Loading…
Loading…
99,577 results • Latest
Construction of various Atal Pragati Patch in District Jodhpur. Package No.RJ-21-01/AP/2026-27
Strengthening work of Thangaon Approach Road Total Length 0.95 Km. Under Sub Division Mandleshwar
RR damages to various road under Chirgaon Section Chirgaon Sub Division SH Hiring of JCB Excavator cum loader for removal of slipdebris clearance of drain and maintenance of road surface etc
Ro Delhahoopur Delhahoopur link road
Construction of Link Road from Masjid Sharief Rawakhpora to Peerbal upto Wudur at Chatrassoo Budroo.
Ro Margupur Srikrishanagar link road ke km 2 se left Sahodarpur link road
Earthwork and forest clearing work on damaged embankments due to heavy rains on various roads of SH MDR ODR roads category in Block BB Nagar in year 2026-27 in District Bulandshahr
Restoration of Damaged CLF and protection Wall along Poshwan Mohallah near Stadium Pahalgam.
Strengthening work of Selani Multhan Road Ch 4500 to 6400 Total Length 1.90 Km. Under Sub Division Mandleshwar
Construction of Compound wall in Government Higher Secondary School at Vellimedupettai in Tindivanam Taluk of Villupuram District
GENERAL Ladies Hostel Polytechnic Kadathuruthy Soil investigation Investigation Work
Construction of tile Path/lane from house of Mohd Shaban Bhat to Gh Qadir Najar.
Madha to Bhagwanpura link road in Km. 1(600)
RR Damage to Chirgaon Gushali road
C/o Boundary wall in Health Sub. Centre building Campus and interlocking paver Block in court yard at Health Sub. Centre Dhangota)
Dev. Of Vending zones near Gulshan Park W.No 02 Mc Aishmuqam MDC
Strengthening work of Rajur Singun Road at Ch 0 to 1500 Total Length 1.50 Km. Under Sub Division Mandleshwar
Construction of various Atal Pragati Patch in District Jodhpur. Package No.RJ-21-02/AP/2026-27
Manpower Outsourcing Services - Minimum wage
This estimate is prepared for the premonsoon activities in the various assets under PWD Buildings Section Thodupuzha
Strengthening work of Kadealiya Approach Road Ch. 300 to 1000 Total Length 0.70 Km. Under Sub Division Barwah
R/R Damage to Samoli Sainji Munchara road
DEPOSIT-Construction of Retaining wall at the side of ECHS Polyclinic in the Paremavu Colony Road-2025-2026-General Civil Work
The items included in this estimate are dismantling of tiles, providing cement concrete, providing water profing, laying floor tiles and wall tiles, painting, providing bathroom fittings etc.
Construction of Remaining part of Piya Niranjanpur to Veerpura link road
Strengthening work of Damkheda Nag Mandir C.C. Road and Minor Bridge Total Length 0.30 Km. Under Sub Division Khargone
Perumbilavu Nilambur road is a major SH in Malappuram District which connects NH544, NH 966 and NH66 in Malappuram District and is having a very high traffic volume. The condition of the road is not smoothly trafficable with potholes in the road.
Construction of a minor bridge in place of the damaged bridge in Chain 26.026 of Mehrauni Narahat road. Span (7x5)
DEPOSIT Restoration work Restoration work due to UG cable laying in Valanchery Angadippura Wandoor Vadapuram Nilambour road (B/w ch.4/300 and 6/395 LHS) by KSEB Electrical Section Edayour General Civil Work
DEPOSIT-Construction of Smart Village office for Clappana, Karunagappally under the scheme for Special Assistance to states for Capital Investment 2024-25-Smart Village Office Clappana-General Electrical Work
Replacement of Water Dispensing Unit at the 7th floor, SC Building of Honorable High Court, Calcutta.
Construction of Model Drug De-Addiction and Rehabilitation Centre at Kotla Barog District Sirmour H.P. SH Providing various Electrical Services therein.
GENERAL Govt Polytechnic Kaduthuruthi Urgent repair maintenance and partition works to Workshop building, Gymnasium and Canteen for providing temporary class rooms General Civil Work
Construction work of boundary wall guard room dormitory CC road and gate at chipitola Police Club residential complex in Agra Police Commissionerate
Electrical Installation, modification and renovation type Work along with reinstallation of AC machines and necessary arrangement of Water Purifier and Fire detection system for Setting up of MittiCafe Unit at the ground floor Near adjacent to E gate
Earth work,PCC work,RR and Solid Masonry,RCC work Plastering and Finishing work etc.
Checking and Testing of Transformers, LT gears, Air Circuit breakers and main panel in Sesqui-Centenary Building under HCESD-I.
SH C/o CC Pavement from RD 0/0 to 0/030, V-shape drain from RD 0/0 to 0/019) Deposit Work
Annual Comprehensive Maintenance contract CMC and Operation 24.7 for 33.11.440 KV HT Panel and Transformers existing at SLBSGMC and H Nerchowk in District Mandi HP
SINTRON Brown Heavy duty polypropylene Tape of length 100 meter
Repair of earthen shoulder, cutting of shurbs, unlined drain, removal slips and C/o U-shape drain etc. in Km. 10/500 to 20/00). Deposit under SDRF.
Repair and maintenance work of Inspection house Anoopshahr located in Year 2026-27 in District Bulandshahr.
Supply and delivery of Digital Thermal imaging camera for High Court Electrical Section-1, under Sub-Division.
SH Providing Fancy electrical accessories and yard lighting therein
Repair and Maintenance work of Transit Hostal in District Bulandshahr
Provision of installation Air conditioner in room No. 216, 224, 26, 18, 19,20, 229, 126 , 120, 313 of department of anatomy,Hostel office and Guest house (Shushtra hostel), Reading,TV and Dinning room sanjeevani hostel at MAMC, New Delhi.
Renewal work in the Kirtinagar Badiyargarh Dhaurangi Saurakhal Motor Road (MDR) by SDBC under annual Repair in the financial year 2026-27.
GENERAL-Footpath and Protection wall to Cattle Farm Bela under Animal Husbandry Department. -Providing foot path and Protection wall to Cattle Farm Bela in Badiaduka Gp Kasaragod District.-General Civil Work-1
Supply and delivery of different Electrical maintenance materials for Main and Annex Building of Honorable High Court at Kolkata.
DEPOSIT-Replacement of damaged Air conditioner in the office of Advocate General, Thiruvananthapuram-AC replacementElectrical AC Work