Loading…
Loading…
664 results • Latest
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution TF
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division PSPCL Nawanshahr
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under WEST Division Jalandhar
Outsourcing of Labour Part for the pilot project to rectify low lying PVC cables at road street crossings
Outsourcing of Labour Part for the pilot project to rectify low lying PVC cables at road street crossings
Work of reclamation of 1600MT spilled coal/biomass and desilting of drains as per scope of work in Coal Handling Plant of GGSSTP, Roopnagar
Work of Operation and Maintenance and General Cleanliness of PLC based Complete Ash Handling Plant including Decantation and 100MT weighbridge at GHTP Lehra Mohabbat
Excavator on hire basis for river intake sand removal works
Construction of 1 No Solar Bay for Ms Indian Securities Pvt Ltd, Mandi Gobindgarh and its allied works at 66 KV S S Sangrahoor under op. circle, Faridkot
Construction of Additional foundations for 1no. 66KV Additional Transformer bay and allied civil works like trenches, gravel spreading at 66KV s/s Patara (under op. circle Jalandhar) (TWL no. 119/NZ/2025-26/Annex-B)
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections,Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under Cantt Division Jalandhar
Protection Measure to Protect Internal Side Slopes of Unlined Canal Portion of UBDC Hydel Channel by Providing Stone Wire Crates on both banks at different locations
Outsourcing of Labour Part for Emergency restoration of services for replacement of HT LT underground cables of various sizes, cable joints and supplying of HDPE pipes with allied accessories for the year 2026 2027 under Division Aerocity
Supply, erection, testing, commissioning and maintenance of IoT-based data logger system and OCEMS data connectivity to CPCB/SPCB server in compliance with the following CPCB/SPCB regulatory guidelines
Annual Contracts for Mechanical Sampling of Rake Coal by Auger.
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HT Lines on Rail/PCC Poles Under DS Division Malout
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11 KV LT/HT Lines on Rail/PCC Poles, Distribution T/Fs, Augmentation/ Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Set for Various Works such as Releasing of T/We
Procurement of MS Nuts and Bolts under FS Group for the year 2025-26 for whole plant.
Procurement of Conveyor Belts for CHP of GHTP Lehra Mohabbat. Quantity as per NIT
To hire the 2 no vehicle Hydraulic bucket lift with Driver Cum Operator in three shifts I e 24 7 with working height 9 Mtr.through outsourcing for 6 months from 01 05 2026 to 31 10 2026 for official use of Sub division Saidpura Under DS Division
SPECIFICATION FOR REPAIR OF 11 / 0.433 KV DAMAGED ALUMINIUM WOUND DISTRIBUTION TRANSFORMERS (CONVENTIONAL TYPE) OF CAPACITY 63 KVA AGAINST TENDER ENQUIRY QW-340 PO-W Dated 18.02.2026
SPECIFICATION FOR REPAIR OF 11 / 0.433 KV DAMAGED ALUMINIUM WOUND DISTRIBUTION TRANSFORMERS (CONVENTIONAL TYPE) OF CAPACITY 100 KVA AGAINST TENDER ENQUIRY QW-341 / PO-W Dated 18.02.2026
Housekeeping and Annual Civil Maintenance of Technical Buildings Structures Arboriculture Roads and Paths etc of Stage II in Zone II at GHTP Lehra Mohabat.
Procurement of Idler Rollers for Conveyor System, Wagon Tiplers and Stacker-Re-claimers of CHP Stage-I and II, GHTP Lehra Mohabbat Quantity as per NIT
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KV LT HTLines
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCCPoles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Set for Various Works such as Releasing of T/Well Co
Repair/Reclamation of Upper Journal Housing and Lower Journal Housing of HP-803 Mills of Unit 5 and 6 at GGSSTP, Ropar.
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
Supply, Transportation and Application of RTV Silicone Rubber High Voltage Insulation Coating on 11KV Indoor Bus Bar and its Spouts/ Support Insulators for 11KV Switchgear and Cleaning/ Removal of Waste from the Equipment
Outsourcing of Labour for systematic beautification rectification safety compliance and system strengthening of low lying LT and associated 11 kV distribution network of DS Division City Centre Amritsar under DS City Circle Amritsar
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 meter poles and 9 mtr. , PVC cables area of Sub division Bariwala under DS Division Sri Muktsar Sahib under Ds Circle Sri Muktsar Sahib.
