Loading…
Loading…
99,588 results • Latest
Special repair and refurbishing of damaged seats including supply of allied fixtures and materials of Chairs in the Galleries of Netaji Indoor Stadium, Kolkata during the period from March 2026 to February 2027.
Unbranded 80 gsm Light Green Pocket shape envelope of dimensions ( In mm) 250 x 325
RRD on Shimla Mandi via Tattapni road km. 145/00 to 181/400 (SH c/o of PCC R/wall at RD 151/200 to 151/215)
Repairing potholes of Paikpara- Sutia Road (Ch. From 4.00 kmp to 8.60 kmp) under Bongaon Sub- Division, PWD during the year 2022-23.
Special Repair of Sadullapur link road.
REPAIR OF JETTY AT HINDALE MORVE TAL DEVGAD DIST SINDHUDURG
Special Repairs of Girls Hostel at Govt. Tribal Ashram School Umarpata Tal. Sakri Dist. Dhule
Supplying and planting different plants at different Gardens inside Netaji Indoor Stadium and Kshudiram Anushilan Kendra during the period from March 2026 to February 2027
Renovation of Old Hospital at Dooru
Construction of BT road from Keeta to Sitodai km 0/0 to 6/0
Unbranded 80 gsm Light Yellow Pocket shape envelope of dimensions ( In mm) 240 x 330
Annual Operation and Maintenance of Submersible Pump Motor Sets installed at Barasat Administrative Building and District Judges Court under Barasat Division (PWD) in the district of North 24 Parganas w.e.f. 01.04.2021 to 31.03.2022 (2nd Call)
CONSTRUCTION OF RETAINING WALL AT CHENDVAN SANEKAR HOUSE TAL KUDAL DIST SINDHUDURG
Construction of new Link road from Baghwanpora link to Mughalgarden road
WHITE WASH COLOUR WASH AND PAINTING WORK OF GOVT RESIDENTIAL BUILDINGS OF HEAD QUARTER SECTION UNDER SUB DIVISION MANDSAUR DIV MANDSAUR
Periodical Tank cleaning and disinfecting of overhead and underground tanks BY MECHANICAL PROCESS at Netaji Indoor Stadium and Kshudiram Anushilan Kendra, Kolkata during the period from March 2026 to February 2027.
Renovation of EI work for Canteen area of DFWB ,Hooghly under Hooghly Electrical Sub-Division I, P.W.Dte.
Repairing of Basirhat -Hasnabad road from 8.00 kmp to 11.00 kmp under Barasat Division, PWD during the year 2020-21.
Repairs to Kasturba Womens Hospital At Shyam Nagar Nanded Tq and Dist Nanded (Balance Work)
Please refer to DNIeT
CONSTRUCTION OF RETAINING WALL AT CHENDVAN KHARICHA BANDH TO CHENDVAN MALEWADI TAL KUDAL DIST SINDHUDURG
Unbranded Plastic L File Folder for 21.5 cm x 34.5 cm (FS) size document
Stage Contract for maintenance of Roads and Bridges (P/L of RCC pipes/Clearance of drains, repairs/Renovation of drains, R/Walls, Slip clearance)(Part-II-Gulmarg).
Patch repair of ODR roads in Haidergarh Block
Repairing of damaged Electrical Items and supply of different Electrical Maintenance materials at 28-1 Gariahat Road RHE.
Construction of BT road from Jaisalmer to Baramsar Km 0/0 to 10/0
Sale with disposal including Cutting and Stump uprooting of 61 nos. different categories trees located on both side of Sayestanagar-Kaijuri-Chituri Road from 0.00 kmp to 17.70 km (except 11 to 11.50 km and 13 to 13.50 km) of Barasat division etc
Ruddhania Flexible Furnitures Floor Standing Rack (unit without door or closed compartment) with NA doors
DEPOSIT- Supply and installation of Fire Extinguishers in principal office attached to Medical College Campus Thiruvananthapuram-Electrical Fire Fighting Work
(SH- Routine Maintenance and Operation of various Electrical and Mechanical services including misc. EI Works in various Fire Stations).
Preparation of DPR For Constucting of verious Road Under PWD Sub Division Mandsaur Divison Mandsaur
Renovation of office chamber at Western Circle II on 1 st. floor of Purta Bhavan, Hooghly...SITC of AC machines.
CONSTRUCTION OF ANTI SEA EROSION BUND AT TAMBALDEG, TALUKA DEVGAD DISTRICT SINDHUDURG
CONSTRUCTION OF MANGAWAN BAIKUNTHPUR ROAD TO SADHU BABA MANDIR ( VILLAGE BUDHABA) APPROACH ROAD LENGTH 1.00 KM. UNDER PWD SUB DIVISION MANGANWA
Repair and renovation work of Male and Female surgical wards of the District Hospital Barasat, North 24 Parganas under Barasat Division, PWD
RICOH OEM Toner Cartridge Manufactured by Minosha Print Solutions Private Limited
Painting of various culverts including repairs to existing railings ( both Sub- Divisions)
Routine repairing works of doors furniture and floor of Debating Hall at Main Building of WBLA from March 2026 to February 2027
Fabteq High-back Revolving Chair of Adjustable height with Wheels, Fabteq High-back Revolving Chair of Adjustable height with Wheels
CONSTRUCTION OF ANTI SEA EROSION BUND AT TALASHIL, TALUKA MALVAN DISTRICT SINDHUDURG
Unbranded Stapler Compatible for Pin Size 10/4 of Throat Depth 63 mm
PREPARATION OF THE DPR VARIOUS PROPOSED ROADS UNDER SUB DIVISION NO. 02 SHIVPURI
Setting up of makeshift laboratory at ground and 1st floor of canteen within premises of Barasat DH in connection with Barasat MCH under Barasat Division, PWD
Replacement cum repairing of the different components/parts of existing but partially or completely defunct timer circuits used for the existing air conditioning system and peripheral lighting system along with reprogramming of faulty PLC
Unbranded 300 pages Dispatch register of Colour White
Construction work of Tyep-5 Residentional Building in Distt Bhadohi
Improvement Upgradation of Inner links of Arigoripora and Goripora by way of construction of Rwall Bwall Drain, GSB GII and laying of RCC spun pipes
Repairing and rewinding of horizontal and submersible pump motor including allied works (Phase-II).
CONSTRUCTION OF ANTI ERROSION BUND AT TARAMUMBARI TAL DEVGAD