Loading…
Loading…
4,112 results • Latest
AR/SR work of B, D, E Type Govt. residential Buildings under HQ Section sub division Dhar.
Maintenance Of Various Road Under Sub Division Baihar
Supply Of Material Various Road For Head Quarter Section Katangi Under Sub Division Waraseoni
Supply Of Material Various Road For Head Quarter Section Waraseoni Under Sub Division Waraseoni
Supply Of Material Various Road Under Sub Division No. 1 Balaghat.
White Washing Color Washing Work Judicial Residential Building Under Sub Division No. 1 Balaghat.
AR WORK FOR WATER PROOFING TREATMENT OF R.B. UNDER H.Q.1 SUB DIVISION GWALIOR
Construction of culvert at Gandhigram NH-7
WPT on roof of Govt. Resi. Qrts. under Rajbhawan Section Bhopal.
Restoration and Maintenance of road 1 NH 45 and NH 543 Junction to start point of Dindori Sagartola Kabirchabutra road Length 2 KM 2 Start Point of Dindori Mandla road to NH 45 and 543 Junction 2.00 KM
Restoration Maintenance of road Chilman chouwk mandla to end point of Dindori Mandla road NH 543 Length 3.80 Km)
Restoration Maintenance of road in in Ponda Nalla railway Under bridge in km 5 on NH 543 Length 300 M
A/R, S/R Work as per for Requirement in Residential Building Under Sub Dn. Mehgaon District, Bhind (M.P.)
A/R, S/R Work as per for Requirement in Residential Building Under Sub Dn. No.1 Bhind District, Bhind (M.P.)
Maintenance Patch repair work on Various Roads Under PWD Sub Division Lahar Distt. Bhind (M.P.)
AR, SR Work as per requirement in RB Under Sub Dn. No.1 and No.02 Bhind
AR, SR Work as per requirement in RB Under Sub Dn. Mehgaon and Gohad
AR, SR Work as per requirement in NRB Under Sub Dn. No.1 Bhind
S.R. Work On Murawali App. Road Ch- 100m. Under Sub Dn. Lahar L. 1.00 K.m.
Construction of Returtning wall for Protect the District Collector Office and Bunglow Due to Soil Erosion on the Banks of Narmada River in District Mandla
Construction of Four lane of Sarangpur city Portion Old AB road NH 3 road length 7.00 km and Providing Pole Shifting and height raising of 33kv, 11kv LT line and DTR Shifting in Sarangpur city portion road PAC 3614.37 Lacs Second call
Helipad And Bericating Transportaion And Tent Work Under P.W.D. Sub Div. Gohad (For V.I.P./V.V.I.P Visit)
Aluminium work, doors, windows work, tiles work, bathroom renovation with new pipe line and other work at Katanga section, Jabalpur.
BT Paitch Repair Works On Various Roads Under Sub Dn. No.1 Bhind
Tiles work, bathroom renovation work, doors, windows and Aluminium work in different Qtrs. Of JEC section Jabalpur.
BT Paitch Repair Works On Various Roads Under Sub Dn. Lahar and Road Lahar
Annual Repaires and Maintance Work In Bridge Sub Division Jabalpur In Distt Jabalpur
Metal Collection For P.R. Work On Various Roads Under Sub Dn. No. 1 Bhind
Construction Of Gaushala at Alampur Lahar Sub Division Bhind (MLA Fund Deposit Work)
Construction Of Community Hall at Ward No. 10 Near Vankhandeshwar Temple at Sub Dn. Lahar Distt. Bhind (MLA Fund Deposit Work)
Construction Of Community Hall at Taleswar Temple, Bhatantal at Sub Dn. Lahar Distt. Bhind (MLA Fund Deposit Work)
Maintenance Work at Collectorate Building Bhind (M.P.)
BT Renewal Work On Various Road Under Sub Dn. No.1 Bhind
BT Renewal Work On Various Road Under Sub Dn. Gohad (Total Length 18.29 K.m.)
BT Renewal Work On Various Road Under Sub Dn. No.2 Bhind. (Total Length 10.07 K.m.)
AR, SR, MOW Work as per requirement Under Sub Dn. Mehgaon
AR, SR, MOW Work as per requirement Under Sub Dn. Road Lahar
Comprehensive Interior Finishing and Functional Up gradation Works Including Wall Paneling, Granite Worktop, Storage Racks, False Ceiling, Aluminum Partition and Flooring Work in Newly Allotted Office of the Paramedical Department Under N.S.C.B. Me
B.T. Renewal work Padlyamata to Dugya road length 3.72 km PAC 83.86 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
For Providing Internal Electrification, CCTV Camera, UPS System, Computer Cabling, Wi-Fi, EPABX, PA System and VRV Air Conditioning 6 No. Gate and 1 No. Gate HCM House Bhopal.
FOR PROVIDING E/F WORK RR/SR/DEPOSIT/MOW/OW IN RESIDENTIAL BUILDINGS UNDER PWD (E/M) SUB DIVISION M-1 (HCM HOUSE/POLICE BARRACK AND THANA AREA) BHOPAL
PROVIDING AND SHIFTING 11/33 KV LINE LT LINE AND DTR DUE TO ROAD WIDNING FROM DOUBLE FAATAK TO BIRJAKHEDI ROAD AT DISTRICT HARDA
PROVIDING CHANGEOVER OTHER ELECTRICAL PROTECTIVE GEAR FOR GROUND FLOOR ELECTRIC PANEL ROOM AT COLLECTRATE NARMADAPURAM DISTT NARMADAPURAM
For Pole Shifting and Height Raising of 33 KV, 11 KV, LT Line and DTR for Nehru Nagar Square Bhopal
FOR PROVIDING E/F WORK RR/SR/DEPOSIT/MOW/OW IN RESIDENTIAL BUILDINGS UNDER PWD (E/M) SUB DIVISION M-1 (HCM HOUSE SAMATVA BHAWAN AND 6 No. HALL) BHOPAL
POLE SHIFTING AND HEIGHT RAISING OF 11KV, LT LINE AND DTR TRANSFORMER DUE TO CONSTRUCTION OF ROAD FROM GAUKHEDI TO BADJHIRI ROAD (3.30 KM) DIST SEHORE
FOR PROVIDING SHIFTING OF 33 KV/ 11 KV/ LT LINE AND DTR SHIFTING FOR CLEARING LEFT TURN AT SHIVAJI NAGAR SQUARE AND VYAPAM SQUARE BHOPAL SECTION JP HOSPITLA BHOPAL PWD E/M SUB DN M-2 BHOPAL
FOR PROVIDING E/F WORK RR/SR/DEPOSIT/MOW/OW IN NON RESIDENTIAL BUILDING AT PROFESSOR COLONY, UNDER PWD (E/M) SUB DIVISION M-1 BHOPAL
FOR PROVIDING E/F WORK FOR RR/SR/ DEPOSIT/MOW/OW WORK IN RESIDENTIAL BUILDINGS (F AND G- TYPE) AT PROFESSOR COLONY, HAMIDIA HOSPITAL UNDER PWD (E/M) SUB DIVISION M-1 BHOPAL
FOR PROVIDING E/F WORK FOR RR/SR/ DEPOSIT/MOW/OW WORK IN RESIDENTIAL BUILDINGS (D AND E- TYPE) AT PROFESSOR COLONY, UNDER PWD (E/M) SUB DIVISION M-1 BHOPAL