Loading…
Loading…
Found 15 active tenders
15 results • Latest
Bituminous road work using hot mix plant and paver finisher
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
Providing and fixing Iron net doors at FSD Adra
Providing and fixing Mild steel expanded metal 20x60 mm strands 3.25 mm wide 2.24 mm thick with frame of 40x40x6 mm angle iron and using flats 30x6 mm for diagonal braces and central cross piece with providing 40x5 mm flat iron hold fast 400 mm long including fixing to frame with 10 mm diameter bolts, nuts and wooden plugs and embedding in cement concrete block 300x100x150 mm 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), all necessary fittings complete, including applying a priming coat of approved steel primer and two coats of synthetic enamel paint complete as per direction of Engineer in charge.
PROVISION OF MESH DOORS AT EACH SHUTTER OPENING OF THE GODOWNS AT FCI FSD CHARRAH
Providing and fixing Mild steel expanded metal 20x60 mm strands 3.25 mm wide 2.24 mm thick with frame of 40x40x6 mm angle iron and using flats 30x6 mm for diagonal braces and central cross piece with providing 40x5 mm flat iron hold fast 400 mm long including fixing to frame with 10 mm diameter bolts, nuts and wooden plugs and embedding in cement concrete block 300x100x150 mm 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), all necessary fittings complete, including applying a priming coat of approved steel primer and two coats of synthetic enamel paint complete as per direction of Engineer in charge.
SUPPLY OF 10000 MT PORTLAND POZZOLANA CEMENT (PPC) AS PER IS-1489 (PART 1)-2015 AT 2x660 MW DVC RAGHUNATHPUR TPS PHASE-II.
Installation of 8 nos. Solar High mast light with 10 m. Height on NH-18 alongwith 3 years Operation and Maintenance
UNIT_4_CONSTRUCTION GUARDWALL AND REPAIRING OF WORKS UNDER TULIN GP
UNIT-4: 1-Guard wall from Bablu laha house from Shankar Chandra house(APAS/01/240/31/0024) 2-Repairing of Chamardag Primary School and paint(APAS/01/240/23/0001) 3-Repairing of Tulin Majpara Community hall.(APAS/01/240/28/0002)