Loading…
Loading…
1,532 results • Latest
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING, AND CONSTRUCTION OF NEW LINE AND MISC. WORKS (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-CHAURI CHAURA, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
for EXECUTION OF WORK FOR INCREASING CAPACITY OF TRANSFORMER, INSTALLATION OF SECOND POINT DISTRIBUTION TRASFORMER (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-Chauri Chaura, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Local 24*7
work of Regrouping under EDD-Saidpur, Ghazipur In Business Plan 2026-27
work of Regrouping under EDD-Saidpur Ghazipur In Business Plan 2026-27
Work of strengthening and repaiir of lines under EDD-Saidpur, Ghazipur in Business Plan 2026-27
Roof treatment work of the Chief Engineer (Distribution) residence located at Hydel Colony Fataha Mirzapur
work of Regrouping under EDD-Zamania, Ghazipur In Business Plan 2026-27
Work of strengthening and repaiir of lines under EDD-Saidpur, Ghazipur in Business Plan 2026-27
work of Regrouping under EDD-Jangipur and Ghazipur nagar, Ghazipur In Business Plan 2026-27
work of strengthening of 11 KV and replacement of damage wire with AB cable and mid span Poles under EDD-Saidpur, Ghazipur In Business Plan 2026-27
work of Construction of 11 KV new line under EDD-Ghazipur Nagar, Ghazipur In Business Plan 2026-27
work of strengthening of 11 KV under EDD-Zamania, Ghazipur In Business Plan 2026-27
Work of strengthening of 11 KV line and replacement of worn out LT wire under EDD-Zamania, Ghazipur in Business Plan 2026-27
Work of strengthening of 11 KV line under EDD-Ghazipur Nagar, Ghazipur in Business Plan 2026-27
work of Regrouping under EDD-Ghazipur nagar, Ghazipur In Business Plan 2026-27
Construction of 11 KV LT line and installation of transformers of different capacities including construction of under Deposit Scheme Nivesh Mitra Portal Jhatpat Portal MP MLA Fund under Electricity Distribution Division Chunar Mirzapur 2025 26
BP 26-27 DT Augmentation works under EDD Chayal
Construction of new 33 kv line to connect 33 kv mishrain and 33 kv abholi line from Bhatevara Nahar to Bhikhampur
2 Increasing Capacity of 33 11 Ss Politechnic Basti From 1x5 MVA to 2x5 MVA and Increasing Capacity of 33 11 KV Ss Vikramjot Basti From 2x5 MVA to 5 plus 10 MVA
For Spliting of 11Kv Sigra Feeder from 33/11KV S/S Nagar Nigam by making of underground line under Business Plan 2018-19
Refer to Tender Description
Work of installing mid pole between HT and LT in long span under power substation Chhahi, Garthauli, Raunakalan, and Jalhupur Under the Business Plan Year 2026-27 of EE, EDD- Chiraigaon, Varanasi.
Work of replacing worn out wires on HT and LT under power substations Undi, Jalhupur, Garthauli and Raunakalan Under the Business Plan Year 2026-27 of Executive Engineer, EDD-Chiraigaon, Varanasi.
Protection of LT Lines and other miscellaneous works under the BP 2026-27 within the jurisdiction of EDD-Ist, Chandauli, at EDSD, Chandauli. (on Semi Turn-key basis)
Work for the installation of new 11/0.4 KV Distribution Transformers under the BP 2026-27 within the jurisdiction of the EDD-Ist, Chandauli (on Semi Turn-key basis).
Construction, Strenghtning and Crossing of 33 KV Underground Line Under EUDD - Bamrauli, Meyohall and Tagore Town, Prayagraj in the Head of BP 2026-27
REPLACEMENT OF DAMAGED/RUSTED LT/HT POLE, INSTALLATION OF 250 KVA ADDITIONAL, CAPACITY INCREASING OF DISTRIBUTION T/f 63-100 KVA, 100-250 KVA AND CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE AT DIFFERENT SUBSTATIONS UNDER EUDD-BAMRAULI
REPLACEMENT OF DAMAGED, LT ABC/LT NAKED WIRE LINE, EARTHING OF T/f, MISC. WORK IN SWITCH YARD, 250 KVA IInd Point, CAP. INC. OF DISTRIBUTION Tf 250 TO 400 KVA, CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE, AT DIFFERENT SITE UNDER EUDD-MAYOHALL
CAP. INCREASING OF 33/11 KV NEW PHAPHAMAU SUBSTATION, INSTALLATION OF 250 KVA IInd POINT, CAP. INCREASING OF T/F 63 TO 100 KVA AND 100 TO 250 KVA AND CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE AT DIFFERENT SUBSTATIONS UNDER EUDD-TAGORE TOWN
For the Shifting work of Existing 11 kv LT line and Transformer due to widening of Road from Nanda Nagar police chauki to Shamsher gate Distt. Gorakhpur
Construction of Temporary 33 KV Line from Naurangiya to Surajnagar SS Distt Kushinagar
Increasing Capacity of 33/11 KV S/S Khairabad, Bhiti, Chiraialot and Tajopur(UPSIDC)- Mau
Stationary Lead-Acid Cells and Batteries with Tubular Positive Plates Conforming To IS 1651 (Q3) (3 (3 ))
Construction of 33 kV Line from Bhatwaliya to Rampur Karkhana Distt Deoria
Increasing Capacity of 33/11 KV S/S Gothaon, Kanaila, Mubarakpur Town and Rasepur- Azamgarh
Work for shifting of line Gajeepur Vijayeepur Marg during Road Widening under Semi Turn Key Basis in EDD khaga, Fatehpur
Increasing Capacity of 33/11 KV S/S Gosai Ki Bazar, Mohammadpur, Tarwa and Thekma -Azamgarh
For Earthing of Power Transformer at 33/11KV Bhikharipur, Ranipur, DPH, Lohta S/S and Earthing of Different capacity of Distribution Transformers UEDD VII, Varanasi under Business Plan 2026-27
For Earthing of Control Pannel and Different capacity of Distribution Transformer at 33/11 KV Beniyabagh, Kashi Vidhyapeeth, Nagar Nigam, Chaukaghat S/S under UEDD II Varanasi under Business Plan 2026-27
For Guarding of 11 KV Line in the Area of 33/11 KV BENIYABAGH, Nagar Nigam and Vidhyapeeth under UEDD-II Varanasi under Business Plan 2026-27
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Local 24*7
Construction of New Sub station Kauwasar 2x5 MVA and 33 KV Kauwasar line and 11 KV 04 Nos. feeder from proposed SS Kauwasar Distt Kushinagar
Refer to Tender Description
Refer to Tender Description
Work of Construction/Strengthening of 33 kV Lines within the jurisdiction of the EDD-Chandauli and Sakaldiha under the BP 2026-27.
33 KV Link line tapping between Dala Mod to Gajraj Nagar Sonebhadra
Work of LT Line Protection and other miscellaneous works under the BP 2026-27 within the area of EDD-Chandauli, Mughalsarai and Sakaldiha.(on Semi Turn-key basis).
Work of capacity augmentation of 11/0.4 KV Distribution Transformers of various capacities under the BP 2026-27, within the jurisdiction of the EDD-Sakaldiha (on Semi Turn-key basis).
Work for the capacity augmentation of 11/0.4 kV Distribution Transformers (25 to 63 KVA and 63 to 100 KVA) under the BP 2026-27, within the jurisdiction of the EDD-Sakaldiha (on Semi Turn-key basis).