Loading…
Loading…
93 results • Latest
Conducting Classified Traffic Volume count (CTVC) using mobile automatic traffic count and classifier (ATCC) survey supported by Videography as per below schedule for Hare Krishna Konar Setu at Jamalpur over river Damodar at 10th km of Raina-Jamalpur
Preparation of Detailed Project Report along with Traffic Survey and Axle Load Survey etc related to the work Gopiballavpur-Fekoghat Road from 0.00 KMP to 12.00 KMP, for the work of strengthening under Jhargram Highway Division
Khejuri Heria Road from 18.00Km to 21.00Km patch repairing work by brick stitching Fog spray Dressing and Chilchalling of road flank Kutcha drain and Jhama metal work in stretches under Tamluk Highway Division in the district of Purba Medinipur
Balighai Mohanpur Road from 7.00Km to 7.50Km 8.50Km to 9.50Km and 11.50Km to 12.00Km patch repairing work by Dressing and Chilchalling Brick stitching repairing potholes and Seal coat etc under Tamluk Highway Division
Advance Supply of readymade Bituminous Potholes patching mix using medium curing Cutback (MC-800) Bitumen and crushed stone aggregate as an instant bituminous mix for all Weather at different stackyard under Burdwan North Highway Division, P. W......
PerformingSub Surface Utility Engineering (SUE)Survey using Ground Penetrating Radar (GPR)and Electronic Cable and Pipe Locator (EPL) to find out the depth , alignment and diameter of underground utilities like Water/Gas Pipes, Electrical cables etc