Loading…
Loading…
450 results • Recent activity
Khoirasole Bara Jamtara road, from 10.00 kmp to 17.60 km and from 18.30 km to 19.26 km, Surfacing Work under Birbhum Highway Division No. II in the district of Birbhum.
Dharmatala Bridge over local khari at Ch. 42.44 km of Mollarpur Majhipara Bolpur Road, reconstruction of 5 cell Box Bridge in place of existing narrow bridge under Birbhum Highway Division No II in the district of Birbhum. (2nd Call).
Egra Bajkul Road from 21.00 Km to 25.00 Km, temporary patch repairing work by repairing potholes, 20 mm PC and SC in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2025 2026.
Emergent Repairing of Chanditala Seakhala Champadanga Road (SH-15) in different stretches from Ch. 0.50 km. to 2.00 kmp. from Ch. 6.00 kmp. to 7.00 kmp. Providing Bituminous Cold Mix and Potholes reparing etc. under Serampore Highway Sub-Division of
Restoration of rain cuts and flank protection during monsoon at Murarai Health Centre Road from 0.00km to 7.00km in stretches under Rampurhat Highway Sub Division of Birbhum Highway Division -I, during the year 2025-26
Chatra Rudrananagr Jajigram Road from 11.00km to 19.00km restoration of rain cuts and flank protection during monsoon under Rampurhat Highway Sub Division of Birbhum Highway Division -I, during the year 2025-26