Loading…
Loading…
435 results • Recent activity
Recovery and restoration of Banamalipur Fatepur Gotan Road from ch.1.00kmp to 4.00km and ch.4.70km to ch.5.21km (Net length 3.510 km) under Hooghly Highway Division No.1 P.W.(Roads) Directorate.
Patch repairing work from 5.00 km to 10.00 km and 11.00 km to 14.00 km in stretches of Nalhati Rajgram Road under Rampurhat Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26.
Engagement of one Luxury Taxi - Bharat Stage III and above Motor Cab or Maxi Cab (with Engine Capacity Less than or Equal to 2000 C.C. with Air-Conditioned) diesel or CNG engine on daily hiring charge for the office use of the Chief Engineer - II
Panrui Batikar Road from 5.73 km to 8.80 km (from Brahmandihi to Khustigiri) - Strengthening work along with other ancillary work under Birbhum Highway Division-II, in the District of Birbhum.
Panrui Batikar Road From 8.80 Km To 10.24 Km and Batikar Kurmitha Road From 0.00 Kmp To 1.30 Km (From Khustigiri To Batikar) - Strengthening Work along with other ancillary Work under Birbhum Highway Division-II, in the District of Birbhum.
Patch repairing work from 0.00 km to 3.20 km in stretches of Sarda Bhujung road under Rampurhat Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26.