Loading…
Loading…
1,532 results • Latest
Work of Installation of new 11/0.4 KV Distribution Transformers under the BP 2026-27 within the jurisdiction of the EDD-Sakaldiha (on Semi Turn-key basis).
Work for the capacity augmentation of 11/0.4 kV Distribution Transformers under the BP 2026-27 within the jurisdiction of the EDD-IInd, Mughalsarai (on Semi Turn-key basis).
Work for the installation of new 11/0.4 KV Distribution Transformers under the BP 2026-27 within the jurisdiction of the EDD-IInd, Mughalsarai (on Semi Turn-key basis).
Construction Work of 11 KV Lines within the jurisdiction of the EDD-IInd, Mughalsarai under the BP 2026-27.
installation of LAs in 33 KV Bijpur line and earthing of LAs on every 8 to 9 pole between Nadhira and Bijpur Sub Station Sonbhadra due to heavy lightening area for reliable supply
Replacement of dilapidated conductors of the 33 KV Alinagar Line (from 220 KV Sahupuri to UPSIDC Road) within the jurisdiction of the EDD-IInd, Mughalsarai under the BP 2026-27.
Work of substation earthing, overhauling of Power TF installation of double-circuit underground cables, and construction/strengthening of 11K HT/LT lines within the Industrial Area(Phase-2) under the jurisdiction of EDD-Mughalsarai BP 2026-27.
Work of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the Industrial Area (Phase-1) under the jurisdiction of EDD- Chandauli pursuant to the BP 2026-27 (on Semi Turn-key basis).
Work regarding the capacity augmentation of 11/0.4 kV distribution transformers of various capacities under the BP 2026-27, within the jurisdiction of the EDD-Ist, Chandauli. (on Semi Turn-key basis).
Work for the Capacity Augmentation of 11/0.4 KV Distribution Transformers (25 to 63 KVA and 63 to 100 KVA) under the BP 2026-27 within the jurisdiction of the EDD-Ist, Chandauli. (on Semi Turn-key basis)
Work of strengthening of the 11 KV line under the BP 2026-27 within the jurisdiction of the EDD-Ist, Chandauli (on Semi Turn-key basis).
Construction work of 11 KV line within the jurisdiction of the EDD-Ist, Chandauli under the BP 2026-27 (on Semi Turn-key basis).
Clamps for LT Line
Work for Erection of 11 KV lines in EDD Fatehpur
Work for System strengthening of 11 KV in EDD Fatehpur
Work for Shifting of line during road widening from Sakura-Musafa-Kudni under EDD Bindki, Fatehpur
Work for Erection of Second point under EDD Khaga, Fatehpur
Work For enhancement of Various Capacity Transformers in EDD Khaga Fatehpur
Work For enhancement of Various Capacity Transformers in EDD Bindki Fatehpur
Work For enhancement of Various Capacity Transformers in EDD Fatehpur
Work for Erecction of Second Point in EDD Fatehpur
Work for Erection of Second Point in EDD Bindki, Fatehpur
Work for Replacment of Pole, Dog, Installation of TPMO and RMU under EDD Fatehpur
Work for Erection of 11 KV Lines under EDD Khaga Fatehpur
Work for Crossing of 33 KV XPLE Cable under EDD Fatehpur
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Local 24*7
Work of replacing burnt defective transformers of Executive Engineer Power Distribution Division Mirzapur
Supply of De centralized materials installation of additional T F under Business Plan 2026 27 in EDD Mirzapur
Supply of De centralized materials increasing capacity of T F under Business Plan 2026 27 in EDD Mirzapur
Supply of Materials and Erection for Shifting of Control Room Pannel at 33/ 11 KV Sub Station Bharsawa Distt. Kaushambi Under Deposit Scheme on SEMI TURNKEY BASIS under EDC, Kaushambi
Refer to Tender Description
Refer to Tender Description
Capacity enhancement work of transformers under Business Plan 2026-27 in the working area of EDD RUDHAULI Basti
Capacity enhancement work of transformers under Business Plan 2026-27 in the working area of EDD Sadar and Grameen Basti
Construction work of 11 KV line under Business Plan 2026-27 in the working area of EDD Sadar Basti
Work of installing additional transformers under Business Plan 2026-27 in the working area of EDD Sadar Rudhauli and GRAMEEN Basti.
Carriage and replacement of TF under EDD-GRAMEEN Basti
Quick repair work of fault/damage caused due to excessive heat at all 33/11 KV substations under EDD SADAR Basti
Replacement of damaged 11 KV VCB ACSR Weasel conductors installation of RMU and additional T F and supply of decentralized materials Under the Business Plan year 2026 27 EDD Chunar Mirzapur
New DT Installed Work Under BP 2026-27 EDD-Sathiyaon
Supply of De centralized materials increasing capacity of T F under Business Plan 2026 27 in EDD Chunar Mirzapur
For the work of centrifuging of Oil and Overhauling work of 10 MVA Power Transformers No. 01 and 02 of 33 KV SS Nariya and 33 KV SS Dafi Under Chetmani, Varanasi .
Printing and Photocopying Service - Photocopying; Onsite; 7; 3; With Operator; Paper to be provided by service provider; A4 (21.0 x 29.7); 75-85; JK Copier; Monochrome
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7
increasing capacity of KV Sub Station Padari Mirzapur Additional 5 MVA Transformer at Sub Station Tehsil Chunar Mirzapur
Replacement of HT LT Line and Poles under EDD GRAMEEN Basti
Various work under Deposit Head 2025 26 under EDD RUDHAULI Basti
Increasing of TF under EDD-Saidpur
work of Increasing TF under EDD-Ghazipur Nagar, Ghazipur In Business Plan 2026-27
Increasing of TF under EDD-Jangipur