Loading…
Loading…
328 results • Latest
Construction of drain from main drain to primary school ward no.6 under (CDF) year 2025 26 P/H IJARA.Block NOORKHA
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil
Construction of protection wall near house of Rafiq bhat and others at ijara under(CDF) year 2025 26 P/H IJARA.Block NOORKHA
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil
Construction of foot path of masjid sherif to h/o Gh hassan bakshi bujithalan w.no 6 under CDF for year 2025-26 ,P/h Aehtishampora, BLOCK Noorkha
Earth work in excavation in foundation trenchs for drains, lining walls etc including dressing of sides and disposal of excavated soils as directed. Manually
Construction of drain with B path from h/o Adil habib khan ,Arif Ahmed sheikh ,Farooq ahmed khan,naseer ahmed mir ,nisar ahmed mir and masjid sharief Takwa khan mohalla w.no 3 under(CDF) year 2025 26 P/H Ahtishampora.Block NOORKHA
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil
Fencing of Graveyard by way of mesh fencing of concrete base near Higher Secondary School ward no 6 ijara under CDF for year 2025-26 ,P/H IJARA Block NOORKHAH
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil
Construction of B/path from Bridge to Astan Baba gafoor Sahb river side at ijara under(CDF) year 2025 26 P/H IJARA .Block NOORKHA
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil