Loading…
Loading…
93 results • Latest
Preparation of Detailed Project Report DPR for Egra-Bajkul raod from 0.000 kmp to 8.000 kmp Strengthening work 8.000 kmp to 15.000 kmp Surfacing work and 15.000 kmp to 51.400 km Widening And Strengthening works under Tamluk Highway Division
Preparation of Detailed Project Report DPR for Tajpur -Betahut road from 0.000 kmp to 9.450 km, Widening and Strengthening Work under Tamluk Highway Division
Preparation of Detailed Project Report for the work of Tamna-Hesla-Arsha Road from 0.00 Kmp to 5.00 Kmp and 14.00 Kmp to 22.40 Km and link road to Sirkabad, Widening for intermediate lane 5.50 m to 2-lane 7.0 m road and Strengthening work under PRL.
Preparation of Detailed Project Report for the work of Manbazar Bandwan Kuilapal Road from 27.50 to 30.00 Kmp and 35.00 to 43.17 Km, Widening from intermediate lane 5.50 m to 2-lane 7.00 m road and Strengthening work under PHD in the dist. of PRL.
Preparation of Detailed Project Report for the work of Balarampur-Bagmundi Road from 0.00 Kmp to 26.00 Kmp, Widening for intermediate lane 5.50 m to 2-lane 7.0 m road and Strengthening work, under Purulia Highway Division in the district of Purulia.
Hatgobindapur Purbabalisha Road (MDR), Urgent Patch Repairing work from 0.00 Kmp to 5.00 Kmp under Burdwan Highway Sub-Division - I of Burdwan South Highway Division in the district of Purba Bardhaman during the year2026-2027