Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3 LAccepted-AOC | ₹3 L | L1 | Accepted-AOC Stands Lowest. |
| 2 | L2₹3.5 L+₹55,000 (18.3%)Rejected-Finance | ₹3.5 L+₹55,000 (18.3%) | L2 | Rejected-Finance Quoted rate is higher than the L1 bidder. |
| 3 | L3₹4.5 L+₹1.5 L (50.0%)Rejected-Finance | ₹4.5 L+₹1.5 L (50.0%) | L3 | Rejected-Finance Quoted rate is higher than the L2 bidder. |
| Sl No | Description | Qty | Unit | ALFRESCO CONSTRUCTION SERVICES L1 | TECHNOCONS CONSTRUCTION L3 | Pal Precision Survey L2 |
|---|---|---|---|---|---|---|
| 1.00 | Preparation of Detailed Project Report (DPR) for the work of Manbazar-Puncha Road from 0.00 Kmp to 8.00 Kmp, Widening from intermediade lane (5.50 m) to 2-lane (7.00 m) road & Strengthening work, under Purulia Highway Division in the District of Purulia. i. Topographical Survey using RTK/ DGPS & preparation of Drawing(s) with all necessary features including marking of ROW, Land Demarcation, Borrow pits, existing formation and carriageway width, BM (GTS Benchmark),
ii. Carrying out FWD test and analysis of deflection data as per IRC 115-2014 for overlay design, including distress mapping for adopting suitable frequency.
iii. Conducting 7 days 24 hrs Continuous Traffic Count Survey (CTVC) (One Location of Each lane)
iv. Conducting Axle Load Survey, Determination of VDF (48 hours both direction), Axle Load Spectrum as per IRC 58-2015.
v. Investigation of Hard Crust Composition and determination of In Situ CBR Value of Subgrade Soil using DCPT Method
vi. Road furniture Drawings for the project stretch is to be prepared and duly signed by Certified Road Safety Auditor.
vii. Existing Drainage Condition and proposed drainage scheme
viii. Detailed Condition Survey of Culverts with proposal for replacement, widening scheme, maintenance.
ix. Still Photography and video photograph for details of road alignment with ROW for power point presentation.
x. Preparation of Plan & Profile with improvement of horizontal & vertical geometrics as per codal provisions and within the available ROW and site conditions in consultation with the Executive Engineer submission of drawing volume.
xi. Preparation of Power Point Presentation.
xii. Submission of Final DPR
• Volume–I(Report with Estimate)–6(Six)Nos
• Volume–II(Drawings)-6(Six)Nos– Hard Copies and Soft Copy in CDs | 1 | Job | 3,00,000 ₹3,00,000 Lowest | 4,50,000 ₹4,50,000 | 3,55,000 ₹3,55,000 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
24 Jul 2026, 12:30 pmClosed
ASSISTANT ENGINEER, MANBAZAR HIGHWAY SUB-DIVISON
Office of the Assistant Engineer, Manbazar Highway Sub-Division
Preparation of Detailed Project Report for the work of Manbazar Puncha Road from 0 Kmp to 8 Kmp, Widening from intermediate lane 5.50 m to 2 lane 7.00 m road and Strengthening work, under Purulia Highway Division, P.W. (Roads) Dte in the dist of PRL
2026_WBPWD_5016072_1
WBPWRD/AE/MHSD/eNIQ- 02/26-27
Open Tender
CIVIL WORKS
Item Rate
14 days
Manazar
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Yes
21 Sept 2026
29 Jun 2026
27 Jul 2026
29 Jun 2026
24 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of Detailed Project Report (DPR) for the work of Manbazar-Puncha Road from 0.00 Kmp to 8.00 Kmp, Widening from intermediade lane (5.50 m) to 2-lane (7.00 m) road & Strengthening work, under Purulia Highway Division in the District of Purulia. i. Topographical Survey using RTK/ DGPS & preparation of Drawing(s) with all necessary features including marking of ROW, Land Demarcation, Borrow pits, existing formation and carriageway width, BM (GTS Benchmark),
ii. Carrying out FWD test and analysis of deflection data as per IRC 115-2014 for overlay design, including distress mapping for adopting suitable frequency.
iii. Conducting 7 days 24 hrs Continuous Traffic Count Survey (CTVC) (One Location of Each lane)
iv. Conducting Axle Load Survey, Determination of VDF (48 hours both direction), Axle Load Spectrum as per IRC 58-2015.
v. Investigation of Hard Crust Composition and determination of In Situ CBR Value of Subgrade Soil using DCPT Method
vi. Road furniture Drawings for the project stretch is to be prepared and duly signed by Certified Road Safety Auditor.
vii. Existing Drainage Condition and proposed drainage scheme
viii. Detailed Condition Survey of Culverts with proposal for replacement, widening scheme, maintenance.
ix. Still Photography and video photograph for details of road alignment with ROW for power point presentation.
x. Preparation of Plan & Profile with improvement of horizontal & vertical geometrics as per codal provisions and within the available ROW and site conditions in consultation with the Executive Engineer submission of drawing volume.
xi. Preparation of Power Point Presentation.
xii. Submission of Final DPR
• Volume–I(Report with Estimate)–6(Six)Nos
• Volume–II(Drawings)-6(Six)Nos– Hard Copies and Soft Copy in CDs | 1 | Job | 1 | ₹1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Circular.pdf
Other Document • 2.91 MB
BOQ_5085293.xls
BOQ • 0.23 MB
form_2911.pdf
Tender Documents • 0.51 MB
1st_Corrigendum.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .