Loading…
Loading…
6,141 results • Latest
Modernization and Renovation of Co-District Library, Murkongselek Tribal Development Block
Preparation of Detailed Project Report for the work of Manbazar Puncha Road from 0 Kmp to 8 Kmp, Widening from intermediate lane 5.50 m to 2 lane 7.00 m road and Strengthening work, under Purulia Highway Division, P.W. (Roads) Dte in the dist of PRL
Urgent Air conditioning copper pipe work at Nursing Training School Building at Alipurduar District Hospital campus in the district of Alipurduar .
Electrical Installation work and SITC of air conditioning system for new constructed MOS chamber along with ante chamber and attached toilet at 7th floor of Vigyan Chetana Bhawan Salt Lake Kolkata 700064 Electrical Installation Work
Supply of Excavator Backhoe Loader
Electrical Installation work and SITC of air conditioning system for new constructed MOS chamber along with ante chamber and attached toilet at 7th floor of Vigyan Chetana Bhawan Salt Lake Kolkata 700064 SITC of AC Machines.