Loading…
Loading…
671 results • Recent activity
Link Road from Harishchandrapur to Barduary Road from 0.00 Kmp to 2.70 km excluding 600 m existing rigid pavement at different chainages ( from 0.12 km to 0.27 km, 1.03 to 1.13 km and 1.55 km to 1.90 km), Strengthening work under Malda Highway Divisi
Gazole Beldangi Road from 0.00 Kmp to 5.60 Km, Surfacing works under Malda Highway Division, in the District of Malda (2nd CALL). Project ID PD232404395S000
Construction of 1 No. (2m X 2m ) Single cell Box culvert at 0.90 km chainage of of Chilakhana Natabari road and allied protection work under Cooch Behar Highway Division in the district of Cooch Behar.
Emergent approach protection work at Up stream and down stream side Beside Joist Bridge over River Gadadhar at 4th Km of Choto Mahadev Village Road (BRIDGE APPROCAH)
Recovery and restoration work of Kadamtala (90 th km of SH-16) to Bagar Bazar Road (3rd km of Kakina Road ) via Tarer Par of 2.50 km length under Coochbehar Highway Division, in the District of Coochbeharfor mending up damages occurred due to heavy
Pagla Approach Road from 0.00 kmp to 6.00 kmp, Surfacing work including 0.300 km Concrete Block Pavement under Malda Highway Division in the District of Malda, Project ID PD25264007S000