Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
4,406 results • Latest
BARRICATING WORK FOR VVIP PROGRAM AND OTHER PROGRAMS UNDER HQ-1 SUB DIVISION INDORE
WW, CW, DISTEMPERING AND PAINTING WORK AT E TYPE BUNGLOW UNDER RESIDENCY SECTION INDORE
WW, CW, DISTEMPERING AND PAINTING WORK AT RESIDENTIAL JUDICIAL BUNGLOW KAILESH KOTHI UNDER CRP LINE SECTION INDORE
WW, CW, DISTEMPERING AND PAINTING WORK AT I AND R TYPE QUARTERS UNDER RESIDENCY SECTION INDORE
WW, CW, DISTEMPERING AND PAINTING WORK AT B TYPE BUNGLOW UNDER RESIDENCY SECTION INDORE
WW, CW, DISTEMPERING AND PAINTING WORK AT G TYPE QUARTERS UNDER RESIDENCY SECTION INDORE
WW, CW, DISTEMPERING AND PAINTING WORK AT RESIDENTIAL QUARTERS UNDER MGM SECTION INDORE
WW, CW, DISTEMPERING AND PAINTING WORK AT D TYPE BUNGLOW UNDER RESIDENCY SECTION INDORE
ROOF REPAIR AND WATER PROOFING TREATMENT OF GOVT. BUILDING SECTION SIRMOUR UNDER P.W.D. SUB DIVISION NO.3 REWA
CONSTRUCTION OF GRAM PANCHAYAT KHAMARIYA IN GRAM KHUSAHA TO DUARANATH MANDIR APPRAOACH ROAD LENGTH 2.00 KM. UNDER SUB DIVISION TEOTHAR
BT Patch Repair work of Katora Selda Road Length 8.07 Km. Under Sub Division Barwah
Water Proofing work and Well Portection work in Polytechnic College Sanawad Under Sub Division Barwah
Door window and toilet repair work in Boys Hostel Ground floor Polytechnic College Sanawad Under Sub Division Barwah
Water Proofing and Celing Plaster for Polytechnic College Boys Hostel Sanawad Under Sub Division Barwah
Colour and Plaster form Polytechnic College Boys Hostel Sanawad Under Sub Division Barwah
B.T. Patch Repair Work Under Sub Division Barwah
STRENGTHENING WORK OF SEGWAL APPROACH ROAD LENGTH 1.50 KM., WASVI APPROACH ROAD LENGTH 1.60 KM. TOTAL LENGTH 3.10 KM.
STRENGTHENING WORK OF DAWANA BRAHMANGAON ROAD LENGTH 4.58 KM.
STRENGTHENING WORK OF BHORWADA TO OZER ROAD LENGTH 1.60 KM., DEWALA APPROACH ROAD LENGTH 1.30 KM. TOTAL LENGTH 2.90 KM.
STRENGTHENING WORK OF VARLA TO BAKHARLI ROAD LENGTH 5.80 KM.
STRENGTHENING WORK OF PADACHA APPROACH ROAD LENGTH 5.00 KM.
S.R./A.R. Work of Judiciary Quater under P.W.D. Sub Dn. Betul.
S.R./A.R. Work of Court Building under P.W.D. Sub Dn. Betul.
Survey Investigation and Preparation of D.P.R. and Land Plan of Various Roads P.W.D. Sub Dn. Betul and Bhainsdesh.
Annual Maintanance of Damage of Various Road and Bridge/Culvert under P.W.D. Sub Dn. Betul.
AR, SR, MOW and Deposit work on Govt. Residential Building and Non Residential Building under PWD Sub. Division No.2 Vidisha.
W/W., C/W. of N.R.B. under P.W.D. Sub Dn. Betul.
White Washing Colour Washing and Distempering work on Govt. Residential Building and Non Residential Building under H.Q. Section PWD Sub. Division No.1 Vidisha.
W/W., C/W. of R.B. under P.W.D. Sub Dn. Betul.
S.R./A.R. Work of F Type Below Qtr. R.B. under P.W.D. Sub Dn. Betul.
S.R., A.R. Work of F Type Above Qtr. R.B. under P.W.D. Sub Dn. Betul.
S.R./A.R. Work of N.R.B. under P.W.D. Sub Dn. Betul.
For Providing Shifting of 33 KV/ 11 KV/ LT Line for Clearing left turns from Chetak Bridge to Govindpura Left Turn, (ISBT), Bhopal
For Providing Electrification Work for RR /SR/MOW/OW in Various Residential Judges Quartes in Judges Enclave under Shyamla Hills Section of PWD (E/M) Sub Division M-1, Bhopal
For Providing Electrification Work for RR /SR/MOW/OW in B-8, B-9, Bungalows at Civil Lines and B-4 Bungalow Under Shyamla Hills Section of PWD (E/M) Sub Division M- 1, Bhopal
Repairing of Bridge culvert shoulder repair and other repair works in Majholi section under HQ sub Dn no 1 jbp
Widening of Gohparu Rasmohni Burhar (Bhatiya) Road Length 900 mtr in Black Spot Area DAV School Burhar Distt Shahdol
Repairing of Bridge culvert shoulder repair and other repair works in Kantangi section under HQ sub Dn no 1 jbp
Repairing of Bridge culvert shoulder repair and other repair works in Panagar section under HQ sub Dn no 1 jbp
Maintenance and varius repairng work WPC shutters Viterified flour and wall tiles etc work in Non Justice bunglow in MPHC under HQ section in Hq no 3 jbp
Strengthing of Harratola Approch road Length 2.40 Km
PBMC work on Rajendragram Leelatola road Length 23.30 Km Proposed Km 1.00 to 5.00 , Leelatola Benibari Goghari Road Length 26.70 Km Proposed Km. 31.00 to 34.00
Construction of Pirkardiya to Kshipra Ghat Silotiya road Length 3.20 Km (i/c Electrical pole shifting) 4th call
Construction of Chittoda Gaushala Approach Road Length 2.00 km (i/c electric pole shifting work) (4th call)
Special Repair Work P.W.D. Campus And Fencing Work District Morena
Annual Repair Of Bridge Under Sub Division Mandla In Distt Dindori
WHITE WASHING COLOUR WASHING AND PAINTING WORK ON GOVT. NON RESIDENTIAL BUILDING (P.W.D. AND COURT DEPTT. UNDER SUB DIVISION BARWANI.
Special Strengthening of Sausar Rajna Road Length 20.20 Km. (2nd Call)
Repair and Renovation of Slab at Govt. Girls Digree Collage Sidhi, Under PWD Section-HQ-I, Sub Division Sidhi,PWD Building SOR w.e.f 01-01-24
White washing, Colour Washing and Painting Work of Govt. Residential Building Under Sec.HQ 01 , PWD Sub Division-Sidhi, PWD Building SOR w.e.f 01-01-24