Loading…
Loading…
6,275 results • Latest
Recovery and Reconstruction of Tikar Jarol Gahan Nankhari Khamadi Road Km 0.000 to 52.000 Sub head Construction of R.Wall at RD 23.875 to 23.895 24.300 to 24.310 27.705 to 27.720 and Breast wall at RD 28.030 to 28.050 Under PDNA
R.R.D on Nalaban Nagadhar Barach Road km 0.000 to 23.000. SH C.O Breast wall from Km 3.970 to 3.987 and 4.070 to 4.085) Under PDNA
Restoration of rain damages on NPB Road from Km 0.000 to 23.00 S.H. Deployment. Hiring of JCB.Excavator-cum loader for Removal of slips dressing of berms and clearance of blocked side drain
R.R. Damages on Kharela to Karangla road Km. 0.000 to 7.500 SH C.o B.wall in PCC at RD.1.475 to 1.495
Restoration of rain Damages on Nankhari to Sharog Shakla to Barog road km 0.000 to 3.000. SH C.o Breast wall from km 1.235 to 1.242.
Restoration of rain damages on Khanog Surad Bangla road from Km 0.000 to 14.400 S.H. Deployment. Hiring of JCB. Excavator cum loader for Removal of slips dressing of berms and clearance of blocked side drain.