Loading…
Loading…
4,112 results • Latest
CONSTRUCTION OF KORIGAWAN HOSPITAL TO MAOLIYA NARAINI ROAD LENGTH 2.10 KM AND DHANGAN TO DOODHA IN DEOTALAB TAMARI ROAD LENGTH 1.50 KM TOTAL LENGTH 3.60 KM. UNDER PWD SUB DIVISION MANGANWA
COSNSTRUCTION OF NARAINI HIGH SCHOOL TO BADIGAWAN APPROACH ROAD LENGTH 2.00 KM. AND FULAHA TO JHUSI APPROACH ROAD LENGTH 1.50 KM. TOTAL LENGTH 3.50 KM. UNDER PWD SUB DIVISION MAUGANJ
COSNSTRUCTION OF REWA SIRMOUR MAIN ROAD TO GARGAN TOLA GAGAHARA APPROACH ROAD LENGTH 3.00 KM. UNDER PWD SUB DIVISION NO.3 REWA
Various AR, SR, Deposite, MOW, Anurakshan Work in Govt. Residential Building in Section Unchehara, Under Sub Division Nagod.
Annual repair work of Govt. Non Residential Building Under Sub Division Khilchipur (2nd Call)
Annual repair work of Govt. Residential Building Under Sub Division Khilchipur (2nd Call)
WW CW distempering and painting etc. in Residential Buildings of GRP Section and Poultry Farm Section under PWD. City Sub Dn. No.3 Bhopal.
BT RENEWAL WORK OF BUDHANWARA TO KONDA DEORI RAMKHIRIYA MANDIR ROAD LENGTH 8.50 KM.
WW CW distempering and painting etc. in District and Session Court and Nyayik Sewa Sadan Bhopal under PWD. City Sub Dn. No.3 Bhopal.
Electrification work of A/R, S/R, Original Work / MOW / Renovation / Deposit work of Residential Buildings and Court Building, PWD Ofiices, Rest House / Circuit House under Non Residential Buildings under Kukshi and Manawar Section, E/M Sub-Dvn Dhar
Special Repair Work Of Residential Quarter No. I-01 And I-02 P.W.D. Division Office Campus Morena
Construction Work Of Running Track For Students At Nehru Degree Collage Campus Sabalgarh Length 0.40 Km.
STRENGTHENING OF ABARMATA ADAWAN ROAD LENGTH 5.70 KM PAC 413.11 LAKH
ZONAL TENDER FOR FLOOD DAMAGE RECTIFICATION ROAD MAINTENANCE AND OTHER EMERGENCY ROAD WORK UNDER PWD (B/R) DIVISION NO.1 SAGAR PAC 300.00 LAKH
B.T. RENEWAL WORK IN DIFFERENT ROADS UNDER P.W.D SUB DIVISION SAGAR LANGTH 14.06 KM PAC 324.84 LAKH (GROUP-I) 1. SAGAR BYPASS GADOLI BANGUWAN PRATHVIPUR ROAD LENGTH- 7.6 KM PAC 161.37 LAKH 2.BHAPEL JAISINAGAR Road 3.00 KM (BT over CC) PAC 83.26
White wash/Colour Wash and Painting in Govt. Non Residential Building Under Sub Division Khilchipur (2nd Call)
CONSTRUCTION OF HIGH ROAD DIVIDER AND CENTRAL LIGHTING WORK AT BANGALI SQUARE TO BICHOLI MARDANA (VIA MAYANK BLUE WATER PARK) (SECOND CALL)
ANURAKSHAN WORK IN RESIDENTIAL AND NON RESIDENTIAL BUILDING AT H.Q.ASHTA UNDER PWD SUB DIVISION ASHTA
ANURAKSHAN WORK IN RESIDENTIAL AND NON RESIDENTIAL BUILDING AT HOUSING BOARD AND COURT AREA UNDER PWD SUB DIVISION SEHORE
Maintanance of Roads (Under PBMC Scheme) (1) Padliya Approach Road Length 6.20 Km. (2) Siddiquiganj Ilahi Dehmat Road Length 5.00 Km. (3) Bhaukhedi Barkhedakurmi Bishankhedi Road Length 7.20 Km. Total Length 18.40 Km
Maintanance of Roads (Under PBMC Scheme) (1) Imlikheda Tankpura Road Length 4.40 Km. (2) Hardol Baba Mandir To Mata Mandir Road Length 0.85 Km. (3) Bilquisganj To Neebukheda Via Patni Salikheda Road Length 4.50 Km. (4) Lasidiya Parihar Bijlon Road Le
CONSTRUCTION OF SUMREDI TO SEMA DHANA ROAD INCLUDING ELECTRIFICATION WORK (TOTAL LENGTH - 3.50 KM) PAC 409.10 LACS ( II - CALL )
CONSTRUCTION OF KHAKRON TO ISURWARA ROAD INCLUDING ELECTRIFICATION WORK LENGTH 4.50 KM PAC 498.61 LACS (2nd Call)
DRR 22188 MODEL BM (B/R PADARIYA ROAD SECTION JABALPUR.)
