Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -25.25% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.1 L+₹34,332.73 (12.2%)Admitted-Fee/PreQual/Technical/Finance | -16.10% | ₹3.1 L+₹34,332.73 (12.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-GST-3B not Up-Loaded |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
15 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Tangmarg
Executive Engineer RnB Division Tangmarg
Stage Contract for maintenance of Roads and Bridges (P/L of RCC pipes/Clearance of drains, repairs/Renovation of drains, R/Walls, Slip clearance)(Part-II-Gulmarg).
2026_PWDJK_323592_1
Fresh NIT No. 70/RnB/Tangmarg of 2026-27
Open Tender
Civil Works
Percentage
Tangmarg
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Tangmarg
₹8,000
16 Sept 2026
7 Sept 2026
16 Sept 2026
7 Sept 2026
15 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds | 1 | Cum | 592.9 | ₹592.9 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 1 | Cum | 187.3 | ₹187.3 |
| 3 | Earth work in excavation by manual means in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of
surplus excavated earth as directed:All kinds of soil :1m lead | 1 | Cum | 479.3 | ₹479.3 |
| 4 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upt 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50
metres:All kinds of soil : | 1 | Cum | 256.85 | ₹256.85 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | Cum | 218.4 | ₹218.4 |
| 6 | Supply stacking and laying of Good earth incl all carriages | 1 | Cum | 650 | ₹650 |
| 7 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -
All kinds of soil | 1 | Sqm | 24.12 | ₹24.12 |
| 8 | P/L, of dry stone soling 75 mm nominal size duly hand packed (Quarry) with ramming, dressing, watering and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete. | 1 | Cum | 1,100 | ₹1,100 |
| 9 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 1 | Cum | 1,725.2 | ₹1,725.2 |
| 10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. | 1 | Cum | 91.75 | ₹91.75 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1089649.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .