Loading…
Loading…
450 results • Recent activity
Restoration due to Laying Gas pipeline using HDD method from Ch 0.00 km to Ch 2.287 km RHS 90 mm Dia.MDPE pipeline 2.287 km and ch1.300 km to Ch2.100 km LHS 32 mm Dia MDPE pipeline 0.800 km Total length 3.087 km along with the Bankura..
Chhatna-Susunia-Kusthalia road at Ch-13.91 km Chandra-Dhapali Repairing of Both sides Bituminous Road Approaches of the Temporary Diversion Road under Bankura Highway Division in the district of Bankura.
Bankura Saltora Road Chhatna Kenjakura Road Chhatna Bypass Road , Saltora Murulia Road, Saltora Mejia Road and Mejia Kusthal Road repairing of worn out thermoplastic paint over table top and allied works under Bankura Highway Division 2nd call
Taldangra Panchmura Chowbeta Road emergent patch repairing from 1.0 kmp to 2.00 kmp, 3.0 kmp to 4.0 kmp, 5.0 kmp to 6.0 kmp, 7.0 kmp to 8.0 kmp and 9.0 kmp to 10.0 kmp in stretches under Bankura Highway Division in the district of Bankura
Construction of Storm Water Drain from 22.92 km to 23.10 km and 22.92 km, construction of 1 m slab culvert at Bankura Saltora road under Bankura Highway Division in the district of Bankura.
Balance restoration work of damaged paver block road for freshly laid water pipeline by PIU WBDWSIP PHE, Bankura of Sabrakone -Morar road at Mandi village from ch 2.05 km to ch 2.20 km under Bankura Highway Division....2nd Call