Loading…
Loading…
437 results • Recent activity
Aherbelma Pahalanpur Road (MDR) Patch Repair works from 2.00 kmp to 5.00 kmp and 12.00 kmp to 14.00 kmp in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte In the district of Purba Bardhaman.
Ratanpur-Krishnanagar Road, At 7.069 km, Construction of damaged wing wall and allied work of bridge under Bankura Highway Division, P.W.(Roads) Directorate in the district of Bankura
Clearing and Repairing work of CD Structures, Surface drains and Box culverts at Ch. 1.536 Kmp , 2.209 Kmp, 5.332 Kmp and 7.413 Kmp of Keder Roy Road under M.H.S.D. o fB.H.D.-I, in the District of Birbhum, during the year 2025-26.
Ranibandh - Barikul Road, at 3rd km at Ghagra, Haludkanali More, Traffic calming measures under Bankura Highway Division in the District of Bankura.
Simlapal-Khatra Road, at ch. 17.60 km, Restoration work under Bankura Highway Division in the District of Bankura.
Cleaning and Repairing work for Culvert at Ch. 21.163 Kmp, 21.254 Kmp and 28.593 Kmp of Mollarpur- Majhipara- Bolpur Road under Mollarpur Highway Sub-Division of Birbhum Highway Division-I, in the District of Birbhum, during the year 2025-26.