DRR 11458 MODEL AJ 810 (REST HOUSE KUNDAM)
Various AR, SR, Deposite, MOW, Anurakshan Work in Govt. Residential Building in Section Nagod, Under Sub Division Nagod
Various AR, SR, Deposite, MOW, Anurakshan Work in Govt. Non Residential Building Circuit House Satna, under Sub Division Satna.
Various AR, SR, Deposite, MOW, Anurakshan Work in Govt. Residential Building in Town Section, under Sub Division Satna
Construction of servant Qtr at Justice Bungalow No. A-4, Pachpedhi Jabalpur. (Deposit work)
CONSTRUCTION OF BRIDGE AT BHAGWATKHEDI KATKATKHEDI TO BHAGORA ROAD
Strengthening work of Ajneri to Jhiramta road under P.W.D. Sub Dn. Pipariya. 1st Call, PAC Rs. 189.84 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Shobhapur Hanuman Madhiya to Kumhabad road upto Bhoukhedi under P.W.D. Sub Dn. Pipariya. 1st Call, PAC Rs. 151.95 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Mathni to Semritala road under P.W.D. Sub Dn. Pipariya. 1st Call, PAC Rs. 175.88 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Tender for Construction of Keolari Kheda to Talatali Road Length 1.60 Km. under Sub-Dn. Keolari.IInd Call
REPLACEMENT OF OLD BURNT RUPTURED DAMAGED ACCESSORIES IN SWITCH YARD AT ATAL BIHARI VAJPAYEE GOVT MEDICAL COLLEGE VIDISHA DIST VIDISHA
ZONAL EF WORK AR/SR WORK IN RB/MOW/DEPOSITE WORKS OF VARIOUS SECTIONS UNDER PWD E/M SECTION BUDHNI, SHAHGANJ, BHAIRUNDA,SEHORE DIST SEHORE
ZONAL EF WORK AR/SR WORK IN RB/MOW/DEPOSITE WORKS OF VARIOUS SECTIONS UNDER PWD E/M SECTION SEHORE,ASHTA,ICHHAWAR,SHYAMPUR DIST SEHORE
B.T. Patch Repair, Hard Shoulder and Other Work on Various Roads Under PWD Sub Division Barwani.
Construction of Chourahat to Hathnabad road. 3rd Call, PAC Rs. 239.25 Lacs on Road Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 150 days i/c rainy season.
Strengthening of Raisalpur to Panjra Road, Length 3.80 Km. under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 146.26 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Const. of Siraula Sulkhan Basti to Kahasadol Jogi pahadi Patel Singh House Beside Nahar App. Raod , L- 3.00 Km, Under Sub. Dn. Majhauli, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25
Strengthening work of Shivpur Talkesri road under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 220.25 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Const. of Silwar Madwas Main Road to Bagahiya Tola Via Shri Babalu Singh House App. Raod , L- 4.50 Km, Under Sub. Dn. Majhauli, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25
Construction of Sagoni Tikariya Road Length- 5.60 km. (including Pole Shifting)
Construction of Baroda-Bharota-Talgaon to Badagaon Road Length 3.50 Km. Under Hatta Sub Division With Electrification
Strengthening work of Jatlapur Approach Road Length 1.30 Km. And Chhindwara Narsinghpur NH-547 To Jamuniya Mahadev Mela Road Length 4.10 Km. Total Length 5.40 Km. (Ist-Call)
Strengthening work of Datlawadi To Sarekhadhana Road. Length 1.00 Km with electrification work. And Nandora Approach Road 1.20 Km. Total Length 2.20 Km (Ist-Call)
Strengthening work of Flood Damaged CD on Naisarai to Mahana ( Ashoknagar Esagarh Road) via Amrod, Singakhedi, Ranth, Umari, Kirroda, Kanera, Dhurra Chhailai Road at Km 10/2 and Strengthening work of Flood Damaged CD on Wajidpur to Panwari Hat Road
Construction of Two Lane Road of Kardawad Kesharpura Road Length 3.50km. i/c Utility Pole Shifting Work.
WHITE WASH COLOUR AND PAINTING WORK FOR RESIDENTIAL BUILDING AT SUB DIVISION AGAR DISTT AGAR MALWA