Design Manufacture Testing before dispatch Delivery of 52000 Nos. Male Female Contact Sets for 11KV 75 Amp GO Switches 99000 Nos. Male Female Contact Sets for 11 KV 400 Amp GO Switches as per PSPCL Specification no. QQ-2375.
COLLECTION AND PREPARATION OF COAL AND BIOMASS PELLETS, COLLECTION OF ASH, GAS, OIL, POLLUTION MONITORING SAMPLES AND OTHER MISCELLANEOUS WORKS OF D. M. PLANT AT GGSSTP, RUPNAGAR.
SPECIFICATION FOR REPAIR OF 11 / 0.433 KV DAMAGED ALUMINIUM WOUND DISTRIBUTION TRANSFORMERS (CONVENTIONAL TYPE) OF CAPACITY 25KVA AGAINST TENDER ENQUIRY QW-339 / PO-W Dated 18.02.2026
Design Manufacture Testing before dispatch Delivery of 6800 Nos. 1-Phase 11KV 75 Amp Single Throw, Single Break GO switches 12000 nos. 3-Phase 11KV 75 Amp Single Throw Single Break GO switches as per IS IEC 62271 and as per PSPCL Spec QQ-2369.
L.T. Fuse unit as per drawing attached and as per specifications
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KV LT HT Lines on Rail PCC Poles Distribution T Fs Augmentation Sagging of ACSR of HT LT Lines Cables laying Guarding Stay Set for Various Works Under DS Kartarpur Division PSPCL
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KV LT HT Lines on Rail PCC Poles Distribution T Fs Augmentation Sagging of ACSR of HT LT Lines Cables laying Guarding Stay Set for Various Works Under DS Sub Urban Division PSPCL
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KV LT HT Lines on Rail PCC Poles Distribution T Fs Augmentation Sagging of ACSR of HT LT Lines Cables laying Guarding Stay Set for Various Works such as Releasing of T Well Conn
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KV LT HT Lines on Rail PCC Poles Distribution T Fs Augmentation Sagging of ACSR of HT LT Lines Cables laying Guarding Stay Set for Various Works Under Sub urban Division Nakodar
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KV LT HT Lines on Rail PCC Poles Distribution T Fs Augmentation Sagging of ACSR of HT LT Lines Cables laying Guarding Stay Set for Various Works Under Division Nakodar Shahkot
Outsourcing work of ETC of new 66 KV S/S TDI sec-119, Mohali with 01 No. 20 MVA Power TF along with TF Bay and 02 No. line bays complete with all indoor and outdoor equipments on partial turnkey basis under Annx D under GCD, PTA under GCC, LDH
Outsourcing work of ETC of Additional 1 no. 20 MVA Power Transformers along with complete bay equipments on partial turnkey mode under Annexure D (Deposit work) under Grid Construction Division Patiala under GC Circle LDH
Reapplication of new/old Ceramic Pad Insulation for HPT/IPT turbine modules of 2x210 and 2x250MW, GHTP, Lehra Mohabat.
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HT Lines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Set for Various Works
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HT Lines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Set for Various Works
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables area of MALOUT Division in respect of S/D Arniwala.
MAINTENANCE OF SWITCHYARD AND TRANSFORMER YARD AREAS (22 ACRES APPROXIMATELY) AT 220Kv SUBSTATION, 66Kv SUBSTATION, GGSSTP, 2X850KW MICROHYDEL PROJECT AND TRANSFORMER YARD AREAS OF 4 X 210 MW UNITS, GGSSTP, ROOPNAGAR AS PER SCOPE OF WORK
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works under DS Division Maur
Outsourcing of Labour Part for Erection, Testing AND Commissioning of New 11KVLTHTLines on Rail/PCC Poles, Distribution TFs, Augmentation/Sagging of ACSR of HT LT Lines Cables laying, Guarding Stay Set for Various Works such as Releasing of T. Well