Loading…
Loading…
4,041 results • Recent activity
Maintenance work Civil Ground floor to 4th floor including basement and MLCP at Nabanna, during the year 2026 27
SITC of Covid Spracific infrastructure in Proposed 40 beded COVID HDU Medicine at Fifth floor CB Building under RG KAR MCH Electrical Installation Work
Budge Budge Trunk Road-Permanent restoration work for 2308.00 mtr. Of trench (Ch-8.72 km to Ch.11.00 km-Bituminous Carriage way/Footpath at different stretches an at Ch. 8.33 km-Cross cut-Mastic carriage way) Total trench length 2308.00 mtr. For layi
Emergent repairing of Kuchitala Milan Bazar Road from 5.50 kmp to 8.00 kmp under canning Sub-Division of South 24 Parganas Division, PWD, during the year 2025-2026. (In Stretches)
Emergent repairing of Canning Dock Ghat (Auto Stand) tiger project office to Uttar Taldi Janakalyan more from 6.40 kmp, to 8.00 kmp under Canning Sub-Division of South 24 Parganas Division, PWD, During the year 2025-2026.(In Stretches)
Emergent repair to Baruipur Champahati Link Road from Ch-0.50km-1.50km by repearing potholes and allied works in strtches under south 24 parganas Division, PWD during the year 2025-2026.