Loading…
Loading…
671 results • Recent activity
Recovery and Restoration work of Panchgachi More to Puratanpara Masjid More via Rajanikanta School and Farir Bakultala road from 0.00 Kmp to 2.752 Km, House of Sudhanyo Ghosh to deep tube well via Pipulkhola Mathpara road from 0.00 Kmp to 3.48 Km ...
Repairing of existing damaged bituminous surface by potholes repairing in Mothabari Uttar Lakshipur Road from Ch. 0.250 Km to Ch. 1.10 Km and Ch 2.00 Kmp to Ch. 2.40 Km and Jalalpur to Sujapur to Jamirghata RSR from Ch. 0.00 kmp to 1.60 km
Kagmari to Bangitola to Panchanandapur Road from 3.80 km to 7.00 km Bituminous Potholes Repairing work, under Malda Highway Division, in the District of Malda during the year 2025-2026.
Emergent Patch repair work by Bituminous work on Kotwali Ferryghat to Pukuria Ferryghat from 6.00 to 12.00 Kmp In strethes, Link Road to Araidanga Health Centre from ch. 0.30 kmp to 0.90 Km In strethes, Mathurapur Shankoritola Ferryghat Road from...
Preparation of PPT, Details Project Report, Falling Weight Deflectometer Test, Topographical survey, Axle load survey VDF, Conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with Strengthening of Kaliachak Golapganj
Emergent repairing work of different roads in patches by pre coating stone aggregates, WBM and BM under Khejuria Highway section under Malda Highway Sub-Division under Malda Highway Division in the District of Malda during the year 2025-26. 2nd CALL