.B. under P.W.D. Sub Dn. Bhainsdehi.
Const of Bathroom near Mohd Ilyas Mir R/O Gomal Tangdar ward No.02
Construction Work of Atal Pragati Path Roads under Budget announcement 2026-27 in Distt. Jalore , Pakage No RJ-18-05/Atal Pragati Path /2026-27
DEPOSIT-Govt.College Madappally- Renovation of Principals room and toilet-- Electrification-General Electrical Work
Const of P wall with drain near Mohammad Akbar Mir at Hajinard ward No.07 Block Tangdar
Fulwari shapur road to Khanipurwa khama Marg par Navinikarnan ka karya.
Const of P wall Z Khull near house of Ab Majeed Ab Hamid and others ward No 5 at Hajinard block Tangdar
Construction of RCC side Drain (Gutter)from Mordewadi ZP School to Bagalmala Canal in Manchar Nagar Panchayat, Tal Ambegaon, Dist Pune
Improvement to Bole Mondhale Fafore Amalner Marwad Nim Kapileshwar Road MDR 49 Km 33/300 to 40/00 Tal. Amalner Dist. Jalgaon ( Sect Amalner to Dhar )
Repair work in toilet, bathroom kitchen, providing and fixing cuphbaord, white washiung/Distempering etc in Driver Qtrs Below type-VI DGS Residence under Parimahal section)(Excluding GST
GENERAL-Rest House Nadapuram- Renovation of compound wall,providing GI sheet roof on car porch and other repair works etc- Electrification-General Electrical Work
Providing Consultancy of Architectural and Structural design coming under the jurisdiction of PWD Rand B Division Thanamandi Upto 31 March 2026 Note Category A For projects costing above Rs 3 Cr
Composite Stage Contract (Civil, Sanitary and Plumbing Items) for Tara Niwas Guest House at Udhampur for the year 2026-27
SNTTM marg to Kadera Khama Marg par Navinikarnan ka karya.
Construction of RCC Drain for Channelisation of water of Health colony under Parimahal section)(Excluding GST
GENERAL-SP-Electrification at Chief Engineers Office Building. Project one, Cauvery Cell- Additional electrification and maintenance- HT-Electrical-Work